| Tender Name/No. | Notice Inviting Tenders(NIT) | Bid Document | Nature of work | Submission Date/Time | Opening Date/Time | ||
| Tenders - Civil | |||||||
| NITNO. 07/2013-14/EE/BSNL/CD-I/CHD Dated:- 14-5-2013 | 07NIT139589.htm | 07NIT139589.pdf | Day to day mtce. to BSNL Staff Quarters Sector-27, Chandigarh for the year 2013-2014 (Up to 31-3-2014) | 23-05-2013 15:00:00 |
23-05-2013 15:30:00 |
||
| NITNO. 07/2013-14/EE/BSNL/CD-I/CHD Dated:- 14-5-2013 | 07NIT139590.htm | 07NIT13(i)9590.pdf | Day to day mtce. to BSNL Staff Quarters Sector-30, Chandigarh for the year 2013-2014. ( up to 31-3-2014 | 23-05-2013 15:00:00 |
23-05-2013 15:30:00 |
||
| NITNO. 07/2013-14/EE/BSNL/CD-I/CHD | 07NIT139591.htm | 07NIT13(ii)9591.pdf | Day to day mtce to BSNL Admn. and Technical Buildings under the jurisdiction of BSNL Civil Sub Division-I, Chandigarh for the year 2013-2014 (up to 31-3-2014) | 23-05-2013 15:00:00 |
23-05-2013 15:30:00 |
||
| NITNO. 07/2013-14/EE/BSNL/CD-I/CHD Dated:- 14-5-2013 | 07NIT139592.htm | 07NIT13(iii)9592.pdf | Day to day mtce to Technical and Admn. Buildings under the jurisdiction of BSNL Civil Sub Division-IV, Chandigarh for the period 2013-2014 (up to 31-3-2014 | 23-05-2013 15:00:00 |
23-05-2013 15:30:00 |
||
| NITNO. 07/2013-14/EE/BSNL/CD-I/CHD dated 14-5-2013 | 07NIT139593.htm | 07NIT13(iv)9593.pdf | Day to day mtce. to BSNL Staff Quarters Sector-43A, Chandigarh during the period 2013-14. (Up to 31-3-2014) | 23-05-2013 15:00:00 |
23-05-2013 15:30:00 |
||
| NITNO. 07/2013-14/EE/BSNL/CD-I/CHD Dated:- 14-5-2013 | 07NIT139594.htm | 07NIT13(v)9594.pdf | Day to day mtce. to BSNL Staff Quarters Sector-36A, 36B and 39B and TE building Sector-37, Chandigarh for the period 2013-14. ( Up to 31-3-2014) | 23-05-2013 15:00:00 |
23-05-2013 15:30:00 |
||
| NITNO. 07/2013-14/EE/BSNL/CD-I/CHD Dated:- 14-5-2013 | 07NIT139595.htm | 07NIT13(vi)9595.pdf | Day to day mtce. to BSNL Staff Quarters Sector-44A, Chandigarh during the period 2013-14. ( up to 31-3-2014) | 23-05-2013 15:00:00 |
23-05-2013 15:30:00 |
||
| NITNO. 07/2013-14/EE/BSNL/CD-I/CHD Dated:- 14-5-2013 | 07NIT139596.htm | 07NIT13(vii)9596.pdf | Day to day mtce to BSNL Admn. And Technical Building under the jurisdiction of BSNL Civil Sub Division-III, Chandigarh for the period 2013-2014 ( up to 31-3-2014) | 23-05-2013 15:00:00 |
23-05-2013 15:30:00 |
||
| 01/2013-14/EE/BSNL/CD/LDH Dated 10.05.2013 | BSNL W-6 NIT 019580.htm | NIT 01-13149580.doc | Construction of cable duct works across Sidhwan Canal due to six laning of Ferozepur Road near Verka Milk Plant, Ludhiana | 21-05-2013 15:00:00 |
21-05-2013 15:30:00 |
||
| NIT No.12/EE/BSNL/CD/PTA/2013-2014 Dated : 07.05.2013 | bsnl w-69560.htm | Tender Document9560.pdf | Repair of GSM Tower at Sherpur in SSA Sangrur. | 18-05-2013 15:00:00 |
18-05-2013 15:30:00 |
||
| NIT No: 13/EE/BSNL/CD/PTA/2013-14 Dated: 07.05.2013 | bsnl w-69561.htm | Tender Document9561.pdf | Construction of Foundation and Erection of 5Nos. 40Mtr.NBLW Towers in Patiala SSA.(SH:ERECTION) | 17-05-2013 15:00:00 |
17-05-2013 15:30:00 |
||
| NIT No: 14/EE/BSNL/CD/PTA/2013-14 Dated: 07.05.2013 | bsnl w-69562.htm | Tender Document9562.pdf | Construction of Foundation and Erection of 10 Nos. 40 Mtr.NBLW Towers in Sangrur, SSA. (SH:ERECTION of 5 Nos. Towers) (Phase-1) | 17-05-2013 15:00:00 |
17-05-2013 15:30:00 |
||
| NIT No.15/EE/BSNL/CD/PTA/2013-2014 Dated: 08.05.2013. | bsnl w-69566.htm | Tender Document9566.pdf | CONSTRUCTION OF DG FOUNDATION AND INSTALLATION OF PRE FABRICATED SHELTERS AT 8 NOS. TOWERS SITES IN SANGRUR SSA (SH: 4 NOS. SITES) PHASE-I. | 17-05-2013 15:00:00 |
17-05-2013 15:30:00 |
||
| NIT No.11/EE/BSNL/CD/PTA/2013-2014 Dated: 07.05.2013. | bsnl w-69559.htm | Tender Document9559.pdf | RAISING OF RHS AND BACK SIDE COMPOUND WALL FOR SECURITY OF CMTS STORE NEAR COLONY GATE, RTTC RAJPURA. | 16-05-2013 15:00:00 |
16-05-2013 15:30:00 |
||
| 05/EE/BSNL/CD-II/CHD/2013-14Dated08.05.2013 | W69568.htm | 05-Nit Fencing9568.pdf | “Provision of Barbed wire fencing at BSNL Tower Site at Swaraj Enclave, Kharar.” | 16-05-2013 15:00:00 |
16-05-2013 15:30:00 |
||
| 03/EE/BSNL/CD/JL/NIT/2013-14 Dt. 09-05-2013 | NIT 039571.htm | Tender039571.doc | Day to day maintenance to BSNL Buildings and Staff quarters under BSNL Civil Sub Division II Jalandhar for the year 2013-14. | 16-05-2013 15:00:00 |
16-05-2013 15:30:00 |
||
| NIT 039572.htm | APPLICATION9572.doc | Day to day maintenance to BSNL Buildings and Staff quarters under BSNL Civil Sub Division II Jalandhar for the year 2013-14. | 16-05-2013 15:00:00 |
16-05-2013 15:30:00 |
|||
| 04/EE/BSNL/CD/JL/NIT/2013-14 Dt. 09-05-2013 | NIT049573.htm | Tender049573.doc | Day to day maintenance to Technical, Admn. Buildings and Staff quarters under the juridiction BSNL CSD I Jalandhar during the period 2013-14. | 16-05-2013 15:00:00 |
16-05-2013 15:30:00 |
||
| NIT049574.htm | APPLICATION 049574.doc | Day to day maintenance to Technical, Admn. Buildings and Staff quarters under the juridiction BSNL CSD I Jalandhar during the period 2013-14. | 16-05-2013 15:00:00 |
16-05-2013 15:30:00 |
|||
| 05/EE/BSNL/CD/JL/NIT/2013-14 Dt. 09-05-2013 | NIT059575.htm | Tender059575.doc | Raising of Manhole Necks and sealing of Cable duct from MTS Nagar to Nakodar Chowk, Shastri Market and Kishan Pura Chowk, Jalandhar City. | 16-05-2013 15:00:00 |
16-05-2013 15:30:00 |
||
| NIT059576.htm | APPLICATION 059576.doc | Raising of Manhole Necks and sealing of Cable duct from MTS Nagar to Nakodar Chowk, Shastri Market and Kishan Pura Chowk, Jalandhar City. | 16-05-2013 15:00:00 |
16-05-2013 15:30:00 |
|||
| 05/EE/BSNL/CD-II/CHD/2013-14Dated08.05.2013 | corrigendum_1W6_09_05_20139578.htm | “Provision of Barbed wire fencing at BSNL Tower Site at Swaraj Enclave, Kharar.” | 16-05-2013 15:30:00 |
||||
| NIT No: 10/EE/BSNL/PTA/2013-2014 Dated :- 01.05.2013 | bsnl w-69542.htm | Tender Document9542.pdf | Hiring of Vehicle for use of Executive Engineer(Civil), BSNL Civil Division, Patiala for the year 2013-2014 | 13-05-2013 15:00:00 |
13-05-2013 15:30:00 |
||
| NIT No.09/EE/BSNL/CD/PTA/2013-2014 Dated:30.04.2013. | bsnl w-69535.htm | Tender Document9535.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS UNDER BSNL CIVIL SUB DIVISION PATIALA FORM MAY 2013 TO OCTOBER 2013. | 09-05-2013 15:00:00 |
09-05-2013 15:30:00 |
||
| 02/EE/BSNL/CD/JL/NIT/2013-14 Dated:- 30.04.2013 | NIT 029539.htm | Tender nit 029539.doc | Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Hoshiarpur SDCA)”(3rd Call) | 09-05-2013 15:00:00 |
09-05-2013 15:30:00 |
||
| NIT 029540.htm | APPLICATION9540.doc | Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Hoshiarpur SDCA)”(3rd Call) | 09-05-2013 15:00:00 |
09-05-2013 15:30:00 |
|||
| NITNO. 06/2013-14/EE/BSNL/CD-I/CHD Dated:- 01-5-2013 | 06NIT139546.htm | 06NIT139546.pdf | A/R and M/O to BSNL Staff Quarters for the year 2013-14 (SH: Silicon Treatment on exposed brick Cladding of staff Quarters block No. 425 and epoxy treatment inside Type-V staff quarters) Sector- 30 | 09-05-2013 15:00:00 |
09-05-2013 15:30:00 |
||
| NITNO. 03/2013-14/EE/BSNL/CD-I/CHD Dated:- 29-4-201 | 03NIT139529.htm | 03NIT139529.pdf | Maintainance of Horticulture works in BSNL House Sector 30-A and in the Compound of T.E building Sector-20, Chandigarh | 07-05-2013 15:00:00 |
07-05-2013 15:30:00 |
||
| NITNO. 04 /2013-14/EE/BSNL/CD-I/CHD Dated:- 29-4-2013 | 04NIT139531.htm | 04NIT139531.pdf | Maintenance and Operational jobs in the o/o Sub Divisional Engineer(C), BSNL Civil Sub Division-I Chandigarh for the Year 2013-14 | 07-05-2013 15:00:00 |
07-05-2013 15:30:00 |
||
| 04/EE/BSNL/CD-II/CHD/2013-14dated29-04-2013 | W69532.htm | 04-Nit Fencing9532.pdf | Provision of Barbed wire fencing at BSNL Tower Site at Swaraj Enclave Kharar | 07-05-2013 15:00:00 |
07-05-2013 15:30:00 |
||
| W69533.htm | 04a-Nit-Mtce9533.pdf | Maintenance and operational jobs in O/o Executive Engineer (C) BSNL civil Division II Chandigarh from May 2013 to April 2014 | 07-05-2013 15:00:00 |
07-05-2013 15:30:00 |
|||
| NIT No: 07/EE/BSNL/CD/PTA/2013-14 Dated: 22.04.2013 | bsnl w-69510.htm | Tender Document9510.pdf | Construction of Foundation and Erection of 5Nos. 40Mtr.NBLW Towers in Patiala SSA.(SH:ERECTION) | 06-05-2013 15:00:00 |
06-05-2013 15:30:00 |
||
| NIT No: 08/EE/BSNL/CD/PTA/2013-14 Dated: 22.04.2013 | bsnl w-69511.htm | Tender Document9511.pdf | Construction of Foundation and Erection of 10 Nos. 40 Mtr.NBLW Towers in Sangrur, SSA. (SH:ERECTION of 5 Nos. Towers) (Phase-1) | 06-05-2013 15:00:00 |
06-05-2013 15:30:00 |
||
| 03/EE/BSNL/CD-II/CHD/CSD/PKL/2013-14 dated 26.04.2013 | w69523.htm | 03-Nit sd pkl 13-149523.pdf | Dismantling of BTS shelter from Cretch of Sector 20 Chandigarh and its reinstallation at 2nd floor roof of TE Sec 15 Panchkula | 06-05-2013 15:00:00 |
06-05-2013 15:30:00 |
||
| NIT NO : 01/EE/BSNL/CD/ASR/2013-14 dated 29.04.2013. | NIT 019528.htm | Tender document9528.doc | Petty works and reconstruction of damaged boundary wall portion at OFC station complex Gurdaspur. | 06-05-2013 15:00:00 |
06-05-2013 15:30:00 |
||
| NIT 019530.htm | application 19530.doc | Petty works and reconstruction of damaged boundary wall portion at OFC station complex Gurdaspur. | 06-05-2013 15:00:00 |
06-05-2013 15:30:00 |
|||
| NITNO. 05 /2013-14/EE/BSNL/CD-I/CHD Dated:- 01-05-2013 | 05NIT139543.htm | 05NIT139543.pdf | Dismantling of tower from LG Electronics and installing at BSNL plot at Sector 27A, Chandigarh (SH: Anchoring of Steel bars in existing columns).” | 06-05-2013 15:00:00 |
06-05-2013 15:30:00 |
||
| NIT No.06/EE/BSNL/CD/PTA/2013-2014 Dated: 18.04.2013. | bsnl w-69507.htm | Tender Document9507.pdf | Provision of Girders in feed store, Rolling shutters in workshop and MS gates/Sheets etc. in Wheat Straw storage and replacement of broken A.C. sheets etc. in CIRB Sub Campus at Nabha. | 01-05-2013 15:00:00 |
01-05-2013 15:30:00 |
||
| NIT No.03/EE/BSNL/CD/PTA/2013-2014 Dated: 17.04.2013. | bsnl w-69498.htm | Tender Document9498.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS (OTHER THAN RTTC) IN SDCA RAJPURA FORM MAY 2013 TO OCTOBER 2013. | 29-04-2013 15:00:00 |
29-04-2013 15:30:00 |
||
| NIT No.04/EE/BSNL/CD/PTA/2013-2014 Dated:17.04.2013. | bsnl w-69499.htm | Tender Document9499.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS UNDER BSNL CIVIL SUB DIVISION PATIALA FORM MAY 2013 TO OCTOBER 2013. | 29-04-2013 15:00:00 |
29-04-2013 15:30:00 |
||
| NIT No.05/EE/BSNL/CD/PTA/2013-2014 Dated: 17.04.2013. | bsnl w-69500.htm | Tender Document9500.pdf | CONSTRUCTION OF DG FOUNDATION AND INSTALLATION OF PRE FABRICATED SHELTERS AT 8 NOS. TOWERS SITES IN SANGRUR SSA (SH: 4 NOS. SITES) PHASE-I. | 29-04-2013 15:00:00 |
29-04-2013 15:30:00 |
||
| 02/EE/BSNL/CD-II/CHD/2013-14 Dated: 22-04-2013 | W69512.htm | 02-NIT9512.pdf | Day to day civil maintenance in the area under the jurisdiction of SDE(C), CSD, Panchkula for the period April 2013 to March, 2014. | 29-04-2013 15:00:00 |
29-04-2013 15:30:00 |
||
| 02/EE/BSNL/CD-II/CHD/2013-14 Dated: 22-04-2013 | W69513.htm | 02a-NITd2d RPR-13-149513.pdf | Day to day maintenance of BSNL Buildings under Ropar SSA upto 31-03-2014. | 29-04-2013 15:00:00 |
29-04-2013 15:30:00 |
||
| 02/EE/BSNL/CD-II/CHD/2013-14 Dated: 22-04-2013 | W69514.htm | 02b-NIT grt,PKL-13-149514.pdf | Demolishing damaged grit plaster after checking and redoing the same on outer walls of Data Centre building in TE compound Sector-20, Panchkula. | 29-04-2013 15:00:00 |
29-04-2013 15:30:00 |
||
| NIT No. 02/EE/BSNL/CD/PTA/2013-2014 Dated : 15.04.2013 | bsnl w-69493.htm | Tender Document9493.pdf | Repair of GSM Tower at Sherpur in SSA Sangrur. | 25-04-2013 15:00:00 |
25-04-2013 15:30:00 |
||
| 01/EE/BSNL/CD/JL/NIT/2013-14 Dt. 16-04-2013 | NIT019496.htm | APPLICATION 019496.doc | Provision of PVC pipes duct and Chambers for under ground cable duct in CTO compound at Jalandhar. | 25-04-2013 15:00:00 |
25-04-2013 15:30:00 |
||
| NIT019497.htm | TENDER019497.doc | Provision of PVC pipes duct and Chambers for under ground cable duct in CTO compound at Jalandhar. | 25-04-2013 15:00:00 |
25-04-2013 15:30:00 |
|||
| NIT No.01/EE/BSNL/CD/PTA/2013-2014 Dated: 10.04.2013. | bsnl w-69486.htm | Tender Document9486.pdf | Maintenance of Lawns/Trainee Parks in RTTC Complex at Rajpura from April 2013 to March 2014. | 22-04-2013 15:00:00 |
22-04-2013 15:30:00 |
||
| . 01 /EE/BSNL/CD/ASR/13-14/ 256 dated:- 18.04.2013 | Quotation9504.htm | Schdule Quotation9504.doc | Sealing of cable duct chamber near Tahli Sahib Bazar at Amritsar. | 22-04-2013 15:00:00 |
22-04-2013 15:30:00 |
||
| NIT NO. 02/2013-14/EE/BSNL/CD-I/CHD Dat | 02NIT139478.htm | 02NIT139478.pdf | Special repairs to BSNL Staff Quarters at Sector-30, Chandigarh. | 11-04-2013 15:00:00 |
11-04-2013 15:30:00 |
||
| 01/EE/BSNL/CD-II/CHD/2013-14 dated 02.04.2013 | W69476.htm | NIT01PKL9476.pdf | Demolishing damaged grit plaster after checking and redoing the same on outer walls of Data Centre building in TE compound Sector 20 Panchkula | 10-04-2013 15:00:00 |
10-04-2013 15:30:00 |
||
| 79/2012-13/EE/BSNL/CD/LDH Dated 25.03.2013 | BSNL W-6 NIT 799455.htm | NIT 79-12139455.doc | A/R and M/O and minor repair to TE Building compound at Talwandi Bhai (2nd Call) | 09-04-2013 15:00:00 |
09-04-2013 15:30:00 |
||
| 80/2012-13/EE/BSNL/CD/LDH Dated 25.03.2013 | BSNL W-6 NIT 809456.htm | NIT 80-12139456.doc | A/R and M/O to BSNL Buildings in Ferozepur SSA for the year 2013-14 (SH: Day to day maintenance of Buildings under BSNL Civil Sub Division-I, Ferozepur) (2nd Call) | 09-04-2013 15:00:00 |
09-04-2013 15:30:00 |
||
| 60/EE/BSNL/CD/ASR/2012-13 dated 28.03.2013. | NIT9464.htm | Tender document9464.doc | Renovation of D.E.T( city-I) office room in Old T.E. Building at Amritsar. | 09-04-2013 15:00:00 |
09-04-2013 15:30:00 |
||
| NIT9465.htm | A P P L I C A T I O N9465.doc | Renovation of D.E.T( city-I) office room in Old T.E. Building at Amritsar. | 09-04-2013 15:00:00 |
09-04-2013 15:30:00 |
|||
| NIT NO : 61/EE/BSNL/CD/ASR/2012-13 dated 30.03.2013. | B S N L W 69466.htm | Tender document9466.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Ranjit Avenue , Amritsar during the Year 2013-14 ( Phase-1) . | 09-04-2013 15:00:00 |
09-04-2013 15:30:00 |
||
| B S N L W 69467.htm | A P P L I C A T I O N9467.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Ranjit Avenue , Amritsar during the Year 2013-14 ( Phase-1) . | 09-04-2013 15:00:00 |
09-04-2013 15:30:00 |
|||
| NIT no 62/EE/BSNL/CD/ASR/2012-13 dated 30.03.2013. | NIT9468.htm | Tender document9468.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg , Amritsar during the Year 2013-14 ( Phase-1). | 09-04-2013 15:00:00 |
09-04-2013 15:30:00 |
||
| NIT9469.htm | A P P L I C A T I O 19469.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg , Amritsar during the Year 2013-14 ( Ph | 09-04-2013 15:00:00 |
09-04-2013 15:30:00 |
|||
| NIT No: 01/2013-14/EE/BSNL/CD-I/CHD Dated 01-4-2013. | 01NIT139474.htm | 01NIT139474.pdf | Hiring of 1 No. of Non Air Conditioned Tata Indica Cars for 1700 Kms. Per month for the office of Chief Engineer(C), BSNL, Punjab Civil Zone, Chandigarh | 09-04-2013 15:00:00 |
09-04-2013 15:30:00 |
||
| Quotation No. 01 /EE/BSNL/CD/PTA/2013-14 Dated: 03.04.2013 | Quotation Notice9477.htm | Schedule of quantity9477.pdf | Provision of Post constructional Anti termite treatment in Seminar hall at ground floor in Admn. Bldg. in RTTC complex at RTTC Rajpura. | 06-04-2013 15:00:00 |
06-04-2013 15:30:00 |
||
| NIT No.51/EE/BSNL/CD/PTA/2012-2013 Dated: 18.03.2013. | bsnl w-69426.htm | Tender document9426.pdf | Provision of Partition wall between Tower portion and TE compound and Provision of Barbed wire fencing on wall between staff quarter and Tower portion in TE compound at Dera Bassi. | 02-04-2013 15:00:00 |
02-04-2013 15:30:00 |
||
| NIT No.52/EE/BSNL/CD/PTA/2012-2013 Dated: 19.03.2013. | bsnl w-69434.htm | Tender Document9434.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS (OTHER THAN RTTC) IN SDCA RAJPURA FORM APRIL 2013 TO SEPTEMBER 2013. | 02-04-2013 15:00:00 |
02-04-2013 15:30:00 |
||
| NIT No. 53/EE/BSNL/CD/PTA/2012-2013 Dated : 20.03.2013 | bsnl w-69437.htm | Tender Document9437.pdf | Repair of GSM Tower at Sherpur in SSA Sangrur. | 02-04-2013 15:00:00 |
02-04-2013 15:30:00 |
||
| NIT NO : 58/EE/BSNL/CD/ASR/2012-13 dated 20.03.2013. | NIT9440.htm | T E N D E R D O C U M E N T9440.doc | Horticulture works and Upkeeping of Lawns / Plants in T.E. Building Compound Pathankot and Gurdaspur during the 2013-14(April 2013-September 2013). year | 28-03-2013 15:00:00 |
28-03-2013 15:30:00 |
||
| NIT9441.htm | A P P L I C A T I O N 589441.doc | Horticulture works and Upkeeping of Lawns / Plants in T.E. Building Compound Pathankot and Gurdaspur during the 2013-14(April 2013-September 2013). year | 28-03-2013 15:00:00 |
28-03-2013 15:30:00 |
|||
| NIT NO : 59/EE/BSNL/CD/ASR/2012-13 dated 20.03.2013. | NIT9442.htm | Tender document9442.doc | Maintenance Operational Jobs in O/o the SDE( C ) Pathankot during the year2013-14( April-2013 to September -2013). | 28-03-2013 15:00:00 |
28-03-2013 15:30:00 |
||
| NIT9443.htm | Application9443.doc | Maintenance Operational Jobs in O/o the SDE( C ) Pathankot during the year2013-14( April-2013 to September -2013). | 28-03-2013 15:00:00 |
28-03-2013 15:30:00 |
|||
| 02/EE/BSNL/PCD/MHL/2012-2013 Dated : 04.03.2013 | web nit9384.htm | Vehicle Mohali NIT9384.pdf | Hiring of Vehicle for use of Executive Engineer(Civil), BSNL Project Civil Division, Mohali from April,2013 to February,2014 ( Except | 22-03-2013 15:00:00 |
22-03-2013 15:30:00 |
||
| NIT No. 27/EE/BSNL/CD-II/CHD/2012-13 Dated: 15.03.2013 | W69423.htm | 27nit12-139423.pdf | “Demolishing damaged grit plaster after checking and redoing the same on outer walls of Data Centre building in TE compound Sector-20, Panchkula”. | 22-03-2013 15:00:00 |
22-03-2013 15:30:00 |
||
| NITNo35/2012-13/EE/BSNL/CD-I/CHD Dated12-3-2013 | 35NIT129416.htm | 35NIT129416.pdf | Hiring of 1 No. of Non Air Conditioned Tata Indica Cars for 1600 Kms. Per month for the O/o Superintending Engineer(c), BSNL Civil Circle-I, Chandigarh. | 20-03-2013 15:00:00 |
20-03-2013 15:30:00 |
||
| 77/2012-13/EE/BSNL/CD/LDH dated 14.03.2013 | BSNL W-6 NIT 779420.htm | NIT 77-12139420.doc | A/R and M/O and minor repair to TE Building compound at Talwandi Bhai | 20-03-2013 15:00:00 |
20-03-2013 15:30:00 |
||
| 78/2012-13/EE/BSNL/CD/LDH Dated 14.03.2013 | BSNL W-6 NIT 789421.htm | NIT 78-12139421.doc | A/R and M/O to BSNL Buildings in Ferozepur SSA for the year 2013-14 (SH: Day to day maintenance of Buildings under BSNL Civil Sub Division, Moga) | 20-03-2013 15:00:00 |
20-03-2013 15:30:00 |
||
| NITNo35/2012-13/EE/BSNL/CD-I/CHD Dated12-3-2013 | NIT35 corrigendum9422.htm | Hiring of 1 No. of Non Air Conditioned Tata Indica Cars for 1600 Kms. Per month for the O/o Superintending Engineer(c), BSNL Civil Circle-I, Chandigarh. | 20-03-2013 15:30:00 |
||||
| 76/2012-13/EE/BSNL/CD/LDH Dated 12.03.2013 | BSNL W-6 NIT 769419.htm | NIT 76-12139419.doc | A/R and M/O to BSNL Buildings in Ferozepur SSA for the year 2013-14 (SH: Day to day maintenance of Buildings under BSNL Civil Sub Division-I, Ferozepur) | 19-03-2013 15:00:00 |
19-03-2013 15:30:00 |
||
| NIT No.47/EE/BSNL/CD/PTA/2012-2013 Dated: 02.03.2013. | bsnl w-69381.htm | Tender Document9381.pdf | CONSTRUCTION OF DG FOUNDATION AND INSTALLATION OF PRE FABRICATED SHELTERS AT 4 NOS. TOWER SITES IN PATIALA SSA. | 16-03-2013 15:00:00 |
16-03-2013 15:30:00 |
||
| NIT No.48/EE/BSNL/CD/PTA/2012-2013 Dated: 04.03.2013. | bsnl w-69386.htm | Tender Document9386.pdf | PROVISION OF BARBED WIRE FENCING ON FRONT SIDE OF BSNL TE COMPOUND AT SIRHIND. | 16-03-2013 15:00:00 |
16-03-2013 15:30:00 |
||
| NIT No. 49/EE/BSNL/CD/PTA/2012-2013 Dated :05.03.2013 | bsnl w-69389.htm | Tender document9389.pdf | Repair of GSM Tower at Sherpur in SSA Sangrur. | 16-03-2013 15:00:00 |
16-03-2013 15:30:00 |
||
| 74/2012-13/EE/BSNL/CD/LDH Dated 08.03.2013 | BSNL W-6 NIT 749404.htm | NIT 74-12139404.doc | A/R and M/O to BSNL Buildings in Ludhiana SSA for the year 2013-14 (SH: Day to day maintenance of TE Buildings under BSNL Civil Sub Division-I, Ludhiana) | 16-03-2013 15:00:00 |
16-03-2013 15:30:00 |
||
| 75/2012-13/EE/BSNL/CD/LDH dated 08.03.2013 | BSNL W-6 NIT 759405.htm | NIT 75-12139405.doc | A/R and M/O to BSNL Buildings in Ludhiana SSA for the year 2013-14 (SH: Day to day maintenance of Staff Quarters under BSNL Civil Sub Division-I, Ludhiana) | 16-03-2013 15:00:00 |
16-03-2013 15:30:00 |
||
| NIT No. 50/EE/BSNL/CD/PTA/2012-2013 Dated: 08.03.2013. | BSNL w-69406.htm | Tender Document9406.pdf | Day to day maintenance of BSNL buildings in RTTC compound at Rajpura from March 2013 to June 2013. | 16-03-2013 15:00:00 |
16-03-2013 15:30:00 |
||
| Quotation No.01/EE/BSNL/PCD/MHL/2012-13 Dated: 04 .03.2013. | quotation notice9385.htm | computer BOQ9385.doc | Purchase of computer with Peripheral for use of SDE(C), BSNL Project Civil Sub Division-II, Mohali. | 11-03-2013 15:00:00 |
15-03-2013 15:30:00 |
||
| NIT No.45/EE/BSNL/CD/PTA/2012-2013 Dated: 26.02.2013. | bsnl w-69362.htm | Tender Document9362.pdf | Repair and Recarpeting of Internal Farm Roads at CIRB , Sub Campus Nabha. | 13-03-2013 15:00:00 |
13-03-2013 15:30:00 |
||
| 73/2012-13/EE/BSNL/CD/LDH Dated 01.03.2013 | BSNL W-6 NIT 739376.htm | NIT 73-12139376.doc | Construction of Foundation and Erection of 05 Nos 40 metre NBLW towers in Bathinda SSA (Part-II) (SH: Construction of 05 Nos. Tower Foundations in Bathinda SSA) | 13-03-2013 15:00:00 |
13-03-2013 15:30:00 |
||
| NIT No:25 /EE/BSNL/CD-II/CHD/2012-13 Dated: 06-03-2013 | w69393.htm | DG Fd9393.pdf | Construction of DG Foundations and Installation of Pre-fabricated shelters at 4 nos tower sites at Ropar SSA. | 13-03-2013 15:00:00 |
13-03-2013 15:30:00 |
||
| NIT No: 25 /EE/BSNL/CD-II/CHD/2012-13 Dated: 06-03-2013 | W69392.htm | DG Fd9392.pdf | Construction of DG Foundations and Installation of Pre-fabricated shelters at 5nos. tower sites in Chandigarh SSA. | 13-03-2013 15:00:00 |
13-03-2013 15:30:00 |
||
| NIT No. : 26/EE/BSNL/CD/CHD-II/2012-13 Dated : 06 -03-2013 | W69394.htm | NIT 26 of 12-139394.pdf | Supply of Computer printer and UPS for the office of use of office of SDEC BSNL civil sub division Mohali and supply of Computer and UPS for the office of SEC BSNL Civil Circle II Chandigarh. | 13-03-2013 15:00:00 |
13-03-2013 15:30:00 |
||
| NIT NO : 54/EE/BSNL/CD/ASR/2012-13 dated 28.02.2013. | nit 55 BSNL 9395.htm | Corrigendum9395.doc | A/R and M/O to BSNL Staff Quarters in Amritsar SSA for the year 2012-2013. (SH Miscellaneous repair and painting to 3 Nos. new Blocks of Staff quarters and compound wall in P and T Colony , Goal Bag | 11-03-2013 15:00:00 |
11-03-2013 15:30:00 |
||
| NIT NO : 56/EE/BSNL/CD/ASR/2012-13 dated 02.03.2013. | nit 56B S N L W 69396.htm | Corrigendum9396.doc | Aluminium Partition in Transmission Equipment Room 2nd Floor E10B Building at Pathankot | 11-03-2013 15:00:00 |
11-03-2013 15:30:00 |
||
| NIT NO : 57/EE/BSNL/CD/ASR/2012-13 dated 02.03.2013. | nit57 B S N L W 69397.htm | Corrigendum9397.doc | Provision of RCC shelves for storage of mobile CAFs at ground floor of E 10B Building at Pathankot | 11-03-2013 15:00:00 |
11-03-2013 15:30:00 |
||
| NIT NO : 55/EE/BSNL/CD/ASR/2012-13 dated 28.02.2013 | nit 55 BSNL 9398.htm | Corrigendum9398.doc | A/R and M/O to BSNL Buildings in Amritsar SSA for the year 2012-2013. (SH Miscelleanous repair and painting to Microwave building,Staff quarters and Compound wall at Mall Mandi Amritsar). | 11-03-2013 15:00:00 |
11-03-2013 15:30:00 |
||
| 54/EE/BSNL/CD/ASR/2012-13 dated 28.02.2013. | NIT9369.htm | Tender document9369.doc | A/R and M/O to BSNL Staff Quarters in Amritsar SSA for the year 2012-2013. (SH Miscellaneous repair and painting to 3 Nos. new Blocks of Staff quarters and compound wall in P and T Colony , Goal B | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
||
| NIT9370.htm | A P P L I C A T I O N9370.doc | A/R and M/O to BSNL Staff Quarters in Amritsar SSA for the year 2012-2013. (SH: Miscellaneous repair and painting to 3 Nos. new Blocks of Staff quarters and compound wall in P and T Colony , Goal Ba | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
|||
| 55/EE/BSNL/CD/ASR/2012-13 dated 28.02.2013. | NIT9371.htm | Tender document9371.doc | “A/R M/O to BSNL Buildings in Amritsar SSA for the year 2012-2013. (SH: Miscelleanous repair and painting to Microwave building,Staff quarters Compound wall at Mall Mandi Amritsar). | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
||
| NIT9372.htm | A P P L I C A T I O N9372.doc | A/R M/O to BSNL Buildings in Amritsar SSA for the year 2012-2013. (SH: Miscelleanous repair and painting to Microwave building,Staff quarters Compound wall at Mall Mandi Amritsar). | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
|||
| NIT No. 46/EE/BSNL/CD/PTA/2012-2013 Dated:01.03.2013. | bsnl w-69375.htm | Tender Document9375.pdf | Day to day maintenance of BSNL buildings in RTTC compound at Rajpura from March 2013 to June 2013. | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
||
| NIT NO : 56/EE/BSNL/CD/ASR/2012-13 dated 02.03.2013. | B S N L W 69377.htm | Tender document9377.doc | Aluminium Partition in Transmission Equipment Room 2nd Floor E-10B Building at Pathankot. | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
||
| 56/EE/BSNL/CD/ASR/2012-13 dated 02.03.2013. | B S N L W 69378.htm | Application9378.doc | Aluminium Partition in Transmission Equipment Room 2nd Floor E-10B Building at Pathankot. | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
||
| NIT NO : 57/EE/BSNL/CD/ASR/2012-13 dated 02.03.2013. | B S N L W 69379.htm | Tender document9379.doc | Provision of RCC shelves for storage of mobile CAFs at ground floor of E10 B Building at Pathankot. | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
||
| B S N L W 69380.htm | A P P L I C A T I O N9380.doc | Provision of RCC shelves for storage of mobile CAFs at ground floor of E10 B Building at Pathankot. | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
|||
| B S N L W 69382.htm | A P P L I C A T I O N9382.doc | Provision of RCC shelves for storage of mobile CAFs at ground floor of E10 B building at Pathankot. | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
|||
| Quotation No.05/EE/BSNL/CD/PTA/12-13 Dated: 04.03.2013. | Quatition Notice9387.htm | Schedule of Quantity9387.pdf | Provision of missing nuts/bolts and tightening of nuts/bolts of Bapror GBT Tower and its Platform in SDCA Rajpura. | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
||
| NIT NO : 57/EE/BSNL/CD/ASR/2012-13 dated 02.03.2013. | nit57 B S N L W 69399.htm | Tender document nit579399.doc | Provision of RCC shelves for storage of mobile CAFs at ground floor of E- 10B Building at Pathankot | 08-03-2013 15:00:00 |
08-03-2013 15:30:00 |
||
| NIT NO. 33/2012-13/EE/BSNL/CD-I/CHD Dated: - 26-2-2013 | 33NIT129365.htm | 33NIT129365.pdf | Dismantling of Grill from Compound Wall Ramdarbar, I.A., Phase-II, Chandigarh | 06-03-2013 15:00:00 |
06-03-2013 15:30:00 |
||
| NIT NO. 34/2012-13/EE/BSNL/CD-I/CHD Dated: - 26-2-2013 | 34NIT129366.htm | 34NIT129366.pdf | Dismantling of Tower from LG Electronics and installing at BSNL Plot at Sector 27A, Chandigarh | 06-03-2013 15:00:00 |
06-03-2013 15:30:00 |
||
| 71/2012-13/EE/BSNL/CD/LDH Dated 26.02.2013 | BSNL W-6 NIT 719367.htm | NIT 71-12139367.doc | Hiring of 01 No. Non - Air Conditioned light commercial Diesel Motor Car for the O/o Executive Engineer (Civil) BSNL Civil Division, Ludhiana for the year 2013-14 (RE-CALL) | 05-03-2013 15:00:00 |
05-03-2013 15:30:00 |
||
| 72/2012-13/EE/BSNL/CD/LDH Dated 26.02.2013 | BSNL W-6 NIT 729368.htm | NIT 72-12139368.doc | Hiring of 01 No. Non - Air Conditioned light commercial Diesel Motor Car for the O/o Superintending Engineer (Civil) BSNL Civil Circle, Ludhiana for the year 2013-14 (RE-CALL) | 05-03-2013 15:00:00 |
05-03-2013 15:30:00 |
||
| 24 /EE/BSNL/CD-II/CHD/2012-13 Dated: 23-02-2013 | W69358.htm | DG Fd9358.pdf | Construction of DG foundations and installation of pre fabricated shelters at 5 nos. tower sites in Chandigarh SSA. | 04-03-2013 15:00:00 |
04-03-2013 15:30:00 |
||
| 70/2012-13/EE/BSNL/CD/LDH Dated 22.02.2013 | BSNL W-6 NIT 709355.htm | NIT 70-12139355.doc | A/R and M/O to BSNL TE Building, Staff Quarters, Santary Post, Compound Wall at Raikot and Staff Quarters at Jagraon in Ludhiana SSA for the year 2013-14 | 04-03-2013 15:01:00 |
04-03-2013 15:30:00 |
||
| 24 /EE/BSNL/CD-II/CHD/2012-13 Dated: 23-02-2013 | w69359.htm | DG Fd9359.pdf | Construction of DG foundations and installation of Pre-fabricated shelters at towre sites at Ropar SSA.. | 04-03-2013 15:00:00 |
04-03-2013 15:30:00 |
||
| 69/2012-13/EE/BSNL/CD/LDH Dated 20.02.2013 | BSNL W-6 NIT 699346.htm | NIT 69-12139346.doc | A/R and M/O to BSNL Buildings in Ludhiana SSA for the year 2012-13 (SH: Miscellaneous repair and painting to TE Compound at Kohara and Machhiwara) | 01-03-2013 15:00:00 |
01-03-2013 15:30:00 |
||
| 67/2012-13/EE/BSNL/CD/LDH Dated 19.02.2013 | BSNL W-6 NIT 679344.htm | NIT 67-12139344.doc | Hiring of 01 No. Non - Air Conditioned light commercial Diesel Motor Car for the O/o Executive Engineer (Civil) BSNL Civil Division Ludhiana for the year 2013-14 | 26-02-2013 15:00:00 |
26-02-2013 15:30:00 |
||
| 68/2012-13/EE/BSNL/CD/LDH Dated 19.02.2013 | BSNL W-6 NIT 689345.htm | NIT 68-12139345.doc | Hiring of 01 No. Non - Air Conditioned light commercial Diesel Motor Car for the O/o Superintending Engineer (Civil) BSNL Civil Circle, Ludhiana for the year 2013-14 | 26-02-2013 15:00:00 |
26-02-2013 15:30:00 |
||
| NITNO. 32 /2012-13/EE/BSNL/CD-I/CHD Dated:- 15-2-2013 | 32NIT129339.htm | 32NIT129339.pdf | Provision of Horticulture Works in BSNL House Sector 30-A and in the compound of T.E building Sector-20, Chandigarh | 23-02-2013 15:00:00 |
23-02-2013 15:30:00 |
||
| 52/EE/BSNL/CD/ASR/2012-13 Dated 14.02.2013 | NIT529334.htm | Tender529334.doc | A.R. and M.O. to BSNL Buildings in Pathankot SSA for the year 2012-13 (SH:- Miscellaneous repair and painting works to E-10B Building T.E. compound Pathankot) 2nd Call | 22-02-2013 15:00:00 |
22-02-2013 15:30:00 |
||
| NIT529335.htm | APPLICATION 529335.doc | A.R. and M.O. to BSNL Buildings in Pathankot SSA for the year 2012-13 ( SH:- Miscellaneous repair and painting works to E-10B Building T.E. compound Pathankot) 2nd Call | 22-02-2013 15:00:00 |
22-02-2013 15:30:00 |
|||
| NIT NO: 53/EE/BSNL/CD/ASR/2012-13 Dt. 15.02.2013 | NIT539337.htm | Tender539337.doc | Dismantling Damaged Grit Plaster including Re-plastering the same of E-10-B Building at Pathankot.(3rd Call ) | 22-02-2013 15:00:00 |
22-02-2013 15:30:00 |
||
| NIT539338.htm | APPLICATION 539338.doc | Dismantling Damaged Grit Plaster including Re-plastering the same of E-10-B Building at Pathankot.(3rd Call ) | 22-02-2013 15:00:00 |
22-02-2013 15:30:00 |
|||
| NIT No: 56/EE/BSNL/CD/JL/NIT/2012-13 dated 07.02.2013 | Hoshiarpur SDCA NIT 569305.htm | Tender Hoshiarpur SDCA nit 569305.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Hoshiarpur SDCA)”(2nd Call) | 21-02-2013 15:00:00 |
21-02-2013 15:30:00 |
||
| Hoshiarpur SDCA NIT 569306.htm | APPLICATION9306.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Hoshiarpur SDCA)”(2nd Call) | 21-02-2013 15:00:00 |
21-02-2013 15:30:00 |
|||
| NIT No: 57/EE/BSNL/CD/JL/NIT/2012-13 dated 07.02.2013 | Garh Shankar SDCA NIT579307.htm | Tender Garh Shankar SDCA9307.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Garh Shankar SDCA) (2nd Call) | 21-02-2013 15:00:00 |
21-02-2013 15:30:00 |
||
| Garh Shankar SDCA NIT579308.htm | APPLICATION9308.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Garh Shankar SDCA) (2nd Call) | 21-02-2013 15:00:00 |
21-02-2013 15:30:00 |
|||
| NIT No: 58/EE/BSNL/CD/JL/NIT/2012-13 dated 07.02.2013 | DASUYA SDCA NIT589310.htm | Tender Dasuya SDCA NIT589310.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Dasuya SDCA)(2nd Call) | 21-02-2013 15:00:00 |
21-02-2013 15:30:00 |
||
| DASUYA SDCA NIT589311.htm | APPLICATION9311.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Dasuya SDCA)(2nd Call) | 21-02-2013 15:00:00 |
21-02-2013 15:30:00 |
|||
| NIT No: 59/EE/BSNL/CD/JL/NIT/2012-13 dated 07.02.2013 | Tanda SDCA NIT 599312.htm | Tender Tanda SDCA NIT 599312.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations inTanda SDCA)”(2nd Call) | 21-02-2013 15:00:00 |
21-02-2013 15:30:00 |
||
| Tanda SDCA NIT 599313.htm | APPLICATION9313.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations inTanda SDCA)”(2nd Call) | 21-02-2013 15:00:00 |
21-02-2013 15:30:00 |
|||
| NIT No: 49 /EE/BSNL/CD/ASR/NIT/2012-13 dated 08.02.2013 | NIT 2ND call tower9315.htm | Tender Pathankot 2nd call tower9315.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH: Construction of 03 NosTower Foundations in Gurdaspur and Dinanagar SDCA) (2nd Call).” | 20-02-2013 15:00:00 |
20-02-2013 15:30:00 |
||
| NIT 2ND call tower9316.htm | Application Pathankot 2nd call9316.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH: Construction of 03 NosTower Foundations in Gurdaspur and Dinanagar SDCA) (2nd Call).” | 20-02-2013 15:00:00 |
20-02-2013 15:30:00 |
|||
| NIT No: 50/EE/BSNL/CD/ASR/NIT/2012-13 dated 08.02.2013 | NIT 2ND call tower9318.htm | Tender Pathankot 2nd call tower9318.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH: Construction of 03 Nos.Tower Foundations in Batala and Qadian SDCA) (2nd Call)”. | 20-02-2013 15:00:00 |
20-02-2013 15:30:00 |
||
| NIT 2ND call tower9319.htm | Application Pathankot 2nd call9319.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH: Construction of 03 Nos.Tower Foundations in Batala and Qadian SDCA) (2nd Call)”. | 20-02-2013 15:00:00 |
20-02-2013 15:30:00 |
|||
| NIT No: 51/EE/BSNL/CD/ASR/NIT/2012-13 dated 08.02.2013 | NIT 2ND call tower9320.htm | Tender Pathankot 2nd call tower9320.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH:Construction of 04 Nos. tower foundations in Pathankot and Jugial SDCA) (2nd Call).” | 20-02-2013 15:00:00 |
20-02-2013 15:30:00 |
||
| NIT 2ND call tower9321.htm | Application Pathankot 2nd call9321.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH:Construction of 04 Nos. tower foundations in Pathankot and Jugial SDCA) (2nd Call).” | 20-02-2013 15:00:00 |
20-02-2013 15:30:00 |
|||
| 66/2012-13/EE/BSNL/CD/LDH Dated 12.02.2013 | BSNL W-6 NIT 669328.htm | NIT 66-12139328.doc | A/R and M/O to BSNL buildings in Ludhiana SSA for the year 2012-13 (SH: Miscellaneous repair and painting to Sanchar Colony Khanna) | 20-02-2013 15:00:00 |
20-02-2013 15:30:00 |
||
| 23/EE/BSNL/CD-II/CHD/2012-13 dated 12.2.2013 | W69330.htm | 23nit12-139330.pdf | Provision of Chain Link and Barbed wire fencing at BTS Site at Ajouli Morh Nangal | 20-02-2013 15:00:00 |
20-02-2013 15:30:00 |
||
| NIT No.44/EE/BSNL/CD/PTA/2012-2013 Dated: 04.02.2013. | bsnl w-69292.htm | tender document9292.pdf | ARMO TO 3 NOS. T-V STAFF QUARTERS, COMMUNITY CENTRE AND COMPOUND WALL IN P AND T COLONY 22 NO. PHATAK PATIALA. | 18-02-2013 15:00:00 |
18-02-2013 15:30:00 |
||
| 65/2012-13/EE/BSNL/CD/LDH Dated 07.02.2013 | BSNL W-6 NIT 659304.htm | NIT 65-12139304.doc | A/R and M/O to BSNL Staff Quarters TE Buildings Sanitary Post Compound Wall at Sudhar Baddowal Humbran and Bassian for the year 2013-14 | 18-02-2013 15:00:00 |
18-02-2013 15:30:00 |
||
| 64/2012-13/EE/BSNL/CD/LDH Dated 06.02.2013 | BSNL W-6 NIT 649303.htm | NIT 64-12139303.doc | Maintenance Works in Sanchar Colony and Staff Quarters | 15-02-2013 15:00:00 |
15-02-2013 15:30:00 |
||
| 22/EE/BSNL/CD-II/CHD/2012-13 Dated: 08.02.2013 | w69324.htm | 22nit12-139324.pdf | Miscellaneous civil works at new Telephone Exchange Gillco hights Kharar. | 15-02-2013 15:00:00 |
15-02-2013 15:30:00 |
||
| NIT No-31/2012-13/EE/BSNL/CD-I/CHD dated 24-1-2013 | corrigendum nit 319300.htm | HIRING OF VEHICLE FOR O/O EXECUTIVE ENGINEER(C), BSNL CIVIL DIVISION-I, CHANDIGARH. | 13-02-2013 15:30:00 |
||||
| NIT No. 53/EE/BSNL/CD/JL/NIT/2012-13 Dated:- 29.01.2013 | BSNLW6 NIT539268.htm | Tender KAPURTHALA SDCA9268.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA (SH: Construction of 03 Nos. Tower Foundations in Kapurthala SDCA)” (2nd.Call) | 11-02-2013 15:00:00 |
11-02-2013 15:30:00 |
||
| NIT No. 53/EE/BSNL/CD/JL/NIT/2012-13 Dated:- 29.01.2013 | BSNLW6 NIT539269.htm | APPLICATION9269.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA (SH: Construction of 03 Nos. Tower Foundations in Kapurthala SDCA)” (2nd.Call) | 11-02-2013 15:00:00 |
11-02-2013 15:30:00 |
||
| NIT No: 54/EE/BSNL/CD/JL/NIT/2012-13 Dated:- 29.01.2013 | BSNL W69270.htm | Tender NAKODAR SDCA9270.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA (SH: - Construction of 03 Nos. Tower Foundations in Nakodar SDCA) (2nd Call) | 11-02-2013 15:00:00 |
11-02-2013 15:30:00 |
||
| BSNL W69271.htm | APPLICATION9271.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA (SH: - Construction of 03 Nos. Tower Foundations in Nakodar SDCA) (2nd Call) | 11-02-2013 15:00:00 |
11-02-2013 15:30:00 |
|||
| NIT No: 55/EE/BSNL/CD/JL/NIT/2012-13 Dated:- 29.01.2013 | BSN W6 NIT559272.htm | Tender NWS PGW SDCA9272.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA (SH: - Construction of 04 Nos. Tower Foundations in Nawan Shahar and Phagwara SDCA)(2nd Call) | 11-02-2013 15:00:00 |
11-02-2013 15:30:00 |
||
| NIT No: 55/EE/BSNL/CD/JL/NIT/2012-13 Dated:- 29.01.2013 | BSN W6 NIT559273.htm | APPLICATION- NIT559273.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA (SH: - Construction of 04 Nos. Tower Foundations in Nawan Shahar and Phagwara SDCA)(2nd Call) | 11-02-2013 15:00:00 |
11-02-2013 15:30:00 |
||
| NIT no 48/EE/BSNL/CD/ASR/2012-13 Dt. 02.02.2013 | NIT489284.htm | Tender489284.doc | Replacement of Flexes installed on BSNL Buildings in Pathankot SSA. | 11-02-2013 15:00:00 |
11-02-2013 15:30:00 |
||
| NIT489285.htm | APPLICATION9285.doc | Replacement of Flexes installed on BSNL Buildings in Pathankot SSA. | 11-02-2013 15:00:00 |
11-02-2013 15:30:00 |
|||
| NIT NO: 48/EE/BSNL/CD/ASR/2012-13 Dt. 02.02.2013 | NIT489286.htm | Tender489286.doc | Replacement of Flexes installed on BSNL Buildings in Pathankot SSA. | 11-02-2013 15:00:00 |
11-02-2013 15:30:00 |
||
| NIT No: 42/EE/BSNL/CD/PTA/2012-13 Dated:19.01.2013 | bsnl w-69235.htm | Tender Document9235.pdf | Construction of Foundation and Erection of 5 Nos. 40 metre NBLW towers in Patiala SSA. (SH: Foundation work) | 08-02-2013 15:00:00 |
08-02-2013 15:30:00 |
||
| NIT No:43/EE/BSNL/CD/PTA/2012-13 Dated:19-01-2013 | bsnl w-69236.htm | Tender Document9236.pdf | Construction of Foundation and erection of 10 Nos. 40 metre NBLW towers in Sangrur SSA.(SH: Five Nos. Foundation Work) (Phase-I) | 08-02-2013 15:00:00 |
08-02-2013 15:30:00 |
||
| 21/EE/BSNL/CD-II/CHD/2012-13 Dated: 1.2.2013 | W69281.htm | 21nit12-139281.pdf | Miscellaneous civil works at new Telephone Exchange Gillco hights Kharar. | 08-02-2013 15:00:00 |
08-02-2013 15:30:00 |
||
| 20/EE/BSNL/CD-II/CHD/CSD-MHL/2012-13 dated: 28.01.2013 | w69263.htm | NIT 20 MHL 2012-139263.pdf | Day to day maintenance of BSNL buildings in Mohali and Kharar upto 30.9.2013 | 07-02-2013 15:00:00 |
07-02-2013 15:30:00 |
||
| NIT No-31/2012-13/EE/BSNL/CD-I/CHD dated 24-1-2013 | 31NIT12 9260.htm | 31NIT129260.pdf | HIRING OF VEHICLE FOR O/O EXECUTIVE ENGINEER(C), BSNL CIVIL DIVISION-I, CHANDIGARH. | 06-02-2013 15:00:00 |
06-02-2013 15:30:00 |
||
| 46/EE/BSNL/CD/ASR/2012-13 dated 29.01.2013. | NIT 469264.htm | Tender document9264.doc | A/R and M/O to BSNL Staff Quarters in Amritsar SSA for the year 2012 2013. (SH Miscellaneous repair and painting to old staff quarters in P and T Colony Goal Bagh, Amritsar). | 06-02-2013 15:00:00 |
06-02-2013 15:30:00 |
||
| NIT 469265.htm | Application9265.doc | A/R and M/O to BSNL Staff Quarters in Amritsar SSA for the year 2012-2013. (SH Miscellaneous repair and painting to old staff quarters in P and T Colony Goal Bagh Amritsar). | 06-02-2013 15:00:00 |
06-02-2013 15:30:00 |
|||
| 47/EE/BSNL/CD/ASR/2012-13 dated 29.01.2013. | NIT9266.htm | Tender document9266.doc | A/R and M/O to BSNL Buildings in Amritsar SSA for the year 2012-2013. (SH Miscellaneous repair and painting to T.E. Building,TRA and Compound wall at Katra Sher Singh, Amritsar). | 06-02-2013 15:00:00 |
06-02-2013 15:30:00 |
||
| NIT9267.htm | Application9267.doc | A/R and M/O to BSNL Buildings in Amritsar SSA for the year 2012-2013. (SH Miscellaneous repair and painting to T.E. Building,TRA and Compound wall at Katra Sher Singh, Amritsar). | 06-02-2013 15:00:00 |
06-02-2013 15:30:00 |
|||
| 46/EE/BSNL/CD/ASR/2012-13 dated 29.01.2013. | NIT 469279.htm | Corrigendum9279.pdf | A/R and M/O to BSNL Staff Quarters in Amritsar SSA for the year 2012-2013. (SH Miscellaneous repair and painting to old staff quarters in P and T Colony, Goal Bagh, Amritsar). | 06-02-2013 15:00:00 |
06-02-2013 15:30:00 |
||
| NIT NO : 46/EE/BSNL/CD/ASR/2012-13 dated 29.01.2013. | NIT 469299.htm | Application9299.pdf | A/R M/O to BSNL Staff Quarters in Amritsar SSA for the year 2012 2013. (SH Miscellaneous repair and painting to old staff quarters in P T Colony, Goal Bagh, Amritsar). | 06-02-2013 15:00:00 |
06-02-2013 15:30:00 |
||
| NIT NO: 44/EE/BSNL/CD/ASR/2012-13 Dt. 21-01-2013 | NIT449238.htm | Tender449238.doc | “A.R. and M.O. to BSNL Buildings in Pathankot SSA for the year 2012-13 ( SH:- Miscellaneous repair and painting works to E-10B Building T.E. compound Pathankot). | 31-01-2013 15:00:00 |
31-01-2013 15:30:00 |
||
| 44/EE/BSNL/CD/ASR/2012-13 Dt. 21-01-2013 | NIT449239.htm | APPLICATION9239.doc | “A.R. and M.O. to BSNL Buildings in Pathankot SSA for the year 2012-13 ( SH:- Miscellaneous repair and painting works to E-10B Building T.E. compound Pathankot). | 31-01-2013 15:00:00 |
31-01-2013 15:30:00 |
||
| NIT NO: 45/EE/BSNL/CD/ASR/2012-13 Dt. 21-01-2013 | NIT459240.htm | Tender459240.doc | “Dismantling Damaged Grit Plaster including Re-plastering the same of E-10-B Building at Pathankot.(2nd Call ) | 31-01-2013 15:00:00 |
31-01-2013 15:30:00 |
||
| NIT459241.htm | APPLICATION9241.doc | “Dismantling Damaged Grit Plaster including Re-plastering the same of E-10-B Building at Pathankot.(2nd Call ) | 31-01-2013 15:00:00 |
31-01-2013 15:30:00 |
|||
| 62/2012-13/EE/BSNL/CD/LDH/ Dated 21.01.2013 | BSNL W-6 NIT 629242.htm | NIT 62-12139242.doc | Replacement of water supply pipe line to avoid leakage in BSNL TE Compound at Khanna, Machhiwara and Kohara | 30-01-2013 15:00:00 |
30-01-2013 15:30:00 |
||
| 63/2012-13/EE/BSNL/CD/LDH/ Dated 21.01.2013 | BSNL W-6 NIT 639243.htm | NIT 63-12139243.doc | A/R and M/O to BSNL building in Ferozepur SSA for the year 2012-13 SH: Maintenance and operational jobs in the O/o SDE (Civil) BSNL Civil Sub Division-I and II Ferozepur | 30-01-2013 15:00:00 |
30-01-2013 15:30:00 |
||
| NIQ No. 02/2012-13/EE/BSNL/CD/LDH Dated : 24.01.2012 | Notice Inviting Quotation9258.htm | Schedule of Quantity9258.doc | Providing and laying PVC pipes across under pass, adjoining Sidhwan Canal (towards Verka Plant) at Ferozepur Road, Ludhiana | 28-01-2013 15:00:00 |
28-01-2013 15:30:00 |
||
| NIT No.41/EE/BSNL/CD/PTA/2012-2013 Dated: 10.01.2013. | bsnl w-69212.htm | Tender Document9212.pdf | PROVISION OF M.S. SHEET ON HOARDING STRUCTURE ON ROOF TOP OF T.E. BUILDING LEELA BHAWAN, PATIALA. | 21-01-2013 15:00:00 |
21-01-2013 15:30:00 |
||
| 52/EE/BSNL/CD/JL/NIT/2012-13 Dt. 14-01-2013 | NIT 529225.htm | tender 529225.doc | Provision of cash counter and aluminium partition in MDF room of T E building for setting of CSC at Goraya. | 21-01-2013 15:00:00 |
21-01-2013 15:30:00 |
||
| NIT 529226.htm | APPLICATION 529226.doc | Provision of cash counter and aluminium partition in MDF room of T E building for setting of CSC at Goraya. | 21-01-2013 15:00:00 |
21-01-2013 15:30:00 |
|||
| Corriendum to NIT No.41/EE/BSNL/CD/PTA/2012-2013 Dated: 10.01.2013 | corriendum to NIT 419230.htm | Corriendum to NIT 419230.pdf | CORRIENDUM FOR WORK OF PROVISION OF M.S. SHEET ON HOARDING STRUCTURE ON ROOF TOP OF T.E.BUILDING LEELA BHAWAN, PATIALA | 21-01-2013 15:00:00 |
21-01-2013 15:30:00 |
||
| NIT NO : 41/EE/BSNL/CD/ASR/2012-13 dated 10.01.2013 | nit 419204.htm | Tender NIT 419204.doc | A/R and M/O to BSNL Buildings in Pathankot SSA for year 2012-13. ( SH Miscellaneous repair and painting works to RLU Complex at Quadian.) 2nd call. | 19-01-2013 15:00:00 |
19-01-2013 15:30:00 |
||
| nit 419206.htm | APPLICATIO nit 419206.pdf | A/R and M/O to BSNL Buildings in Pathankot SSA for year 2012-13. ( SH: Miscellaneous repair and painting works to RLU Complex at Quadian.) 2nd call. | 19-01-2013 15:00:00 |
19-01-2013 15:30:00 |
|||
| NIT NO : 42/EE/BSNL/CD/ASR/2012-13 dated 10.01.2013. | NIT9213.htm | Tender document9213.pdf | Raising of manhole necks of cable duct hambers at Taran Taran.( Distt. Taran Taran) | 19-01-2013 15:00:00 |
19-01-2013 15:30:00 |
||
| B S N L W 69215.htm | Application nit429215.pdf | Raising of manhole necks of cable duct hambers at Taran Taran.( Distt. Taran Taran) | 19-01-2013 15:00:00 |
19-01-2013 15:30:00 |
|||
| NIT NO : 43/EE/BSNL/CD/ASR/2012-13 dated 11.01.2013. | B S N L W 69218.htm | T E N D E R D O C U M E N T9218.pdf | Provision of Vitrified Floor Tiles in the Chamber of DGM in old T.E. Building Pathankot. | 19-01-2013 15:00:00 |
19-01-2013 19:30:00 |
||
| B S N L W 69220.htm | Tender document9220.pdf | Provision of Vitrified Floor Tiles in the Chamber of DGM in old T.E. Building Pathankot. | 19-01-2013 15:00:00 |
19-01-2013 15:30:00 |
|||
| B S N L W 69221.htm | Application nit 439221.pdf | Provision of Vitrified Floor Tiles in the Chamber of DGM in old T.E. Building Pathankot. | 19-01-2013 15:00:00 |
19-01-2013 15:30:00 |
|||
| NIT No.40/EE/BSNL/CD/PTA/2012-2013 Dated: 05.01.2013. | bsnl w-69186.htm | Tender document9186.pdf | ARMO TO STAFF QUARTERS IN P AND T COLONY 22 NO. PHATAK PATIALA. | 17-01-2013 15:00:00 |
17-01-2013 15:30:00 |
||
| NIT No: 39/EE/BSNL/CD/ASR/2012-13 Dated 07.01.2013 | BSNL W nit399189.htm | tender NIT 39 ALBERT9189.doc | A/R and M/O to BSNL Buildings in Amritsar SSA for the year 2012-13 (SH Miscellaneous repairs and painting to T.E. building at Albert Road Amritsar). | 17-01-2013 15:00:00 |
17-01-2013 15:30:00 |
||
| BSNL W nit399190.htm | A P P L I C A T I O N9190.pdf | A/R and M/O to BSNL Buildings in Amritsar SSA for the year 2012-13 (SH Miscellaneous repairs and painting to T.E. building at Albert Road, Amritsar). | 17-01-2013 15:00:00 |
17-01-2013 15:30:00 |
|||
| NIT No: 40/EE/BSNL/CD/ASR/2012-13 Dated 07.01.2013 | BSNL W nit 409191.htm | tender NIT40 Ranjit9191.doc | A/R and M/O to BSNL Buildings in Amritsar SSA for the year 2012-13 (SH Miscellaneous repairs and painting to T.E. building at Ranjit Avenue, Amritsar) | 17-01-2013 15:00:00 |
17-01-2013 15:30:00 |
||
| BSNL W nit 409192.htm | A P P L I C A T I O N nit 409192.pdf | A/R and M/O to BSNL Buildings in Amritsar SSA for the year 2012-13 (SH Miscellaneous repairs and painting to T.E. building at Ranjit Avenue, Amritsar) | 17-01-2013 15:00:00 |
17-01-2013 15:30:00 |
|||
| 50/EE/BSNL/CD/JL/NIT/2012-13 Dt. 08-01-2013 | NIT 509194.htm | Tender509194.doc | A/R and M/O to BSNL Buildings in Hoshiarpur SSA for the Year 2012-13 ( SH: Miscellaneous repairs and painting to BSNL staff quarters due to change of occupancy). | 17-01-2013 15:00:00 |
17-01-2013 15:30:00 |
||
| NIT 509196.htm | Application 509196.doc | A/R and M/O to BSNL Buildings in Hoshiarpur SSA for the Year 2012-13 ( SH: Miscellaneous repairs and painting to BSNL staff quarters due to change of occupancy). | 17-01-2013 15:00:00 |
17-01-2013 15:30:00 |
|||
| 51/EE/BSNL/CD/JL/NIT/2012-13 Dt. 08-01-2013 | NIT 519197.htm | TENDER 519197.doc | A/R and M/O to BSNL Buildings in Hoshiarpur SSA for the Year 2012-13 ( SH: Miscellaneous civil works in BSNL Type-II staff quarters opposite DAV college Hoshiarpur). | 17-01-2013 15:00:00 |
17-01-2013 15:30:00 |
||
| NIT 519198.htm | APPLICATION 519198.doc | A/R and M/O to BSNL Buildings in Hoshiarpur SSA for the Year 2012-13 ( SH: Miscellaneous civil works in BSNL Type-II staff quarters opposite DAV college Hoshiarpur). | 17-01-2013 15:00:00 |
17-01-2013 15:30:00 |
|||
| NIT No: 30/2012-13/EE/BSNL/CD-I/CHD Dated 3-1-2013. | 30NIT129182.htm | 30NIT129182.pdf | Hiring of 1 No. of Non Air Conditioned Tata Indica Cars for 1700 Kms. Per month. | 11-01-2013 15:00:00 |
11-01-2013 15:30:00 |
||
| NIT NO: 49/EE/BSNL/CD/JL/NIT/2012-13 Dt. 19-12-2012 | NIT 499150.htm | Tender document NIT499150.doc | “Repair to damaged Cable duct between GPO and PNB Chowk Jalandhar. | 04-01-2013 15:00:00 |
04-01-2013 15:30:00 |
||
| NIT 499151.htm | APPLICATION nit 499151.doc | “Repair to damaged Cable duct between GPO and PNB Chowk Jalandhar. | 04-01-2013 15:00:00 |
04-01-2013 15:30:00 |
|||
| 58/2012-13/EE/BSNL/CD/LDH Dated 26.12.2012 | BSNL W-6 NIT 589158.htm | NIT 58-12139158.doc | Miscellaneous Civil Works in Tax Building Bathinda (RE-Call) | 04-01-2013 15:00:00 |
04-01-2013 15:30:00 |
||
| 59/2012-13/EE/BSNL/CD/LDH Dated 26.12.2012 | BSNL W-6 NIT 599159.htm | NIT 59-12139159.doc | A/R and M/O to BSNL Buildings in Ferozepur SSA for the year 2012-13 SH: Day to day maintenance of Staff Quarters under BSNL Civil Sub Division-II Ferozepur (RE-CALL) | 04-01-2013 15:00:00 |
04-01-2013 15:30:00 |
||
| 60/2012-13/EE/BSNL/CD/LDH Dated 26.12.2012 | BSNL W-6 NIT 609160.htm | NIT 60-12139160.doc | A/R and M/O to BSNL Buildings in Ferozepur SSA for the year 2012-13 (SH: Day to day maintenance for BSNL Buildings under the Jurisdiction of BSNL Civil Sub Division Moga) (RE-CALL) | 04-01-2013 15:00:00 |
04-01-2013 15:30:00 |
||
| 61/2012-13/EE/BSNL/CD/LDH Dated 26.12.2012 | BSNL W-6 NIT 619161.htm | NIT 61-12139161.doc | A/R and M/O to BSNL Staff Quarters in Ferozepur for the year 2012-13 (SH: Painting to Re-allotted Staff Qtrs. under CSD-II Ferozepur) (RE-Call) | 04-01-2013 15:00:00 |
04-01-2013 15:30:00 |
||
| 48 /EE/BSNL/CD/JL/NIT/2012-13 Dated:- 19.12.2012 | BSNL W69144.htm | APPLICATION TOWERMTC HSP9144.doc | Annual Maintenance of Ground Based and Roof Top Towers in Hoshiarpur SSA under the jurisdiction of BSNL Civil Sub Division, Hoshiarpur during the year 2011-12. | 03-01-2013 15:00:00 |
03-01-2013 15:30:00 |
||
| 46 /EE/BSNL/CD/JL/NIT/2012-13 Dated:- 19.12.2012 | BSNLW6 469128.htm | NIT ARMO CTO, JL9128.doc | A/R M/O to BSNL Buildings in Jalandhar SSA for the year 2012-13 (SH: Miscellaneous repairs painting to CTO Building at Jalandhar) | 03-01-2013 15:00:00 |
03-01-2013 15:30:00 |
||
| BSNLW6 469129.htm | APPLICATION CTO9129.doc | A/R M/O to BSNL Buildings in Jalandhar SSA for the year 2012-13 (SH: Miscellaneous repairs and painting to CTO Building at Jalandhar) | 03-01-2013 15:00:00 |
03-01-2013 15:30:00 |
|||
| 47 /EE/BSNL/CD/JL/NIT/2012-13 Dated:- 19.12.2012 | BSNLw6 479131.htm | NIT ARMO MTS, JL9131.doc | A/R M/O to BSNL Buildings in Jalandhar SSA for the year 2012-13 (SH: Miscellaneous repairs and painting to Microwave Building and Telephone Exchange Building in MTS Nagar Compound at Jalandhar) | 03-01-2013 15:00:00 |
03-01-2013 15:30:00 |
||
| BSNLw6 479133.htm | NIT ARMO MTS, JL9133.doc | A/R M/O to BSNL Buildings in Jalandhar SSA for the year 2012-13 (SH: Miscellaneous repairs and painting to Microwave Building and Telephone Exchange Building in MTS Nagar Compound at Jalandhar) | 03-01-2013 15:00:00 |
03-01-2013 15:30:00 |
|||
| 47 /EE/BSNL/CD/JL/NIT/2012-13 Dated:- 19.12.2012 | BSNLw6 479136.htm | APPLICATION MTS9136.doc | A/R M/O to BSNL Buildings in Jalandhar SSA for the year 2012-13 (SH: Miscellaneous repairs and painting to Microwave Building and Telephone Exchange Building in MTS Nagar Compound at Jalandhar) | 03-01-2013 15:00:00 |
03-01-2013 15:30:00 |
||
| 48 /EE/BSNL/CD/JL/NIT/2012-13 Dated:- 19.12.2012 | BSNL W69138.htm | NIT tower mtc hsp9138.doc | Annual Maintenance of Ground Based and Roof Top Towers in Hoshiarpur SSA under the jurisdiction of BSNL Civil Sub Division, Hoshiarpur during the year 2011-12 | 03-01-2013 15:00:00 |
03-01-2013 15:30:00 |
||
| NIT No. 38/EE/BSNL/CD/ASR/2012-13 Dated:- 18.12.2012 | BSNL W9117.htm | A P P L I C A T I O N9117.pdf | Construction of Foundation and Erection of 2 Nos. 40Meter NBLW Towers in Amritsar SSA. (SH: - Foundation) 2nd call.” | 31-12-2012 15:00:00 |
31-12-2012 15:30:00 |
||
| BSNL W9127.htm | A P P L I C A T I O N9127.pdf | Construction of Foundation and Erection of 2 Nos. 40Meter NBLW Towers in Amritsar SSA. (SH: - Foundation) 2nd call.” | 31-12-2012 15:00:00 |
31-12-2012 15:30:00 |
|||
| NIT No: 38/EE/BSNL/CD/ASR/2012-13 Dated:- 18.12.2012 | NIT 389149.htm | nit 389149.doc | “Construction of Foundation and Erection of 2 Nos. 40Meter NBLW Towers in Amritsar SSA. (SH: - Foundation) 2nd call.” | 31-12-2012 15:00:00 |
31-12-2012 15:30:00 |
||
| 37/EE/BSNL/CD/ASR/2012-13 dated 17.12.2012. | NIT 379104.htm | Tender document nit 379104.pdf | “Cleaning of Water storage tanks during the year 2012-13 (Ph-II) for area under BSNL Civil Sub-Division, Amritsar. | 29-12-2012 15:00:00 |
29-12-2012 15:30:00 |
||
| : 37/EE/BSNL/CD/ASR/2012-13 dated 17.12.2012. | NIT 379105.htm | Application nit379105.pdf | “Cleaning of Water storage tanks during the year 2012-13 (Ph-II) for area under BSNL Civil Sub-Division, Amritsar. | 29-12-2012 15:00:00 |
29-12-2012 15:30:00 |
||
| NIT No 39/EE/BSNL/CD/PTA/2012-2013 Dated: 19.12.2012. | bsnl-69135.htm | tender document9135.pdf | Supply of Printer,Copier,Scanner,Fax (4 in 1) for use in the office of E.E.(C), BSNL Civil Division Patiala. | 29-12-2012 15:00:00 |
29-12-2012 15:30:00 |
||
| Notice Inviting Quotation | Quotation-vehicle9163.htm | Quotation-vehicle9163.pdf | Hiring of 1 No. of Non Air Conditioned Tata Indica Cars for 1600 Kms. Per month for the O/o Executive Engineer(C), BSNL Civil Division-I, Chandigarh | 29-12-2012 15:00:00 |
29-12-2012 15:30:00 |
||
| 35/EE/BSNL/CD/ASR/2012-13 dated 17.12.2012. | NIT 359100.htm | Tender document NIT 359100.pdf | Day to day Maintenance of BSNL staff quarters in the area under BSNL Civil Sub-Division,Amritsar during the year 2012-2013 (Phase-II). | 28-12-2012 15:00:00 |
28-12-2012 15:30:00 |
||
| NIT 359101.htm | Application 359101.pdf | “Day to day Maintenance of BSNL staff quarters in the area under BSNL Civil Sub-Division,Amritsar during the year 2012-2013 (Phase-II). | 28-12-2012 15:00:00 |
28-12-2012 15:30:00 |
|||
| 36/EE/BSNL/CD/ASR/2012-13 dated 17.12.2012. | NIT 369102.htm | Tender document 369102.pdf | Day to day Maintenance of BSNL Buildings in the area under BSNL Civil Sub-Division,Amritsar during the year 2012-2013(Phase-II). | 28-12-2012 15:00:00 |
28-12-2012 15:30:00 |
||
| : 36/EE/BSNL/CD/ASR/2012-13 dated 17.12.2012. | NIT 369103.htm | Application9103.pdf | Day to day Maintenance of BSNL Buildings in the area under BSNL Civil Sub-Division,Amritsar during the year 2012-2013(Phase-II). | 28-12-2012 15:00:00 |
28-12-2012 15:30:00 |
||
| 57/2012-13/EE/BSNL/CD/LDH Dated 20.12.2012 | BSNL W-6 NIT 579148.htm | NIT 57-12139148.doc | Repair of Damaged Water Supply Pipe line of Staff Quarters and lawns in BSNL Compound at Doraha | 27-12-2012 15:00:00 |
27-12-2012 15:30:00 |
||
| 19/EE/BSNL/CD-II/CHD/CSD-RPR/2012-13 dated 18.12.2012 | Ropar ARMO W 69112.htm | Ropar ARMO9112.pdf | A R and M O to Type VI staff quarter in Co axial compound at Ropar | 26-12-2012 15:00:00 |
26-12-2012 15:30:00 |
||
| 19/EE/BSNL/CD-II/CHD/CSD-RPR/2012-13 dated 18.12.2012 | Ropar cup board W 69113.htm | Ropar cup board9113.pdf | Replacement of damaged cup boards in the Type VI staff quarter in Co axial compound at Ropar | 26-12-2012 15:00:00 |
26-12-2012 15:30:00 |
||
| NIT No: 37/EE/BSNL/CD/PTA/2012-13 Dated:12.12.2012 | bsnl-69091.htm | Tender Document9091.pdf | Construction of Foundation and Erection of 5 Nos. 40 metre NBLW towers in Patiala SSA. (SH: Foundation work) | 24-12-2012 15:00:00 |
24-12-2012 15:30:00 |
||
| NIT No:38/EE/BSNL/CD/PTA/2012-13 Dated:12-12-2012 | bsnl-69092.htm | Tender Documents9092.pdf | Construction of Foundation and erection of 10 Nos. 40 metre NBLW towers in Sangrur SSA.(SH: Five Nos. Foundation Work) (Phase-I) | 24-12-2012 15:00:00 |
24-12-2012 15:30:00 |
||
| NIT No.35/EE/BSNL/CD/PTA/2012-2013 Dated: 11.12.2012. | bsnl-69085.htm | Tender Document9085.pdf | Provision of Partition wall between Tower portion and TE compound and Provision of Barbed wire fencing on wall between staff quarter and Tower portion in TE compound at Dera Bassi. | 22-12-2012 15:00:00 |
22-12-2012 15:30:00 |
||
| 18/EE/BSNL/CD-II/CHD/2012-13 dated 11-12-2012 | W69087.htm | 18 nit9087.pdf | Construction of Foundation and Erection of 5 Nos 40 metre NBLW towers in Ropar SSA SH Foundation work IInd Call | 22-12-2012 15:00:00 |
22-12-2012 15:30:00 |
||
| NIT No.36/EE/BSNL/CD/PTA/2012-2013 Dated: 11.12.2012. | bsnl-69090.htm | Tender Document9090.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS (LOCAL AND PATIALA GROUP) IN PATIALA SSA FORM JANUARY 2013 TO MARCH 2013. | 22-12-2012 15:00:00 |
22-12-2012 15:30:00 |
||
| 55/2012-13/EE/BSNL/CD/LDH Dated 07.12.2012 | BSNL W-6 NIT 559077.htm | NIT 55-12139077.doc | A/R and M/O to BSNL Buildings in Ferozepur SSA for the year 2012-13 SH: Day to day maintenance of Staff Quarters under BSNL Civil Sub Division-II Ferozepur | 17-12-2012 15:00:00 |
17-12-2012 15:30:00 |
||
| 56/2012-13/EE/BSNL/CD/LDH Dated 07.12.2012 | BSNL W-6 NIT 569078.htm | NIT 56-12139078.doc | A/R and M/O to BSNL Buildings in Ferozepur SSA for the year 2012-13 SH: Day to day maintenance for BSNL Buildings under the Jurisdiction of BSNL Civil Sub Division Moga | 17-12-2012 15:00:00 |
17-12-2012 15:30:00 |
||
| 34/EE/BSNL/CD/ASR/2012-13 dated 07.12.2012. | NIT9072.htm | Tender document9072.pdf | Civil works in dismantled A/C Plant Room for converting it into Record Room at ground floor of E-10B Building Pathankot. | 15-12-2012 15:00:00 |
15-12-2012 15:30:00 |
||
| NIT no 34/EE/BSNL/CD/ASR/2012-13 dated 07.12.2012. | NIT9073.htm | Application9073.pdf | Civil works in dismantled A/C Plant Room for converting it into Record Room at ground floor of E-10B Building Pathankot. | 15-12-2012 15:00:00 |
15-12-2012 15:30:00 |
||
| NIT NO : 32/EE/BSNL/CD/ASR/2012-13 dated 30.11.2012 | BSNLW6 NIT 329051.htm | Tender NIT 329051.doc | “A/R M/O to BSNL Buildings in Pathankot SSA for year 2012-13.( SH: Miscellaneous repair and painting works to RLU Complex at Quadian.) | 11-12-2012 15:00:00 |
11-12-2012 15:30:00 |
||
| BSNLW6 NIT 329052.htm | APPLICATIOnit 329052.doc | A/R M/O to BSNL Buildings in Pathankot SSA for year 2012-13.( SH: Miscellaneous repair and painting works to RLU Complex at Quadian.) | 11-12-2012 15:00:00 |
11-12-2012 15:30:00 |
|||
| NO : 33/EE/BSNL/CD/ASR/2012-13 dated 30.11.2012. | BSNL W6 NIT 339053.htm | Tender NIT339053.doc | Sealing of Manholes of Cable Duct Chambers in Area under DET Bhagtanwala at Amritsar. (2nd Call) | 11-12-2012 15:00:00 |
11-12-2012 15:30:00 |
||
| Sealing of Manholes of Cable Duct Chambers in Area under DET Bhagtanwala at Amritsar. (2nd Call) | BSNL W6 NIT 339054.htm | APPLICATION NIT 339054.doc | Sealing of Manholes of Cable Duct Chambers in Area under DET Bhagtanwala at Amritsar. (2nd Call) | 11-12-2012 15:00:00 |
11-12-2012 15:30:00 |
||
| NIT NO. 29/2012-13/EE/BSNL/CD-I/CHD Dat | 29NIT129059.htm | 29NIT129059.pdf | Special repair to Telephone Bhawan, Sector-17, Chandigarh (SH: Refixing of peeled off sunmica of partitions at 3rd floor).. | 11-12-2012 15:00:00 |
11-12-2012 15:30:00 |
||
| 41/EE/BSNL/CD/JL/NIT/2012-13 dated 24.11.2012 | BSNL69016.htm | Tender Dasuya SDCA9016.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Dasuya SDCA)” | 10-12-2012 15:00:00 |
10-12-2012 15:30:00 |
||
| BSNL69017.htm | APPLICATION9017.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Dasuya SDCA)” | 10-12-2012 15:00:00 |
10-12-2012 15:30:00 |
|||
| 42/EE/BSNL/CD/JL/NIT/2012-13 dated 24.11.2012 | BSNL69019.htm | Tender Tanda SDCA NIT429019.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations inTanda SDCA)” | 10-12-2012 15:00:00 |
10-12-2012 15:30:00 |
||
| BSNL69020.htm | APPLICATION9020.doc | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations inTanda SDCA)” | 10-12-2012 15:00:00 |
10-12-2012 15:30:00 |
|||
| 43/EE/BSNL/CD/JL/NIT/2012-13 dated 24.11.2012 | BSNL69023.htm | Tender KAPURTHALA SDCA9023.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA(SH: - Construction of 03 Nos. Tower Foundations in Kapurthala SDCA)” | 10-12-2012 15:00:00 |
10-12-2012 15:30:00 |
||
| BSNL69025.htm | APPLICATION9025.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA(SH: - Construction of 03 Nos. Tower Foundations in Kapurthala SDCA)” | 10-12-2012 15:00:00 |
10-12-2012 15:30:00 |
|||
| 41/EE/BSNL/CD/JL/NIT/2012-13 dated 24.11.2012 | Corrigendum9045.htm | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations in Dasuya SDCA)” | 10-12-2012 15:30:00 |
||||
| 42/EE/BSNL/CD/JL/NIT/2012-13 dated 24.11.2012 | Corrigendum9046.htm | “Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos. Tower Foundations inTanda SDCA)” | 10-12-2012 15:30:00 |
||||
| NIT NO. 27/2012-13/EE/BSNL/CD-I/CHD Dated: - 1-12-2012 | 27NIT129055.htm | 27NIT129055.pdf | Post construction anti termite treatment to the quarters falling under BSNL Civil Sub Division-I, Chandigarh up to 31-12-2013 (Term Contract) | 10-12-2012 15:00:00 |
10-12-2012 15:30:00 |
||
| NIT NO. 27/2012-13/EE/BSNL/CD-I/CHD Dat | 27NIT129056.htm | 27NIT12(i)9056.pdf | Post construction anti termite treatment to the quarters falling under BSNL Civil Sub Division-IV, Chandigarh up to 31-12-2013 (Term Contract) | 10-12-2012 15:00:00 |
10-12-2012 15:30:00 |
||
| NIT NO. 27/2012-13/EE/BSNL/CD-I/CHD Dated: - 1-12-2012 | 27NIT129057.htm | 27NIT12 (ii)9057.pdf | Post construction anti termite treatment to the quarters falling under BSNL Civil Sub Division-V, Chandigarh up to 31-12-2013 (Term Contract) | 10-12-2012 15:00:00 |
10-12-2012 15:30:00 |
||
| NIT NO. 28/2012-13/EE/BSNL/CD-I/CHD Dat | 28NIT129058.htm | 28NIT129058.pdf | Provision of lifts for 150 rooms boys hostel at NIPER, Sector-67, Mohali (SH: Civil work).. | 10-12-2012 15:00:00 |
10-12-2012 15:30:00 |
||
| 27/EE/BSNL/CD/ASR/2012-13 dated 24.11.2012 | BSNL W6 NIT279010.htm | Tender GSP and DNN SDCA NIT279010.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH: Construction of 03 Nos. Tower Foundation in Gurdaspur and Dinanagar SDCA ). | 07-12-2012 15:00:00 |
07-12-2012 15:30:00 |
||
| 27/EE/BSNL/CD/ASR/2012-13 Dated:- 24.11.2012 | BSNL W6 NIT279011.htm | APPLICATION9011.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH: Construction of 03 Nos. Tower Foundation in Gurdaspur and Dinanagar SDCA ). | 07-12-2012 15:00:00 |
07-12-2012 15:30:00 |
||
| 28/EE/BSNL/CD/ASR/2012-13 dated 24.11.2012 | BSNL W6 NIT289012.htm | TenderBTL and Qadian SDCA NIT289012.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH: Construction of 03 Nos. Tower Foundation in Batala and Qadian SDCA).” | 07-12-2012 15:00:00 |
07-12-2012 15:30:00 |
||
| BSNL W6 NIT289013.htm | APPLICATION9013.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH: Construction of 03 Nos. Tower Foundation in Batala and Qadian SDCA).” | 07-12-2012 15:00:00 |
07-12-2012 15:30:00 |
|||
| 29/EE/BSNL/CD/ASR/2012-13 dated 24.11.2012 | BSNL W6 NIT299014.htm | Tender PTK and JUGIAL SDCA NIT299014.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH: Construction of 04 Nos. Tower Foundation in Pathankot and Jugial SDCA).” | 07-12-2012 15:00:00 |
07-12-2012 15:30:00 |
||
| BSNL W6 NIT299015.htm | APPLICATION9015.doc | “Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Pathankot SSA. (SH: Construction of 04 Nos. Tower Foundation in Pathankot and Jugial SDCA).” | 07-12-2012 15:00:00 |
07-12-2012 15:30:00 |
|||
| NIT NO : 30/EE/BSNL/CD/ASR/2012-13 dated 30.11.2012. | BSNLW6 nit 309047.htm | Tender NIT 30 Batala9047.doc | “ARMO to BSNL Buildings in Pathankot SSA for year 2012-13. ( SH: Miscellaneous repair and painting works to BSNL Staff Quarters at Batala.) | 06-12-2012 15:00:00 |
06-12-2012 15:30:00 |
||
| BSNLW6 nit 309048.htm | APPLICATION nit 309048.doc | “ARMO to BSNL Buildings in Pathankot SSA for year 2012-13. ( SH: Miscellaneous repair and painting works to BSNL Staff Quarters at Batala.) | 06-12-2012 15:00:00 |
06-12-2012 15:30:00 |
|||
| NIT NO : 31/EE/BSNL/CD/ASR/2012-13 dated 30.11.2012. | BSNL W6 NIT 319049.htm | Tender NIT 319049.doc | “AR MO to BSNL Buildings in Pathankot SSA for year 2012-13.SH: Miscellaneous repair and painting works to BSNL Staff Quarters at Chakki Bank Pathankot.) | 06-12-2012 15:00:00 |
06-12-2012 15:30:00 |
||
| BSNL W6 NIT 319050.htm | APPLICATION nit 319050.doc | “A/R M/O to BSNL Buildings in Pathankot SSA for year 2012-13.SH: Miscellaneous repair and painting works to BSNL Staff Quarters at Chakki Bank Pathankot.) | 06-12-2012 15:00:00 |
06-12-2012 15:30:00 |
|||
| NIT NO: 44/EE/BSNL/CD/JL/NIT/2012-13 Dt. 27-11-2012 | BSNL W6 NIT449033.htm | TENDER9033.doc | “ARMO to BSNL Buildings in Hoshiarpur SSA for the Year 2012-13 (SH: Misscellaneous repairs and painting to New T E Bldg at Vakilan Bazar Hoshiarpur). | 05-12-2012 15:00:00 |
05-12-2012 15:30:00 |
||
| BSNL W6 NIT449034.htm | APPLICATION9034.doc | “ARMO to BSNL Buildings in Hoshiarpur SSA for the Year 2012-13 (SH: Misscellaneous repairs and painting to New T E Bldg at Vakilan Bazar Hoshiarpur). | 05-12-2012 15:00:00 |
05-12-2012 15:30:00 |
|||
| 51/2012-13/EE/BSNL/CD/LDH Dated 24.11.2012 | Corrigendum_NIT 519035.doc | Construction of 05 Nos. Tower Foundation in Bathinda Distt. | 05-12-2012 15:30:00 |
||||
| 52/2012-13/EE/BSNL/CD/LDH Dated 24.11.2012 | Corrigendum_NIT 529036.doc | Construction of 05 Nos. Tower Foundation in Mansa Distt. | 05-12-2012 15:30:00 |
||||
| 45/EE/BSNL/CD/JL/NIT/2012-13 Dt. 27-11-2012 | BSNL W6 Nit 459037.htm | TENDER9037.doc | ARMO to BSNL Buildings in Hoshiarpur SSA for the Year 2012-13 (SH: Misscellaneous repairs and painting to Telephone Bhawan Railway Mandi at Hoshiarpur) | 05-12-2012 15:00:00 |
05-12-2012 15:30:00 |
||
| 53/2012-13/EE/BSNL/CD/LDH Dated 24.11.2012 | Corrigendum_NIT 539038.doc | Misc. repair and painting of Tax Buildings, Staff Quarters, Compound walls and Ancillaries Structures at Budhlada,Bhagta Bhai Ka, Mansa, Bareta and Mour Mandi | 05-12-2012 15:30:00 |
||||
| 54/2012-13/EE/BSNL/CD/LDH Dated 24.11.2012 | Corrigendum_NIT 549039.doc | A/R and M/O to BSNL Staff Colony, Officer Colony and ancillary structure at Bhagu Road, Bathinda for the year 2012-13 | 05-12-2012 15:30:00 |
||||
| 45/EE/BSNL/CD/JL/NIT/2012-13 Dt. 27-11-2012 | BSNL W6 Nit 459040.htm | APPLICATION9040.doc | “ARMO to BSNL Buildings in Hoshiarpur SSA for the Year 2012-13 (SH: Misscellaneous repairs and painting to Telephone Bhawan Railway Mandi at Hoshiarpur) | 05-12-2012 15:00:00 |
05-12-2012 15:30:00 |
||
| NIT NO: 45/EE/BSNL/CD/JL/NIT/2012-13 Dt. 27-11-2012 | BSNL W6 Nit 459041.htm | APPLICATION9041.doc | ARMO to BSNL Buildings in Hoshiarpur SSA for the Year 2012-13 (SH: Misscellaneous repairs and painting to Telephone Bhawan Railway Mandi at Hoshiarpur) | 05-12-2012 15:00:00 |
05-12-2012 15:30:00 |
||
| NIT NO : 26 /EE/BSNL/CD/ASR/2012-13 dated 24-11-2012 | NIT OJ9007.htm | Tender document9007.pdf | A/R M/O to BSNL Buildings and Staff Quarters at SSA ( Maintenance of operational jobs) | 04-12-2012 15:00:00 |
04-12-2012 15:30:00 |
||
| NIT NO : 26/EE/BSNL/CD/ASR/2012-13 dated 24-11-2012 | NIT OJ9008.htm | Application9008.pdf | A/R M/O to BSNL Buildings and Staff Quarters at SSA Amritsar during year 2012-13(SH : Maintenance operational jobs in O/o the EE(C) SDE (C)-PH-III, Amritsar). | 04-12-2012 15:00:00 |
04-12-2012 15:30:00 |
||
| NIT No 17/EE/BSNL/CD/CHD-II/2012-13 dated 26 -11-2012 | W69030.htm | 17nit 12-139030.pdf | Supply of Printer Copier Scanner Fax ( 4 in-1) for use in the O/o S.E.(C) BSNL Civil Circle-II Chandigarh | 04-12-2012 15:00:00 |
04-12-2012 15:30:00 |
||
| 37/EE/BSNL/CD/JL/NIT/2012-13 dated 22.11.2012 | BSNL-W68994.htm | Tender Hoshiarpur SDCA8994.doc | Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA (SH: Construction of 04 Nos Tower Foundations in Hoshiarpur SDCA) | 03-12-2012 15:00:00 |
03-12-2012 15:30:00 |
||
| 37/EE/BSNL/CD/JL/NIT/2012-13 dated 22.11.2012 | BSNL-W68995.htm | APPLICATION8995.doc | Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos Tower Foundations in Hoshiarpur SDCA) | 03-12-2012 15:00:00 |
03-12-2012 15:30:00 |
||
| 38/EE/BSNL/CD/JL/NIT/2012-13 dated 22.11.2012 | BSNL W68996.htm | Tender Garh Shankar SDCA8996.doc | Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA. (SH: - Construction of 04 Nos Tower Foundations in Garh Shankar SDCA) | 03-12-2012 15:00:00 |
03-12-2012 15:30:00 |
||
| BSNL W68997.htm | APPLICATION8997.doc | Construction of Foundation and Erection of 16 Nos. 40 Meter NBLW Towers in Hoshiarpur SSA(SH: - Construction of 04 Nos Tower Foundations in Garh Shankar SDCA) | 03-12-2012 15:00:00 |
03-12-2012 15:30:00 |
|||
| 39/EE/BSNL/CD/JL/NIT/2012-13 dated 22.11.2012 | BSNL68998.htm | Tender NWS PGW SDCA8998.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA(SH: - Construction of 04 Nos. Tower Foundations in Nawan Shahar and Phagwara SDCA)” | 03-12-2012 15:00:00 |
03-12-2012 15:30:00 |
||
| BSNL68999.htm | APPLICATION8999.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA(SH: - Construction of 04 Nos. Tower Foundations in Nawan Shahar and Phagwara SDCA)” | 03-12-2012 15:00:00 |
03-12-2012 15:30:00 |
|||
| 40/EE/BSNL/CD/JL/NIT/2012-13 dated 22.11.2012 | BSNL W69000.htm | Tender NAKODAR SDCA9000.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA (SH: - Construction of 03 Nos. Tower Foundations in Nakodar SDCA) | 03-12-2012 15:00:00 |
03-12-2012 15:30:00 |
||
| BSNL W69001.htm | APPLICATION9001.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA (SH: - Construction of 03 Nos. Tower Foundations in Nakodar SDCA) | 03-12-2012 15:00:00 |
03-12-2012 15:30:00 |
|||
| NIT No: 16/EE/BSNL/CD-II/CHD/2012-13 Dated: 19-11-2012 | w68971.htm | mohali towers 5 Nos8971.pdf | Construction of Foundation and Erection of 5 Nos. 40 metre NBLW towers in Mohali area under Chandigarh SSA. SH Foundation work | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| NIT No: 16/EE/BSNL/CD-II/CHD/2012-13 Dated: 19-11-2012 | w68972.htm | ropar towers 5 Nos8972.pdf | Construction of Foundation and Erection of 5 Nos. 40 metre NBLW towers in Ropar, SSA. SH Foundation work | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| NIT No: 16/EE/BSNL/CD-II/CHD/2012-13 Dated: 19-11-2012 | w68973.htm | PANCHKULA towers 2 Nos8973.pdf | Construction of Foundation and Erection of 2 Nos. 40 metre NBLW towers in Panchkula area under Chandigarh SSA. SH Foundation work | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| 48/2012-13/EE/BSNL/CD/LDH Dated 22.11.2012 | BSNL W-6 NIT 488988.htm | NIT 48-12138988.doc | Day to day maintenance of Staff Quarters under BSNL Civil Sub Division-I, Ludhiana | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| 49/2012-13/EE/BSNL/CD/LDH Dated 22.11.2012 | BSNL W-6 NIT 498989.htm | NIT 49-12138989.doc | Day to day maintenance of Staff Quarters under BSNL Civil Sub Division-II, Ludhiana | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| 50/2012-13/EE/BSNL/CD/LDH Dated 22.11.2012 | BSNL W-6 NIT 508991.htm | NIT 50-12138991.doc | Miscellaneous Civil Works in Tax Building Bathinda | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| NIT NO. 24/2012-13/EE/BSNL/CD-I/CHD Dated: - 23-11-2012 | 24NIT129003.htm | 24NIT129003.pdf | A/R and M/O to BSNL Technical Buildings under the Jurisdiction of BSNL Civil Sub Division-I, Chandigarh | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| NIT NO. 25/2012-13/EE/BSNL/CD-I/CHD Dated: - 23-11-2012 | 25NIT129004.htm | 25NIT129004.pdf | A/R and M/O to BSNL Staff Quarters Type-III/36A, T-IV/36B and T-VI/39, Chandigarh falling under BSNL Civil Sub Division-V, Chandigarh during the year 2012-13 | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| NIT NO. 26/2012-13/EE/BSNL/CD-I/CHD Dated: - 23-11-2012 | 26NIT129005.htm | 26NIT129005.pdf | A/R and M/O to Technical and Admn. Building under the Jurisdiction of BSNL Civil Sub Division-IV, Chandigarh. | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| 51/2012-13/EE/BSNL/CD/LDH Dated 24.11.2012 | BSNL W-6 NIT 519018.htm | NIT 51-12139018.doc | Construction of 05 Nos. Tower Foundation in Bathinda Distt. | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| 52/2012-13/EE/BSNL/CD/LDH Dated 24.11.2012 | BSNL W-6 NIT 529021.htm | NIT 52-12139021.doc | Construction of 05 Nos. Tower Foundation in Mansa Distt. | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| 53/2012-13/EE/BSNL/CD/LDH Dated 24.11.2012 | BSNL W-6 NIT 539022.htm | NIT 53-12139022.doc | Misc. repair and painting of Tax Buildings, Staff Quarters, Compound walls and Ancillaries Structures at Budhlada,Bhagta Bhai Ka, Mansa, Bareta and Mour Mandi | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| 54/2012-13/EE/BSNL/CD/LDH Dated 24.11.2012 | BSNL W-6 NIT 549024.htm | NIT 54-12139024.doc | A/R and M/O to BSNL Staff Colony, Officer Colony and ancillary structure at Bhagu Road, Bathinda for the year 2012-13 | 01-12-2012 15:00:00 |
01-12-2012 15:30:00 |
||
| 36/EE/BSNL/CD/JL/2012-13 dated 21.11.2012 | NIT NAKODAR8986.htm | NAKODAR8986.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA. (SH: - Construction of 03 Nos tower foundations in Nakodar SDCA) | 30-11-2012 15:00:00 |
30-11-2012 15:30:00 |
||
| NIT NAKODAR8987.htm | APPLICATION8987.doc | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA. (SH: - Construction of 03 Nos tower foundations in Nakodar SDCA) | 30-11-2012 15:00:00 |
30-11-2012 15:30:00 |
|||
| Corrigendum | Corrigendum9002.htm | Construction of Foundation and Erection of 10 Nos. 40 Meter NBLW Towers in Jalandhar SSA. (SH: - Construction of 03 Nos tower foundations in Nakodar SDCA) | 30-11-2012 15:30:00 |
||||
| NIT NO. 23/2012-13/EE/BSNL/CD-I/CHD Dated: - 21-11-2012 | 23NIT128976.htm | 23NIT128976.pdf | Post construction anti termite treatment to the quarters falling under BSNL Civil Sub Division-I, Chandigarh up to 31-12-2013 (Term Contract) | 29-11-2012 15:00:00 |
29-11-2012 15:30:00 |
||
| NIT NO. 23/2012-13/EE/BSNL/CD-I/CHD Dated: - 21-11- | 23NIT128977.htm | 23NIT12 (i)8977.pdf | Post construction anti termite treatment to the quarters falling under BSNL Civil Sub Division-IV, Chandigarh up to 31-12-2013 (Term Contract) | 29-11-2012 15:00:00 |
29-11-2012 15:30:00 |
||
| NIT NO. 23/2012-13/EE/BSNL/CD-I/CHD Dat | 23NIT128978.htm | 23NIT12 (ii)8978.pdf | Post construction anti termite treatment to the quarters falling under BSNL Civil Sub Division-V, Chandigarh up to 31-12-2013 (Term Contract) | 29-11-2012 15:00:00 |
29-11-2012 15:30:00 |
||
| NIT No. 34/EE/BSNL/CD/PTA/2012-2013 Dated: 20.11.12 | bsnl-68979.htm | Tender Document8979.pdf | Day to day maintenance of BSNL buildings in RTTC compound at Rajpura for the Year 2012-13. | 29-11-2012 15:00:00 |
29-11-2012 15:30:00 |
||
| CORRIGENDUM NIT No. 23 | Corrigendum NIT239006.htm | Corrigendum anti termite9006.pdf | 1) Post construction anti termite treatment to the quarters falling under BSNL Civil Sub Division-I, Chandigarh up to 31-12-2013 (Term Contract), 2) Post construction anti termite treatment to the qua | 29-11-2012 15:00:00 |
29-11-2012 15:30:00 |
||
| NIT NO. 22/2012-13/EE/BSNL/CD-I/CHD Dated: - 16-11-2012 | 22NIT128970.htm | 22NIT128970.pdf | Special repair to Telephone Bhawan, Sector-17, Chandigarh (SH: Refixing of peeled off sunmica of partitions at 3rd floor). | 24-11-2012 15:00:00 |
24-11-2012 15:30:00 |
||
| NIT No: 16/2012-13/EE/BSNL/CD-I/CHD Dated:- 9-11-2012 | 16NIT128953.htm | 16NIT128953.pdf | A/R and M/O to BSNL Staff Quarters, Sector-44A, Chandigarh | 23-11-2012 15:00:00 |
23-11-2012 15:30:00 |
||
| NIT NO. 18/2012-13/EE/BSNL/CD-I/CHD Dated: - 9-11-2012 | 18NIT128955.htm | 18NIT128955.pdf | A/R and M/O to BSNL Staff Quarters, Sector-27C, Chandigarh. | 23-11-2012 15:00:00 |
23-11-2012 15:30:00 |
||
| NIT No.33/EE/BSNL/CD/PTA/2012-2013 Dated: 09.11.2012. | bsnl-68960.htm | Tender Document8960.pdf | Miscellaneous repair and painting works in New and Old Admn. Buildings, 2 bull sheds, 5 buffalo sheds, 1 calving shed and 2 heiffer sheds at CIRB, Sub Campus, Nabha. | 23-11-2012 15:00:00 |
23-11-2012 15:30:00 |
||
| NIT No.32/EE/BSNL/CD/PTA/2012-2013 Dated: 09.11.2012. | bsnl-68961.htm | Tender Document8961.pdf | Provision of Partition wall between Tower portion and TE compound and Provision of Barbed wire fencing on wall between staff quarter and Tower portion in TE compound at Dera Bassi. | 23-11-2012 15:00:00 |
23-11-2012 15:30:00 |
||
| Quotation | Quotation Sofa8975.htm | Quotation- Sofa8975.pdf | Repair of Sofa Set at BSNL Inspection Quarter, Sector-43A, Chandigarh” | 23-11-2012 15:00:00 |
23-11-2012 15:30:00 |
||
| Corrigendum to NIT No.32/EE/BSNL/CD/PTA/2012-2013 Dated: 09.11.2012. | Corrigendum8990.htm | Corrigendum8990.pdf | Corrigendum for the work of Provision of Partition wall between Tower portion and TE compound and Provision of Barbed wire fencing on wall between staff quarter and Tower portion in TE compound at Der | 23-11-2012 15:00:00 |
23-11-2012 15:30:00 |
||
| NIT NO. 20/2012-13/EE/BSNL/CD-I/CHD Dated: - 9-11-2012 | 20NIT128957.htm | 20NIT128957.pdf | A/R and M/O to BSNL Admn Building (Sanchar Sadan) at Sector-34, Chandigarh. | 22-11-2012 15:00:00 |
22-11-2012 15:30:00 |
||
| NIT NO. 21/2012-13/EE/BSNL/CD-I/CHD Dated: - 9-11-2012 | 21NIT128958.htm | 21NIT128958.pdf | A/R and M/O to TE building including compound wall in Sector-37, Chandigarh | 22-11-2012 15:00:00 |
22-11-2012 15:30:00 |
||
| NIT NO. 17/2012-13/EE/BSNL/CD-I/CHD Dated: - 9-11-2012 | 17NIT128954.htm | 17NIT128954.pdf | A/R and M/O to BSNL Staff Quarters, Sector-43A, Chandigarh. | 21-11-2012 15:00:00 |
21-11-2012 15:30:00 |
||
| NIT NO. 19/2012-13/EE/BSNL/CD-I/CHD Dated: - 9-11-2012 | 19NIT128956.htm | 19NIT128956.pdf | A/R and M/O to BSNL Staff Quarters, Sector-30A, Chandigarh. | 21-11-2012 15:00:00 |
21-11-2012 15:30:00 |
||
| 15 /EE/BSNL/CD-II/CHD/2012-13/ dated 09-11-2012 | nit 158959.htm | NIT158959.pdf | Provision of 30 Nos additional work stations at GF hall in Admn cum TE building at Sector-20, Panchkula | 21-11-2012 15:00:00 |
21-11-2012 15:30:00 |
||
| 35/EE/BSNL/CD/JL/NIT/2012-13 Dt. 14.11.2012 | NIT Lift8962.htm | Tender Lift8962.doc | “Repair of Opening of Lift well for Installation of New Lift at MTS Nagar Jalandhar(3rd Call) | 21-11-2012 15:00:00 |
21-11-2012 15:30:00 |
||
| NIT Lift8963.htm | APPLICATION8963.doc | Application for the Work :-“Repair of Opening of Lift well for Installation of New Lift at MTS Nagar Jalandhar(3rd Call) | 21-11-2012 15:00:00 |
21-11-2012 15:30:00 |
|||
| 34/EE/BSNL/CD/JL/NIT/2012-13 Dt. 14.11.2012 | NIT Care Taking8964.htm | Tender Care Taking8964.doc | “Care taking/house keeping of Inspection Quarter In CTO Compound, JALANDHAR. | 21-11-2012 15:00:00 |
21-11-2012 15:30:00 |
||
| NIT Care Taking8965.htm | APPLICATION8965.doc | “Care taking/house keeping of Inspection Quarter In CTO Compound, JALANDHAR. | 21-11-2012 15:00:00 |
21-11-2012 15:30:00 |
|||
| 46/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | BSNL W-6 NIT 468905.htm | NIT 46-12138905.doc | Construction 03 Nos. Tower Foundation under BSNL CSD-I, Ludhiana | 17-11-2012 15:00:00 |
17-11-2012 15:30:00 |
||
| 47/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | BSNL W-6 NIT 478906.htm | NIT 47-12138906.doc | Construction 02 Nos. Tower Foundation under BSNL CSD-II, Ludhiana | 17-11-2012 15:00:00 |
17-11-2012 15:30:00 |
||
| 46/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | Corrigendum_NIT 468923.doc | Construction 03 Nos. Tower Foundation under BSNL CSD-I, Ludhiana | 17-11-2012 15:30:00 |
||||
| 47/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | Corrigendum_NIT 478924.doc | Construction 02 Nos. Tower Foundation under BSNL CSD-II, Ludhiana | 17-11-2012 15:30:00 |
||||
| NIT No.30/EE/BSNL/CD/PTA/2012-2013 Dated: 05.11.2012. | bsnl-68934.htm | 1213nit308934.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS IN RTTC COMPOUND AT RAJPURA FOR THE YEAR 2012-13. | 17-11-2012 15:00:00 |
17-11-2012 15:30:00 |
||
| 43/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | BSNL W-6 NIT 438902.htm | NIT 43-12138902.doc | Construction 07 Nos. Tower Foundation under BSNL Civil Sub Division-I, Ferozepur | 15-11-2012 15:00:00 |
15-11-2012 15:30:00 |
||
| 44/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | BSNL W-6 NIT 448903.htm | NIT 44-12138903.doc | Construction 06 Nos. Tower Foundation under BSNL Civil Sub Division-II, Ferozepur | 15-11-2012 15:00:00 |
15-11-2012 15:30:00 |
||
| 45/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | BSNL W-6 NIT 458904.htm | NIT 45-12138904.doc | Construction 07 Nos. Tower Foundation under BSNL Civil Sub Division, Moga | 15-11-2012 15:00:00 |
15-11-2012 15:30:00 |
||
| BSNL W-6 NIT 458907.htm | NIT 45-12138907.doc | Construction 07 Nos. Tower Foundation under BSNL Civil Sub Division, Moga | 15-11-2012 15:00:00 |
15-11-2012 15:30:00 |
|||
| 43/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | Corrigendum_NIT 438920.doc | Construction 07 Nos. Tower Foundation under BSNL Civil Sub Division-I, Ferozepur | 15-11-2012 15:30:00 |
||||
| 44/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | Corrigendum_NIT 448921.doc | Construction 06 Nos. Tower Foundation under BSNL Civil Sub Division-II, Ferozepur | 15-11-2012 15:30:00 |
||||
| 45/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | Corrigendum_NIT 458922.doc | Construction 07 Nos. Tower Foundation under BSNL Civil Sub Division, Moga | 15-11-2012 15:30:00 |
||||
| NIT No. 31/EE/BSNL/CD/PTA/2012-2013 Dated :05.11.2012 | bsnl-68944.htm | Tender Document8944.pdf | Miscellaneous civil works in Inspection Quarter in Kaula Park at Sangrur. | 15-11-2012 15:00:00 |
15-11-2012 15:30:00 |
||
| NIT NO : 20 /EE/BSNL/CD/ASR/2012-13 dated 30-10-2012 | NIT8896.htm | Tender document8896.pdf | Provision of Barbed wire fencing around 40 metre tower at Dhotian (Distt.Tarntaran). | 12-11-2012 15:00:00 |
12-11-2012 15:30:00 |
||
| NIT8897.htm | Application8897.pdf | Provision of Barbed wire fencing around 40 metre tower at Dhotian (Distt.Tarntaran) | 12-11-2012 15:00:00 |
12-11-2012 15:30:00 |
|||
| 22/EE/BSNL/CD/ASR/2012-13 dated 03.11.2012. | NIT8912.htm | Tender document8912.pdf | Repair and Maintenance to BSNL Staff Quarters at Chakki Bank, Pathankot. | 12-11-2012 15:00:00 |
12-11-2012 15:30:00 |
||
| NIT8913.htm | Application8913.pdf | Repair and Maintenance to BSNL Staff Quarters at Chakki Bank, Pathankot. | 12-11-2012 15:00:00 |
12-11-2012 15:30:00 |
|||
| 23/EE/BSNL/CD/ASR/2012-13 dated 03.11.2012. | NIT8914.htm | Tender document8914.pdf | Repair and Maintenance to BSNL Staff Quarters at Batala. | 12-11-2012 15:00:00 |
12-11-2012 15:30:00 |
||
| NIT8915.htm | Application8915.pdf | Repair and Maintenance to BSNL Staff Quarters at Batala. | 12-11-2012 15:00:00 |
12-11-2012 15:30:00 |
|||
| 24/EE/BSNL/CD/ASR/2012-13 dated 03.11.2012. | NIT8916.htm | Tender document8916.pdf | Repair and Maintenance to RLU Building, Sentry post and Compound wall at Quadian. | 12-11-2012 15:00:00 |
12-11-2012 15:30:00 |
||
| NIT8917.htm | Application8917.pdf | Repair and Maintenance to RLU Building, Sentry post and Compound wall at Quadian. | 12-11-2012 15:00:00 |
12-11-2012 15:30:00 |
|||
| 25/EE/BSNL/CD/ASR/2012-13 dated 03.11.2012. | NIT8918.htm | Tender document8918.pdf | Sealing of Manholes of Cable Duct Chambers in Area under DET Bhagtanwala at Amritsar. | 12-11-2012 15:00:00 |
12-11-2012 15:30:00 |
||
| NIT8919.htm | Application8919.pdf | Sealing of Manholes of Cable Duct Chambers in Area under DET Bhagtanwala at Amritsar. | 12-11-2012 15:00:00 |
12-11-2012 15:30:00 |
|||
| 22/EE/BSNL/CD/ASR/2012-13 dated 03.11.2012. | Corrigendum8946.htm | Repair and Maintenance to BSNL Staff Quarters at Chakki Bank, Pathankot. | 12-11-2012 15:30:00 |
||||
| 23/EE/BSNL/CD/ASR/2012-13 dated 03.11.2012. | Corrigendum8947.htm | Repair and Maintenance to BSNL Staff Quarters at Batala. | 12-11-2012 15:30:00 |
||||
| 24/EE/BSNL/CD/ASR/2012-13 dated 03.11.2012. | Corrigendum8948.htm | Repair and Maintenance to RLU Building, Sentry post and Compound wall at Quadian. | 12-11-2012 15:30:00 |
||||
| 25/EE/BSNL/CD/ASR/2012-13 dated 03.11.2012. | Corrigendum8949.htm | Sealing of Manholes of Cable Duct Chambers in Area under DET Bhagtanwala at Amritsar. | 12-11-2012 15:30:00 |
||||
| 41/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | BSNL W-6 NIT 418900.htm | NIT 41-12138900.doc | Raising of Cable Chamber’s Necks from Sherpur Chowk to TE Jugiana under Ludhiana SSA | 09-11-2012 15:00:00 |
09-11-2012 15:30:00 |
||
| 42/2012-13/EE/BSNL/CD/LDH Dated 31.10.2012 | BSNL W-6 NIT 428901.htm | NIT 42-12138901.doc | Special Repair to existing Cable Duct including Sealing the Cable entry points in Cable Chambers near M.C. Drain (Gandha Nala), Transport Nagar Chowk, Ludhiana | 09-11-2012 15:00:00 |
09-11-2012 15:30:00 |
||
| 40/2012-13/EE/BSNL/CD/LDH Dated 20.10.2012 | BSNL W-6 NIT 408886.htm | NIT 40-12138886.doc | Miscellaneous Repair to existing Almirah cum cupboard in reception room, O/o GMT Admn bldg. , Bharat Nagar Ludhiana | 31-10-2012 15:00:00 |
31-10-2012 15:30:00 |
||
| 32/EE/BSNL/CD/JL/NIT/2012-13 Dt. 20-10-2012 | NIT8884.htm | tender mandi8884.doc | Maintenance operations in Telephone Bhawan Railway Mandi at Hoshiarpur. | 29-10-2012 15:00:00 |
29-10-2012 15:30:00 |
||
| NIT8885.htm | APPLICATION mandi8885.doc | Maintenance operations in Telephone Bhawan Railway Mandi at Hoshiarpur. | 29-10-2012 15:00:00 |
29-10-2012 15:30:00 |
|||
| 33/EE/BSNL/CD/JL/NIT/2012-13 Dt. 20-10-2012 | NIT-338887.htm | TENDER8887.doc | Maintenance operations in New T.E.Building at Vakilan Bazaar Hoshiarpur. | 29-10-2012 15:00:00 |
29-10-2012 15:30:00 |
||
| NIT-338888.htm | APPLICATION8888.doc | Maintenance operations in New T.E.Building at Vakilan Bazaar Hoshiarpur. | 29-10-2012 15:00:00 |
29-10-2012 15:30:00 |
|||
| 38/2012-13/EE/BSNL/CD/LDH Dated 16.10.2012 | BSNL W-6 NIT 388864.htm | NIT 38-12138864.doc | Provision of Septic Tank and Soak Pit for Staff Qtrs. In TE Building compound at Sudhar in SSA Ludhiana | 26-10-2012 15:00:00 |
26-10-2012 15:30:00 |
||
| 39/2012-13/EE/BSNL/CD/LDH Dated 16.10.2012 | BSNL W-6 NIT 398865.htm | NIT 39-12138865.doc | Misc repair and painting to staff quarters in P and T colony, Tagore Nagar Ludhiana | 26-10-2012 15:00:00 |
26-10-2012 15:30:00 |
||
| 29/EE/BSNL/CD/JL/NIT/2012-13 Dt. 17.10.2012 | NIT Kunj8867.htm | Tender Kunj8867.doc | Shifting of Out door BTS shelter from Jalandhar Kunj BTS Site to PTU Complex Jalandhar. | 25-10-2012 15:00:00 |
25-10-2012 15:30:00 |
||
| NIT Kunj8868.htm | APPLICATION Kunj8868.doc | Shifting of Out door BTS shelter from Jalandhar Kunj BTS Site to PTU Complex Jalandhar. | 25-10-2012 15:00:00 |
25-10-2012 15:30:00 |
|||
| 30/EE/BSNL/CD/JL/NIT/2012-13 Dt. 17.10.2012 | NIT GTB8869.htm | Tender GTB Nagar8869.doc | Maintenance operations in Telephone Exchange Compound at Guru Teg Bahadar Nagar Jalandhar.(2nd Call) | 25-10-2012 15:00:00 |
25-10-2012 15:30:00 |
||
| NIT GTB8870.htm | APPLICATION GTB Nagar8870.doc | Maintenance operations in Telephone Exchange Compound at Guru Teg Bahadar Nagar Jalandhar.(2nd Call) | 25-10-2012 15:00:00 |
25-10-2012 15:30:00 |
|||
| 31/EE/BSNL/CD/JL/NIT/2012-13 Dt. 19.10.2012 | NIT lift8878.htm | Tender lift8878.doc | Repair of Opening of Lift well for Installation of New Lift at MTS Nagar Jalandhar(2nd Call) | 25-10-2012 15:00:00 |
25-10-2012 15:30:00 |
||
| NIT lift8879.htm | APPLICATION8879.doc | Repair of Opening of Lift well for Installation of New Lift at MTS Nagar Jalandhar(2nd Call) | 25-10-2012 15:00:00 |
25-10-2012 15:30:00 |
|||
| 20/EE/BSNL/CD/ASR/2012-13 Dated:- 12.10.2012 | NIT8855.htm | Tender Doc8855.pdf | Construction of Foundation and Erection of 2 Nos. 40Meter NBLW Towers in Amritsar SSA. (SH: - Foundation) | 23-10-2012 15:00:00 |
23-10-2012 15:30:00 |
||
| NIT8856.htm | Application8856.pdf | Construction of Foundation and Erection of 2 Nos. 40Meter NBLW Towers in Amritsar SSA. (SH: - Foundation) | 23-10-2012 15:00:00 |
23-10-2012 15:30:00 |
|||
| 37/2012-13/EE/BSNL/CD/LDH Dated 16.10.2012 | BSNL W-6 NIT 378863.htm | NIT 37-12138863.doc | Provision of Miscellaneous Civil works in Inspection Quarter Dugri | 23-10-2012 15:00:00 |
23-10-2012 15:30:00 |
||
| TEBLDG at ropar | 53 Mis W68850.htm | Document will be available after date Sep 09,12 | construction | 12-10-2012 03:00:00 |
22-10-2012 03:30:00 |
||
| NIT No.28/EE/BSNL/CD/PTA/2012-2013 Dated: 11.10.2012. | bsnl-68853.htm | 1213nit288853.pdf | Maintenance of Lawns/Trainee Parks in RTTC Complex at Rajpura from November 2012 to March 2013. | 22-10-2012 15:00:00 |
22-10-2012 15:30:00 |
||
| NIT No.29/EE/BSNL/CD/PTA/2012-2013 Dated: 11.10.2012. | bsnlw-68857.htm | 1213nit298857.pdf | A/R and M/O to 7 Nos. Type-V and 1 No. T-V (Duplex) Quarters at Kaula Park at Sangrur. | 22-10-2012 15:00:00 |
22-10-2012 15:30:00 |
||
| 14/EE/BSNL/CD-II/CHD/CSD-PKL/2012-13 dated 12.10.2012 | w68861.htm | 14nit12-138861.pdf | Provision of arrangement for watering of Earth Pits of Data Centre, Sector-20, Panchkula | 22-10-2012 15:00:00 |
22-10-2012 15:30:00 |
||
| NIT NO : 19/EE/BSNL/CD/ASR/2012-13 dated 04.10.2012 | B S N L W 18832.htm | Tender document8832.pdf | Construction of foundation for 2X200 KVA DEA sets at TE Bldg. Katra Sher Singh, Amritsar. | 20-10-2012 15:00:00 |
20-10-2012 15:30:00 |
||
| 19/EE/BSNL/CD/ASR/2012-13 dated 04.10.2012 | B S N L W 18833.htm | Tender document8833.pdf | Construction of foundation for 2X200 KVA DEA sets at TE Bldg. Katra Sher Singh, Amritsar. | 20-10-2012 15:00:00 |
20-10-2012 15:30:00 |
||
| : 19/EE/BSNL/CD/ASR/2012-13 dated 04.10.2012 | B S N L W 18834.htm | Application8834.pdf | Construction of foundation for 2X200 KVA DEA sets at TE Bldg. Katra Sher Singh, Amritsar. | 20-10-2012 15:00:00 |
20-10-2012 15:30:00 |
||
| NIT No. 27/EE/BSNL/CD/PTA/2012-2013 Dated: 09.10.12 | 1213nit27bsnl-68846.htm | 1213nit278846.pdf | AR / MO to 2 Nos. T-IV Staff Quarters in TE Building Complex at Sirhind. | 19-10-2012 15:00:00 |
19-10-2012 15:30:00 |
||
| NIT No.26/EE/BSNL/CD/PTA/2012-2013 Dated: 09.10.2012. | 1213nit26bsnl-68845.htm | 1213nit268845.pdf | Provision of Vitrified tiles flooring inside Guest House and Precast Cement Concrete Chequered Tiles on approach road to Guest house and milk Distribution room in Central Institute for Research on B | 18-10-2012 15:00:00 |
18-10-2012 15:30:00 |
||
| NIT No. :13 / EE/BSNL/CD-II/Chd/csd/mhl/2012-13 Dated :. 06.10.2012 | 53 Mis W68841.htm | 53 Misc NIT8841.pdf | Miscellaneous civil works at sector53 AJITGARH(Mohali) | 15-10-2012 15:00:00 |
15-10-2012 15:30:00 |
||
| NITNO. 15/2012-13/EE/BSNL/CD-I/CHD Dated 6-10-2012 | 15NIT128842.htm | 15NIT128842.pdf | Special Repairs at Telephone Exchange, Sector-49, Chandigarh | 15-10-2012 15:00:00 |
15-10-2012 15:30:00 |
||
| NIT No.25/EE/BSNL/CD/PTA/2012-2013 Dated: 27.09.2012. | 1213nit25bsnl-68804.htm | 1213nit258804.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS IN RTTC COMPOUND AT RAJPURA FOR THE YEAR 2012-13. | 11-10-2012 15:00:00 |
11-10-2012 15:30:00 |
||
| 26/EE/BSNL/CD/JL/NIT/2012-13 Dt. 29.09.2012 | NIT TE Talwara8818.htm | Tender TE Talwara8818.doc | “Maintenance operations in Telephone Exchange Compound at Talwara (Distt. Hoshiarpur). | 11-10-2012 15:00:00 |
11-10-2012 15:30:00 |
||
| NIT TE Talwara8819.htm | APPLICATIO18819.doc | Application for the work “Maintenance operations in Telephone Exchange Compound at Talwara (Distt. Hoshiarpur). | 11-10-2012 15:00:00 |
11-10-2012 15:30:00 |
|||
| 27/EE/BSNL/CD/JL/NIT/2012-13 Dt. 29.09.2012 | NIT SQ Talwara8820.htm | Tender SQ Talwara8820.doc | “Maintenance operations in BSNL Staff Quarters at Talwara (Distt. Hoshiarpur). | 11-10-2012 15:00:00 |
11-10-2012 15:30:00 |
||
| NIT SQ Talwara8821.htm | APPLICATION8821.doc | “Maintenance operations in BSNL Staff Quarters at Talwara (Distt. Hoshiarpur). | 11-10-2012 15:00:00 |
11-10-2012 15:30:00 |
|||
| 28/EE/BSNL/CD/JL/NIT/2012-13 Dt. 29.09.2012 | NIT TE Mukari8822.htm | Tender TE Mukarian8822.doc | “Maintenance operations to T. E.Building at Mukerian (Distt. Hoshiarpur).(2nd Call) | 11-10-2012 15:00:00 |
11-10-2012 15:30:00 |
||
| NIT TE Mukari8823.htm | APPLICATION TE Building8823.doc | Application for the work “Maintenance operations to T. E.Building at Mukerian (Distt. Hoshiarpur).(2nd Call) | 11-10-2012 15:00:00 |
11-10-2012 15:30:00 |
|||
| 36/2012-13/EE/BSNL/CD/LDH dated 27.09.2012 | BSNL W-6 NIT 368810.htm | NIT 36-12138810.doc | A/R and M/O to Staff Quarters, Sanitary Post, Compound Wall, Community Centre in Sanchar Colony, BRS Nagar, Ludhiana for the year 2012-13 | 08-10-2012 15:00:00 |
08-10-2012 15:30:00 |
||
| NIT No. 24/EE/BSNL/CD/PTA/2012-2013 Dated :27.09.2012 | 1213nit24bsnl-68803.htm | 1213nit248803.pdf | A/R and M/O to Type –VI Quarter at Kaula Park at Sangrur. | 08-10-2012 15:00:00 |
08-10-2012 15:30:00 |
||
| 35/EE/BSNL/CD/LDH Dated 27.09.2012 | BSNL W-6 NIT 358809.htm | NIT 35-12138809.doc | Misc. Repairs and Painting to TE building and Admn. Building at Bharat Nagar, Ludhiana | 08-10-2012 15:00:00 |
08-10-2012 15:30:00 |
||
| NIT No.23/EE/BSNL/CD/PTA/2012-2013 Dated:20.09.2012. | 1213nit23bsnl-68792.htm | 1213nit238792.pdf | Provision of M.S. tube racks and shifting of existing aluminum cabins in CAF Section at 3rd floor in TE building Leela Bhawan Patiala. | 01-10-2012 15:00:00 |
01-10-2012 15:30:00 |
||
| NITNO. 14 /2012-13/EE/BSNL/CD-I/CHD Dated:- 22-9-2012 | 14NIT128798.htm | 14NIT128798.pdf | Petty civil works in CGMT Residence, Kothi No 428, Sector 30-A, Chandigarh | 01-10-2012 15:00:00 |
01-10-2012 15:30:00 |
||
| 17/EE/BSNL/CD/ASR/2012-13 dated 20.09.2012. | NIT8788.htm | Tender document8788.pdf | Maintenance and Operational Jobs in Oo the SDE C Pathankot during the year 2012 - 13 October 2012 to March 2013 | 28-09-2012 15:00:00 |
28-09-2012 15:30:00 |
||
| NIT8789.htm | Application8789.pdf | Maintenance and Operational Jobs in O/o the SDE( C ) Pathankot during the year 2012-13( October-2012 to March -2013). | 28-09-2012 15:00:00 |
28-09-2012 15:30:00 |
|||
| 18/EE/BSNL/CD/ASR/2012-13 dated 20.09.2012. | NIT8790.htm | Tender document8790.pdf | Horticulture works and Upkeeping of Lawns / Plants in T.E. Building Compound Pathankot and Gurdaspur during the year 2012-13( October- 2012 to Mach-2013) | 28-09-2012 15:00:00 |
28-09-2012 15:30:00 |
||
| 18/EE/BSNL/CD/ASR/2012-13 dated 20.09.2012 | NIT8791.htm | Application8791.pdf | Horticulture works and Upkeeping of Lawns / Plants in T.E. Building Compound Pathankot and Gurdaspur during the year 2012-13( October- 2012 to Mach-2013) | 28-09-2012 15:00:00 |
28-09-2012 15:30:00 |
||
| NIT No.22/EE/BSNL/CD/PTA/2012-2013 Dated: 13.09.2012. | 1213nit22bsnl-68760.htm | 1213nit228760.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS IN RTTC COMPOUND AT RAJPURA FOR THE YEAR 2012-13. | 26-09-2012 15:00:00 |
26-09-2012 15:30:00 |
||
| 23/EE/BSNL/CD/JL/NIT/2012-13 Dt. 19.09.2012 | NIT Focal8775.htm | Tender Focal Point8775.doc | “Raising of Manhole Necks and Sealing of Cable Duct from T.E Building Industrial area,Jalandher. | 25-09-2012 15:00:00 |
25-09-2012 15:30:00 |
||
| NIT Focal8776.htm | APPLICATION Focal8776.doc | “Raising of Manhole Necks and Sealing of Cable Duct from T.E Building Industrial area,Jalandher. | 25-09-2012 15:00:00 |
25-09-2012 15:30:00 |
|||
| 24/EE/BSNL/CD/JL/NIT/2012-13 Dt. 19.09.2012 | NIT Chajjas CTO8777.htm | Tender Chajas CTO8777.doc | “Repair and recasting of damaged RCC Chajjas of CTO building at Jalandhar. | 25-09-2012 15:00:00 |
25-09-2012 15:30:00 |
||
| NIT Chajjas CTO8778.htm | APPLICATION Chajja8778.doc | “Repair and recasting of damaged RCC Chajjas of CTO building at Jalandhar. | 25-09-2012 15:00:00 |
25-09-2012 15:30:00 |
|||
| 25/EE/BSNL/CD/JL/NIT/2012-13 Dt. 19.09.2012 | NIT Sewrage8779.htm | Tender Sewerage Kapurthala(2nd Call)8779.doc | “Provision of Sewerage line Connection for Microwave Building and Staff quarters at Kapurthala(2nd Call) | 25-09-2012 15:00:00 |
25-09-2012 15:30:00 |
||
| NIT Sewrage8780.htm | APPLICATION Sewerage8780.doc | of “Provision of Sewerage line Connection for Microwave Building and Staff quarters at Kapurthala(2nd Call) | 25-09-2012 15:00:00 |
25-09-2012 15:30:00 |
|||
| CORRIGENDUM 23/EE/BSNL/CD/JL/NIT/2012-13 dated 19.09.2012 | Corrigendum8799.htm | Corrigendum8799.doc | CORRIGENDUM Raising of Manhole Necks and sealing of Cable duct from TE Building Focal Point to TE Building Ind.Area,Jalandhar City” | 25-09-2012 15:00:00 |
25-09-2012 15:30:00 |
||
| 22/EE/BSNL/CD/JL/NIT/2012-13 Dt. 17-09-2012 | NIT228766.htm | tender document228766.doc | Civil work at MTS Switch Room at 1st floor Jalandhar for Phase VII ZTE Equipment. | 20-09-2012 15:00:00 |
20-09-2012 15:30:00 |
||
| NIT228767.htm | APPLICATION228767.doc | Civil work at MTS Switch Room at 1st floor Jalandhar for Phase VII ZTE Equipment. | 20-09-2012 15:00:00 |
20-09-2012 15:30:00 |
|||
| Corrigendum to Quotation No.03/EE/BSNL/CD/PTA/12-13 Dated: 11.09.2012. | 1213corrigendumq38769.htm | 1213corrigendumq38769.pdf | Provision of missing nuts/bolts and tightening of nuts/bolts of Bapror GBT Tower and its Platform in SDCA Rajpura | 19-09-2012 15:00:00 |
19-09-2012 15:30:00 |
||
| Quotation No.03/EE/BSNL/CD/PTA/12-13 Dated: 11.09.2012. | 1213q3bsnl-68752.htm | Schedule of quantity Q-038752.pdf | Provision of missing nuts/bolts and tightening of nuts/bolts of Bapror GBT Tower and its Platform in SDCA Rajpura | 17-09-2012 15:00:00 |
17-09-2012 15:30:00 |
||
| NIT No. 21/EE/BSNL/CD/PTA/2012-2013 Dated: 05.09.12 | 1213nit21bsnl068740.htm | 1213nit218740.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS IN THE JURISDICTION OF DET FATEHGARH, SAMANA, NABHA AND MGG IN PATIALA SSA FOR THE PERIOD UP TO NOVEMBER 2012. | 15-09-2012 15:00:00 |
15-09-2012 15:30:00 |
||
| NIT No.20/EE/BSNL/CD/PTA/2012-2013 Dated:03.09.2012. | 1213nit20bsnl068731.htm | 1213nit208731.pdf | Provision of boundary wall around B.T.S. tower and equipment room at Old T.E. building store compound near Bus Stand at Nabha. | 14-09-2012 15:00:00 |
14-09-2012 15:30:00 |
||
| 12/EE/BSNL/CD-II/CHD/2012-13 dated 06.09.2012 | w68741.htm | 12NIT12-138741.pdf | Day to day maintenance of BSNL Buildings under ROPAR SSA Upto 31.03.2013.(IInd Call) | 14-09-2012 15:00:00 |
14-09-2012 15:30:00 |
||
| 34/2012-13/EE/BSNL/CD/LDH Dated 06.09.2012 | BSNL W-6 NIT 348743.htm | NIT 34-12138743.doc | Raising the cable chamber’s necks of Cable route falling within Jurisdiction area of DET Focal Point at Ludhiana | 14-09-2012 15:00:00 |
14-09-2012 15:30:00 |
||
| Quotation No. 04 /EE/BSNL/CD/PTA/2012-13 Dated: 11.09.2012 | 1213q04bsnl-68753.htm | Schedule of quantity 1213q048753.pdf | Provision of Post constructional Antitermite treatment for wooden partitions and counters in CSC in TE building Leela Bhawan Patiala | 14-09-2012 15:00:00 |
14-09-2012 15:30:00 |
||
| 21/EE/BSNL/CD/JL/NIT/2012-13 Dt. 04.09.2012 | NIT SQ HSP 3rd8736.htm | Tender Day to Day SQ HSP 3rd call8736.doc | “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Division Hoshiarpur for the period 2012-2013(3rd Call). | 13-09-2012 15:00:00 |
13-09-2012 15:30:00 |
||
| NIT SQ HSP 3rd8737.htm | APPLICATION Admn8737.doc | “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Division Hoshiarpur for the period 2012-2013(3rd Call). | 13-09-2012 15:00:00 |
13-09-2012 15:30:00 |
|||
| 33/2012-13/EE/BSNL/CD/LDH Dated 27.08.2012 | BSNL W-6 NIT 338716.htm | NIT 33-12138716.doc | Painting and Misc. repair to Staff Quarters under BSNL CSD-II, Ludhiana | 04-09-2012 15:00:00 |
04-09-2012 15:30:00 |
||
| NITNO13/2012-13/EE/BSNL/CD-I/CHDdated:23-8-2012 | Corrigendum nit no 138718.htm | Provision of Battery and Power Plant Room at CMTS, Nodal Centre, Ramdarbar, Chandigarh. | 01-09-2012 15:30:00 |
||||
| 11/ EE/BSNL/CD-II/Chd/csd/mhl/2012-13 dated24.08.2012 | corregendum MLI8727.htm | Maintenance and operational jobs in O/o Executive Engineer ( C) BSNL civil Division -II Chandigarh at sector-27 Chandigarh. | 01-09-2012 15:30:00 |
||||
| NITNO13/2012-13/EE/BSNL/CD-I/CHDdated:23-8-2012 | 13NIT128710.htm | 13NIT128710.pdf | Provision of Battery and Power Plant Room at CMTS, Nodal Centre, Ramdarbar, Chandigarh. | 31-08-2012 15:00:00 |
31-08-2012 15:30:00 |
||
| 11/ EE/BSNL/CD-II/Chd/csd/mhl/2012-13 dated24.08.2012 | bsnl 6 nit labour ee8711.htm | nit labour ee8711.pdf | Maintenance and operational jobs in O/o Executive Engineer ( C) BSNL civil Division -II Chandigarh at sector-27 Chandigarh. | 31-08-2012 15:00:00 |
31-08-2012 15:30:00 |
||
| Corrigendum | corregendum MLI8726.htm | Maintenance and operational jobs in O/o Executive Engineer ( C) BSNL civil Division -II Chandigarh at sector-27 Chandigarh. | 31-08-2012 15:30:00 |
||||
| NIT No.19/EE/BSNL/CD/PTA/2012-2013 Dated:16.08.2012 | 1213nit19bsnl068689.htm | 1213nit198689.pdf | Provision of additional Bore for submersible pump in T.E. Building compound at Sangrur. | 25-08-2012 15:00:00 |
25-08-2012 15:30:00 |
||
| Corrigendum to NIT No.19/EE/BSNL/CD/PTA/2012-2013 Dated 16.08.2012 | 1213nit19-corr8691.htm | 1213nit19-corr8691.pdf | Provision of additional Bore for submersible pump in T.E. Building compound at Sangrur. | 25-08-2012 15:00:00 |
25-08-2012 15:30:00 |
||
| NIT NO: 20/EE/BSNL/CD/JL/NIT/2012-13 Dt. 14.08.2012 | NIT8684.htm | Tender Qtrs HSP8684.doc | “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Division Hoshiarpur for the period 2012-2013.(2nd Call) | 22-08-2012 15:00:00 |
22-08-2012 15:30:00 |
||
| 20/EE/BSNL/CD/JL/NIT/2012-13 Dt. 14.08.2012 | NIT8685.htm | APPLICATION Qtrs8685.doc | of “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Division Hoshiarpur for the period 2012-2013.(2nd Call) | 22-08-2012 15:00:00 |
22-08-2012 15:30:00 |
||
| 07/EE/BSNL/CD-II/CHD/2012-13 Dated: 09.08.2012 | w68676.htm | 7NIT12-138676.pdf | Replacement of old antistatic PVC flooring in switch room of OCB TE at GZS Nagar, Roopnagar. | 18-08-2012 15:00:00 |
18-08-2012 15:30:00 |
||
| 08/EE/BSNL/CD-II/CHD/2012-13 Dated: 09.08.2012 | w68677.htm | 8NIT12-138677.pdf | Special repair to Type-I and Type-II staff quarters in TRA complex at Roopnagar. | 18-08-2012 15:00:00 |
18-08-2012 15:30:00 |
||
| 09/EE/BSNL/CD-II/CHD/2012-13 Dated: 09.08.2012 | w68678.htm | 9NIT12-138678.pdf | Day to day maintenance of BSNL Buildings under ROPAR SSA Upto 31.03.2013. | 18-08-2012 15:00:00 |
18-08-2012 15:30:00 |
||
| 10/EE/BSNL/CD-II/CHD/CSD Ropar/2012-13 Dated:- 09.08.2012 | w68679.htm | 10NIT12-13 CSC8679.pdf | Minor repairs and facelift of Customer Service Centre in TRA complex at Ropar. | 18-08-2012 15:00:00 |
18-08-2012 15:30:00 |
||
| 16/EE/BSNL/CD/JL/NIT/2012-13 Dt. 06.08.2012 | NIT Sewarage8662.htm | Tender Sewerage Kapurthala8662.doc | “Provision of Sewerage line Connection for Microwave Building and Staff quarters at Kapurthala | 16-08-2012 15:00:00 |
16-08-2012 15:30:00 |
||
| NIT Sewarage8663.htm | APPLICATION Sewerage8663.doc | “Provision of Sewerage line Connection for Microwave Building and Staff quarters at Kapurthala | 16-08-2012 15:00:00 |
16-08-2012 15:30:00 |
|||
| 17/EE/BSNL/CD/JL/NIT/2012-13 Dt. 06.08.2012 | nit TE8665.htm | Tender TE Mukarian8665.doc | “Maintenance operations to T. E.Building at Mukerian (Distt. Hoshiarpur). | 16-08-2012 15:00:00 |
16-08-2012 15:30:00 |
||
| nit TE8666.htm | APPLICATION TE Building 18666.doc | “Maintenance operations to T. E.Building at Mukerian (Distt. Hoshiarpur). | 16-08-2012 15:00:00 |
16-08-2012 15:30:00 |
|||
| 18/EE/BSNL/CD/JL/NIT/2012-13 Dt. 06.08.2012 | nit sq8667.htm | Tender SQ Mukarian8667.doc | “Maintenance operations to BSNL Staff Quarters at Mukerian (Distt. Hoshiarpur). | 16-08-2012 15:00:00 |
16-08-2012 15:30:00 |
||
| nit sq8668.htm | APPLICATION SQ Mukarian8668.doc | “Maintenance operations to BSNL Staff Quarters at Mukerian (Distt. Hoshiarpur). | 16-08-2012 15:00:00 |
16-08-2012 15:30:00 |
|||
| 19/EE/BSNL/CD/JL/NIT/2012-13 Dt. 06.08.2012 | NIT OAN8670.htm | Tender Sub Division OAN Chambers HSP8670.doc | “Lowering of OAN Chambers and cable duct manhole necks at Una Road (Gautam Nagar ) and along the road from Govt. College Chowk to Parbhat Chowk at Hoshiarpur. | 16-08-2012 15:00:00 |
16-08-2012 15:30:00 |
||
| NIT OAN8671.htm | APPLICATION OAN Chambers HSP8671.doc | “Lowering of OAN Chambers and cable duct manhole necks at Una Road (Gautam Nagar ) and along the road from Govt. College Chowk to Parbhat Chowk at Hoshiarpur. | 16-08-2012 15:00:00 |
16-08-2012 15:30:00 |
|||
| 31/2012-13/EE/BSNL/CD/LDH Dated 03.08.2012 | BSNL W-6 NIT 318649.htm | NIT 31-12138649.doc | Infrastructure for Defence Project (NFS) —“Civil works for Ascon Node (Back Bone Node T-2) at Nathewala (Faridkot).” | 14-08-2012 15:00:00 |
14-08-2012 15:30:00 |
||
| 32/2012-13/EE/BSNL/CD/LDH Dated 03.08.2012 | BSNL W-6 NIT 328650.htm | NIT 32-12138650.doc | Provision of water supply pipe line from existing Pump supply in T.E. compound to CTO blocks in Mata Rani BSNL Compound at Ludhiana | 13-08-2012 15:00:00 |
13-08-2012 15:30:00 |
||
| 15/EE/BSNL/CD/ASR/2012-13 dated 03.08.2012 | NITl8658.htm | Tender document8658.pdf | Maintenanceand operational jobs in O/o the EE(C) and SDE (C)-PH-II, Amritsar) | 13-08-2012 15:00:00 |
13-08-2012 15:30:00 |
||
| 15/EE/BSNL/CD/ASR/2012-13 dated 03.08.2012. | NITl8659.htm | Application8659.pdf | Maintenance and operational jobs in O/o the EE(C)andSDE (C)-PH-II, Amritsar). | 13-08-2012 15:00:00 |
13-08-2012 15:30:00 |
||
| 16/EE/BSNL/CD/ASR/2012-13 dated 06.08.2012. | NIT8660.htm | Tender document8660.pdf | Civil works for shifting of office of BSNL Civil Division at 2nd floor T.E. Building Compound Albert Road, Amritsar. | 13-08-2012 15:00:00 |
13-08-2012 15:30:00 |
||
| NIT8661.htm | Application8661.pdf | Civil works for shifting of office of BSNL Civil Division at 2nd floor T.E. Building Compound Albert Road, Amritsar. | 13-08-2012 15:00:00 |
13-08-2012 15:30:00 |
|||
| NITNO. 12/2012-13/EE/BSNL/CD-I/CHD Dated:- 31-7-2012 | 12NIT128633.htm | 12NIT128633.pdf | Mtce. of horticulture works in the compound of Administrative Block, Sector 34, Chandigarh for the year 2012-13.” | 09-08-2012 15:00:00 |
09-08-2012 15:30:00 |
||
| 14/EE/BSNL/CD/ASR/2012-13 dated 30.07.2012. | NIT8618.htm | Tender document8618.pdf | Provision of Aluminium partition in the Switch Room of T.E. Building at Goindwal Sahib (Amritsar) | 07-08-2012 15:00:00 |
07-08-2012 15:30:00 |
||
| NIT8619.htm | Application8619.pdf | Provision of Aluminium partition in the Switch Room of T.E. Building at Goindwal Sahib (Amritsar) | 07-08-2012 15:00:00 |
07-08-2012 15:30:00 |
|||
| 12/EE/BSNL/CD/JL/NIT/2012-13 Dt. 30.-07-2012 | NIT SQ JP Nagar8623.htm | Tender SQ JP Nagar8623.doc | “Maintenance operations to Staff Quarters in Telephone Exchange Compound at JP Nagar Jalandhar. | 07-08-2012 15:00:00 |
07-08-2012 15:30:00 |
||
| NIT SQ JP Nagar8624.htm | APPLICATION SQ JP8624.doc | “Maintenance operations to Staff Quarters in Telephone Exchange Compound at JP Nagar Jalandhar. | 07-08-2012 15:00:00 |
07-08-2012 15:30:00 |
|||
| 13/EE/BSNL/CD/JL/NIT/2012-13 Dt. 30.-07-2012 | NIT TE JP Nagar8625.htm | Tender TE JP Nagar8625.doc | “Maintenance operations in Telephone Exchange Building at JP NagarJalandhar. | 07-08-2012 15:00:00 |
07-08-2012 15:30:00 |
||
| NIT TE JP Nagar8626.htm | APPLICATION TE JP8626.doc | “Maintenance operations in Telephone Exchange Building at JP NagarJalandhar. | 07-08-2012 15:00:00 |
07-08-2012 15:30:00 |
|||
| 14/EE/BSNL/CD/JL/NIT/2012-13 Dt. 30.-07-2012 | NIT GTB8627.htm | Tender GTB Nagar8627.doc | “Maintenance operations in Telephone Exchange Compound at Guru Teg Bahadar Nagar Jalandhar. | 07-08-2012 15:00:00 |
07-08-2012 15:30:00 |
||
| NIT GTB8628.htm | APPLICATION GTB Nagar8628.doc | “Maintenance operations in Telephone Exchange Compound at Guru Teg Bahadar Nagar Jalandhar. | 07-08-2012 15:00:00 |
07-08-2012 15:30:00 |
|||
| 15/EE/BSNL/CD/JL/NIT/2012-13 Dt. 30.-07-2012 | NIT Alumin CTO8629.htm | Tender Aluminum CTO8629.doc | Supply of 3 1 7 TR Microprocessor controlled AC package unit with air coled condenser for ground floor top dishcarge in CTO bldg Jalandhar SH Aluminium Partition | 07-08-2012 15:00:00 |
07-08-2012 15:30:00 |
||
| NIT Alumin CTO8630.htm | APPLICATION Alumin CTO8630.doc | “Supply of (3 plus1) x 7 TR Microprocessor controlled AC package units with air coled condenser for ground floor (top dishcarge) in CTO bldg Jalandhar (SH:Aluminium Partition). | 07-08-2012 15:00:00 |
07-08-2012 15:30:00 |
|||
| 12/EE/BSNL/CD/ASR/2012-13 dated 27.07.2012. | NIT8606.htm | Tender document8606.pdf | Civil works for shifting of office of BSNL Civil Division at 2nd floor T.E. building compound Albert road Amritsar. | 04-08-2012 15:00:00 |
04-08-2012 15:30:00 |
||
| NIT8607.htm | Application8607.pdf | Civil works for shifting of office of BSNL Civil Division at 2nd floor T.E. building compound Albert road Amritsar. | 04-08-2012 15:00:00 |
04-08-2012 15:30:00 |
|||
| 13/EE/BSNL/CD/ASR/2012-13 dated 28.07.2012. | NIT8609.htm | Tender document8609.pdf | Dismantling damaged grit plaster including replastering the same of E-10-B building Pathankot. | 04-08-2012 15:00:00 |
04-08-2012 15:30:00 |
||
| NIT8610.htm | Application8610.pdf | Dismantling damaged grit plaster including replastering the same of E-10-B building Pathankot. | 04-08-2012 15:00:00 |
04-08-2012 15:30:00 |
|||
| 10/EE/BSNL/CD/JL/NIT/2012-13 Dt. 28-07-2012 | NIT Admin8611.htm | Tender Admn HSP8611.doc | “Day to day Maintenance to Technical and Admn buildings under the Jurisdiction of BSNL Civil Sub Division Hoshiarpur for the period 2012-2013. | 04-08-2012 15:00:00 |
04-08-2012 15:30:00 |
||
| NIT Admin8612.htm | APPLICATION Admn8612.doc | “Day to day Maintenance to Technical and Admn buildings under the Jurisdiction of BSNL Civil Sub Division Hoshiarpur for the period 2012-2013. | 04-08-2012 15:00:00 |
04-08-2012 15:30:00 |
|||
| 11/EE/BSNL/CD/JL/NIT/2012-13 Dt. 28-07-2012 | NIT Qtrs8613.htm | Tender Qtrs HSP8613.doc | “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Division Hoshiarpur for the period 2012-2013. | 04-08-2012 15:00:00 |
04-08-2012 15:30:00 |
||
| NIT Qtrs8614.htm | APPLICATION Qtrs8614.doc | “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Division Hoshiarpur for the period 2012-2013. | 04-08-2012 15:00:00 |
04-08-2012 15:30:00 |
|||
| Quotation No.02/EE/BSNL/CD/PTA/2012-2013 Dated: 01.08.2012. | Quotation-028643.htm | Schedule of quantity Q-028643.pdf | Plantation of trees in BSNL buildings in SSA Patiala (Year 2012-13) | 04-08-2012 15:00:00 |
04-08-2012 15:30:00 |
||
| Quotation | Quotation8615.htm | Tanda8615.doc | Repair to main doors of CSC in T.E. Building at Tanda | 30-07-2012 15:00:00 |
30-07-2012 15:30:00 |
||
| Quotation8616.htm | Hoarding8616.doc | Removal of 03Nos. MS hoardings structure in Hoshiarpur SSA. | 30-07-2012 15:00:00 |
30-07-2012 15:30:00 |
|||
| NIT No.18/EE/BSNL/CD/PTA/2012-2013 Dated: 20.07.2012. | 1213nit18bsnl-68594.htm | 1213nit188594.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS IN THE JURISDICTION OF DET FATEHGARH, SAMANA, NABHA AND MGG UNDER PATIALA SSA FOR THE YEAR 2012-13 (UPTO AUGUST 2012). | 28-07-2012 15:00:00 |
28-07-2012 15:30:00 |
||
| NITNO. 11/2012-13/EE/BSNL/CD-I/CHD Dated:- 17-7-2012 | 11NIT128582.htm | 11NIT128582.pdf | Mtce. of horticulture works in the compound of Administrative Block, Sector 34, Chandigarh for the year 2012-13.” | 25-07-2012 15:00:00 |
25-07-2012 15:30:00 |
||
| 09/EE/BSNL/CD/JL/NIT/2012-13 Dated 18-07-2012. | NIT098585.htm | Tender Document 098585.doc | Hiring of 1 No. of Non Air Conditioned Tata Indica Car for 1600 Kms. Per month. | 25-07-2012 15:00:00 |
25-07-2012 15:30:00 |
||
| 09/EE/BSNL/CD/JL/NIT/2012-13 Dated 18-07-2012. | NIT098586.htm | Application Tender098586.doc | Hiring of 1 No. of Non Air Conditioned Tata Indica Car for 1600 Kms. Per month. | 25-07-2012 15:00:00 |
25-07-2012 15:30:00 |
||
| 30/2012-13/EE/BSNL/CD/LDH Dated 13.07.2012 | BSNL W-6 NIT 308579.htm | NIT 30-12138579.doc | Painting to Re-allotted Staff Quarters under CSD-I, Ludhiana | 24-07-2012 15:00:00 |
24-07-2012 15:30:00 |
||
| 29/2012-13/EE/BSNL/CD/LDH Dated 13.07.2012 | BSNL W-6 NIT 298578.htm | NIT 29-12138578.doc | Day to Day Maintenance for TE Buildings of Local area under BSNL Civil Sub Division-II, Ludhiana | 23-07-2012 15:00:00 |
23-07-2012 15:30:00 |
||
| 27/2012-13/EE/BSNL/CD/LDH Dated 12.07.2012 | BSNL W-6 NIT 278571.htm | NIT 27-12138571.doc | Repair of terrace at Bharat Nagar and Misc civil works at Dhindsa. | 19-07-2012 15:00:00 |
19-07-2012 15:30:00 |
||
| 28/2012-13/EE/BSNL/CD/LDH Dated 12.07.2012 | BSNL W-6 NIT 288572.htm | NIT 28-12138572.doc | Maintenance of Horticulture works in GMT Complex and Inspection Quarters at Ferozepur Cantt | 19-07-2012 15:00:00 |
19-07-2012 15:30:00 |
||
| NIT No.17/EE/BSNL/CD/PTA/2012-2013 Dated: 07.07.2012. | 1213nit17bsnl-68559.htm | 1213nit178559.pdf | Raising of left hand side boundary wall for closing of windows and ventilators of hotel directly opening in T.E. building compound at Nabha. | 18-07-2012 15:00:00 |
18-07-2012 15:30:00 |
||
| 26/2012-13/EE/BSNL/CD/LDH Dated 06.07.2012 | BSNL W-6 NIT 268552.htm | NIT 26-12138552.doc | Misc. civil work in SBS Nagar, S/C, Dugri Ludhiana | 13-07-2012 15:00:00 |
13-07-2012 15:30:00 |
||
| NITNO. 10/2012-13/EE/BSNL/CD-I/CHD | 10NIT128569.htm | 10 NIT128569.pdf | Construction of Bridge i/c approach roads at NIPER Mohali.(SH: Provision of drainage of rain water from approach roads) | 13-07-2012 15:00:00 |
13-07-2012 15:30:00 |
||
| Corrigendum nit No. 09 | Corrigendum nit 098558.htm | Corrigendum nit no 098558.pdf | Maintenance and Operational jobs in the O/o Chief Architect, BSNL, Mohali for the period 2012-13 | 12-07-2012 15:00:00 |
12-07-2012 15:30:00 |
||
| 24/2012-13/EE/BSNL/CD/LDH Dated 03.07.2012 | BSNL W-6 NIT 248536.htm | NIT 24-12138536.doc | Day to Day Maintenance for Staff Quarters in Bathinda SSA | 11-07-2012 15:00:00 |
11-07-2012 15:30:00 |
||
| 25/2012-13/EE/BSNL/CD/LDH Dated 03.07.2012 | BSNL W-6 NIT 258537.htm | NIT 25-12138537.doc | Day to Day Maintenance for TE Buildings in Bathinda SSA | 11-07-2012 15:00:00 |
11-07-2012 15:30:00 |
||
| 06/EE/BSNL/CD/JL/NIT/2012-13 Dt. 03-07-2012 | NIT Admin8520.htm | Tender Doc day to Day Admin8520.doc | “Day to day maintenac to Technical and Admn buildings under the jurisdiction of BSNL Civil Sub Division Jalandhar for the period 2012-13 | 10-07-2012 15:00:00 |
10-07-2012 15:30:00 |
||
| NIT Admin8523.htm | APPLICATION Admin8523.doc | “Day to day maintenac to Technical and Admn buildings under the jurisdiction of BSNL Civil Sub Division Jalandhar for the period 2012-13 | 10-07-2012 15:00:00 |
10-07-2012 15:30:00 |
|||
| 07/EE/BSNL/CD/JL/NIT/2012-13 Dt. 03-07-2012 | NIT Outer8526.htm | Tender Day To day Outer8526.doc | “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Jalandhar for the period 2012-2013( Outer Jalandhar Area.) | 10-07-2012 15:00:00 |
10-07-2012 15:30:00 |
||
| NIT Outer8529.htm | APPLICATION Outer8529.doc | “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Jalandhar for the period 2012-2013( Outer Jalandhar Area.) | 10-07-2012 15:00:00 |
10-07-2012 15:30:00 |
|||
| 08/EE/BSNL/CD/JL/NIT/2012-13 Dt. 03-07-2012 | NIT Local8532.htm | Tender Doc Local8532.doc | “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Jalandhar for the period 2012-2013(Local Jalandhar Area.) | 10-07-2012 15:00:00 |
10-07-2012 15:30:00 |
||
| 08/EE/BSNL/CD/JL/NIT/2012-13 Dt. 03-07-2012 | NIT Local8535.htm | APPLICATION Local8535.doc | “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Jalandhar for the period 2012-2013(Local Jalandhar Area.) | 10-07-2012 15:00:00 |
10-07-2012 15:30:00 |
||
| 06/EE/BSNL/CD/JL/NIT/2012-13 dated 03.07.2012 | Corrigendum8546.htm | Corrigendum8546.doc | Corrigendum for the work “Day to day maintenac to Technical and Admn buildings under the jurisdiction of BSNL Civil Sub Division Jalandhar for the period 2012-13 | 10-07-2012 15:00:00 |
10-07-2012 15:30:00 |
||
| 07/EE/BSNL/CD/JL/NIT/2012-13 Dt. 03-07-2012 | Corrigendum8549.htm | Corrigendum8549.doc | Corrigendum for the work “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Jalandhar for the period 2012-2013( Outer Jalandhar Area.) | 10-07-2012 15:00:00 |
10-07-2012 15:30:00 |
||
| 08/EE/BSNL/CD/JL/NIT/2012-13 Dt. 03-07-2012 | Corrigendum8550.htm | Corrigendum8550.doc | corrigendum for the work “Day to day Maintenance to BSNL staff quarters under the Jurisdiction of BSNL Civil Sub Jalandhar for the period 2012-2013(Local Jalandhar Area.) | 10-07-2012 15:00:00 |
10-07-2012 15:30:00 |
||
| NITNO. 09/2012-13/EE/BSNL/CD-I/CHD Dated:- 29-6-2012 | 09NIT128507.htm | 9NIT128507.pdf | Maintenance and Operational jobs in the O/o Chief Architect, BSNL, Mohali for the period 2012-13 | 07-07-2012 15:00:00 |
07-07-2012 15:30:00 |
||
| NIT No.14/EE/BSNL/CD/PTA/2012-2013 Dated:25.06.2012. | 1213nit14bsnl-68493.htm | 1213nit148493.pdf | Providing and installing of 8 inch dia M.S. and PVC Pipe tubewell at SST BSNL Colony at Patiala. | 06-07-2012 15:00:00 |
06-07-2012 15:30:00 |
||
| NITNO. 08/2012-13/EE/BSNL/CD-I/CHD Dated:- 28-6-2012 | 08NIT128503.htm | 08NIT128503.pdf | Maintenance and Operational jobs in the O/o Sub Divisional Engineer(C), BSNL Civil Sub Division-I Chandigarh for the period July 2012 to march 2013. | 06-07-2012 15:00:00 |
06-07-2012 15:30:00 |
||
| 23/2012-13/EE/BSNL/CD/LDH Dated 25.06.2012 | BSNL W-6 NIT 238492.htm | NIT 23-12138492.doc | Provision of Barbed Wire Fencing for the BSNL Plot at Ferozepur City | 04-07-2012 15:00:00 |
04-07-2012 15:30:00 |
||
| NIT No.15/EE/BSNL/CD/PTA/2012-2013 Dated: 26.06.2012. | 1213nit15bsnl-68497.htm | 1213nit158497.pdf | Raising of left hand side boundary wall for closing of windows and ventilators of hotel directly opening in T.E. building compound at Nabha. | 04-07-2012 15:00:00 |
04-07-2012 15:30:00 |
||
| NIT No.16/EE/BSNL/CD/PTA/2012-2013 Dated: 26.06.2012. | 1213nit16bsnl-68498.htm | 1213nit168498.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS IN THE JURISDICTION OF DET FATEHGARH, SAMANA, NABHA and MGG IN PATIALA SSA FOR THE PERIOD FROM JUNE 2012 TO NOV 2012 | 04-07-2012 15:00:00 |
04-07-2012 15:30:00 |
||
| NITNO. 07/2012-13/SDE/BSNL/CSD-I/CHD | 07NIT128490.htm | 07NIT128490.pdf | Lowering 0f Cable duct Manholes at Ramdarbar, I/A Phase-II, Chandigarh.. | 30-06-2012 15:00:00 |
30-06-2012 15:30:00 |
||
| Quotation | Quotation-348504.htm | Quotation-348504.pdf | Provision of Gypsum partition for covering electric cables in G.M (CFA) Cabin at Admn Building Sector 34 Chandigarh. | 30-06-2012 15:00:00 |
30-06-2012 15:30:00 |
||
| 11/EE/BSNL/CD/ASR/2012-13 dated:- 20.06.2012 | NIT8470.htm | Tender Change of Occopancy8470.doc | “Painting to BSNL Staff Quarters in Amritsar SSA on change of Occupancy during the year 2012-13” | 29-06-2012 15:00:00 |
29-06-2012 15:30:00 |
||
| NIT8471.htm | APPLICATIO1 Change8471.doc | “Painting to BSNL Staff Quarters in Amritsar SSA on change of Occupancy during the year 2012-13” | 29-06-2012 15:00:00 |
29-06-2012 15:30:00 |
|||
| 07/EE/BSNL/CD/ASR/2012-13 dated 20.06.2012 | NIT IQ8460.htm | Tender IQ68460.doc | “Renovation works in Inspection Quarter no 6 and corridor of inspections quarters at T.E Building ,Albert Road, Amritsar | 28-06-2012 15:00:00 |
28-06-2012 15:30:00 |
||
| 07/EE/BSNL/CD/ASR/2012-13 dated 20.06.2012 | NIT IQ8461.htm | APPLICATION8461.doc | “Renovation works in Inspection Quarter no 6 and corridor of inspections quarters at T.E Building ,Albert Road, Amritsar | 28-06-2012 15:00:00 |
28-06-2012 15:30:00 |
||
| 08/EE/BSNL/CD/ASR/2012-13 dated 20.06.2012 | NIT Mall8462.htm | tender horti Mall Mandi8462.doc | “Maintenance of Horticulture works in B.S.N.L. Compound at Mall Mandi ( Asr) during the Year 2012-13. | 28-06-2012 15:00:00 |
28-06-2012 15:30:00 |
||
| NIT Mall8463.htm | APPLICATION Mall Mandi8463.doc | “Maintenance of Horticulture works in B.S.N.L. Compound at Mall Mandi ( Asr) during the Year 2012-13. | 28-06-2012 15:00:00 |
28-06-2012 15:30:00 |
|||
| 09/EE/BSNL/CD/ASR/2012-13 dated 20.06.2012 | NIT GRDM8464.htm | Tender Hori GRDM8464.doc | “Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg ( Asr.) during the Year 2012-13 . | 28-06-2012 15:00:00 |
28-06-2012 15:30:00 |
||
| 09/EE/BSNL/CD/ASR/2012-13 dated 20.06.2012 | NIT GRDM8465.htm | APPLICATION GRDM8465.doc | “Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg ( Asr.) during the Year 2012-13 . | 28-06-2012 15:00:00 |
28-06-2012 15:30:00 |
||
| 10/EE/BSNL/CD/ASR/2012-13 dated 20.06.2012 | NIT Ranjeet8466.htm | Tender Hori Ranjit Avenue8466.doc | “Maintenance of Horticulture works in B.S.N.L. Compound at Ranjit Avenue ( Asr.) during the Year 2012-13 . | 28-06-2012 15:00:00 |
28-06-2012 15:30:00 |
||
| NIT Ranjeet8467.htm | APPLICATIO1 Ranjit8467.doc | “Maintenance of Horticulture works in B.S.N.L. Compound at Ranjit Avenue ( Asr.) during the Year 2012-13 . | 28-06-2012 15:00:00 |
28-06-2012 15:30:00 |
|||
| 08/EE/BSNL/CD/ASR/2012-13 dated 20.06.2012 | Corrigendum_san8495.htm | “Maintenance of Horticulture works in B.S.N.L. Compound at Mall Mandi ( Asr) during the Year 2012-13. | 28-06-2012 15:30:00 |
||||
| 09/EE/BSNL/CD/ASR/2012-13 dated 20.06.2012 | Corrigendum_san8496.htm | “Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg ( Asr.) during the Year 2012-13 . | 28-06-2012 15:30:00 |
||||
| 22/2012-13/EE/BSNL/CD/LDH Dated 19.06.2012 | BSNL W-6 NIT 228459.htm | NIT 22-12138459.doc | Misc. repair and maintenance of M/W TE building at Mohanpur | 26-06-2012 15:00:00 |
26-06-2012 15:30:00 |
||
| NITNO. 06/2012-13/EE/BSNL/CD-I/CHD Dated:- 16-6-2012 | 06NIT128450.htm | 06NIT128450.pdf | Enhancement of Ferrule and G.I. piper lines of Underground tanks in BSNL colony, Sector 44A, Chandigarh | 25-06-2012 15:00:00 |
25-06-2012 15:30:00 |
||
| 04/EE/BSNL/CD/JL/NIT/2012-13 Dt. 13-06-2012 | NIT048433.htm | TenderDocument048433.doc | Cleaning of under ground/ over heas water storage tanks in BSNL buildings falling under the jurisdiction of BSNL Civil Sub Division Hoshiarpur during the year 2012-13 Phase-I | 21-06-2012 15:00:00 |
21-06-2012 15:30:00 |
||
| 05/EE/BSNL/CD/JL/NIT/2012-13 Dt. 13-06-2012 | NIT058435.htm | TENDERDOCUMENT058435.doc | Cleaning of under ground/ over heas water storage tanks in BSNL buildings falling under the jurisdiction of BSNL Civil Sub Division Jalandhar during the year 2012-13 Phase-I (Local Jalandhar Area). | 21-06-2012 15:00:00 |
21-06-2012 15:30:00 |
||
| 20/2012-13/EE/BSNL/CD/LDH Dated 07.06.2012 | Corrigendum_NIT 208436.doc | Maintenance of Lawn and Care taking of Inspection Quarters at Dugri | 20-06-2012 15:30:00 |
||||
| NIT No.11/EE/BSNL/CD/PTA/2012-2013 Dated: 05.06.2012. | 1213nit11bsnl-68415.htm | 1213nit118415.pdf | Civil Works in Hostel NO:7(Toilet Blocks) SLIET, Longowal, Sangrur(Punjab). | 19-06-2012 15:00:00 |
19-06-2012 15:30:00 |
||
| 03/EE/BSNL/CD/JL/NIT/2012-13 Dt. 11-06-2012 | NIT038429.htm | outerarea8429.doc | Cleaning of under ground / over heas water storage tanks in BSNL buildings falling under the jurisdiction of BSNL Civil Sub Division Jalandhar during the year 2012-13 Phase-I ( | 15-06-2012 15:00:00 |
18-06-2012 15:30:00 |
||
| 03/EE/BSNL/CD/JL/NIT/2012-13 Dated :- 11-06-2012 | NIT038430.htm | APPLICATION038430.doc | Cleaning of under ground / over heas water storage tanks in BSNL buildings falling under the jurisdiction of BSNL Civil Sub Division Jalandhar during the year 2012-13 Phase-I (Outer Jalandhar Area). | 18-06-2012 15:00:00 |
18-06-2012 15:30:00 |
||
| NIT038431.htm | CORRI038431.doc | Cleaning of under ground / over heas water storage tanks in BSNL buildings falling under the jurisdiction of BSNL Civil Sub Division Jalandhar during the year 2012-13 Phase-I ( | 18-06-2012 15:00:00 |
18-06-2012 15:30:00 |
|||
| 03/EE/BSNL/CD/JL/NIT/2012-13 Dt. 11-06-2012 | NIT038446.htm | Corrigendum to NIT038446.doc | Cleaning of under ground / over heas water storage tanks in BSNL buildings falling under the jurisdiction of BSNL Civil Sub Division Jalandhar during the year 2012-13 Phase-I (Outer Jalandhar Area). | 18-06-2012 15:00:00 |
18-06-2012 15:30:00 |
||
| 19/2012-13/EE/BSNL/CD/LDH Dated 07.06.2012 | BSNL W-6 NIT 198422.htm | NIT 19-12138422.doc | Infrastructure for Defence Project (NFS)-- "Civil works for Ascon Node at Muktsar.” | 16-06-2012 15:00:00 |
16-06-2012 15:30:00 |
||
| 20/2012-13/EE/BSNL/CD/LDH Dated 07.06.2012 | BSNL W-6 NIT 208423.htm | NIT 20-12138423.doc | Maintenance of Lawn and Care taking of Inspection Quarters at Dugri | 16-06-2012 15:00:00 |
16-06-2012 15:30:00 |
||
| 21/2012-13/EE/BSNL/CD/LDH Dated 08.06.2012 | BSNL W-6 NIT 218425.htm | NIT 21-12138425.doc | Misc. Repair and Mttce of M/W TE building at Mohanpur | 16-06-2012 15:00:00 |
16-06-2012 15:30:00 |
||
| NIT No.12/EE/BSNL/CD/PTA/2012-2013 Dated: 06.06.2012. | 1213nit12bsnl-68418.htm | 1213nit128418.pdf | Raising of left hand side boundary wall for closing of windows and ventilators of hotel directly opening in T.E. building compound at Nabha. | 15-06-2012 15:00:00 |
15-06-2012 15:30:00 |
||
| NIT No.13/EE/BSNL/CD/PTA/2012-2013 Dated: 07.06.2012. | 1213nit13bsnl-68426.htm | 1213nit138426.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS IN THE JURISDICTION OF DET FATEHGARH, SAMANA, NABHA AND MGG IN PATIALA SSA FOR THE PERIOD FROM JUNE 2012 TO NOV 2012. | 15-06-2012 15:00:00 |
15-06-2012 15:30:00 |
||
| NITNO. 05/2012-13/SDE/BSNL/CSD-V/CHD | 05NIT128411.htm | 05NIT128411.pdf | Construction of Advance Center for Protein Informatics, Science, Engineering and Technology in IMTECH, Sector-39 A, Chandigarh. (SH Providing and placing selected stone/ rock from river bed near Pal | 12-06-2012 15:00:00 |
12-06-2012 15:30:00 |
||
| NIT NO : 06/EE/BSNL/CD/ASR/2012-13 dated:- 28.05.2012 | NIT8390.htm | Tender DET III ASR8390.doc | “Sealing of Manholes of cable duct under DEP City –III, Amritsar” | 07-06-2012 15:00:00 |
07-06-2012 15:30:00 |
||
| 06/EE/BSNL/CD/ASR/2012-13 dated:- 28.05.2012 | NIT8392.htm | Application DET III8392.doc | “Sealing of Manholes of cable duct under DEP City –III, Amritsar” | 07-06-2012 15:00:00 |
07-06-2012 15:30:00 |
||
| NITNO. 04/2012-13/EE/BSNL/CD-I/CHD Dated:- 30-5-2012 | 04NIT128406.htm | 04NIT128406.pdf | Maintenance and Operational jobs in the O/o CE(C), O/o SE(C), O/o EE(Civil)-I, BSNL, Chandigarh for the period 2012-13 | 07-06-2012 15:00:00 |
07-06-2012 15:30:00 |
||
| 06/EE/BSNL/CD-II/CHD/2012-13 dated 24-05-2012 | w68377.htm | 6NIT 12-138377.pdf | Maintenance and care taking of BSNL Inspection Quarter in TE building at Phase-VII industrial area Mohali for the period 01.06.2012 to 31.05.2013. | 06-06-2012 15:00:00 |
06-06-2012 15:30:00 |
||
| NIT No.06/EE/BSNL/CD/PTA/2012-2013 Dated: 24.05.2012. | 1213nit06bsnl-68379.htm | 1213nit068379.pdf | Day to day maintenance to BSNL buildings at Sangrur for the Year 2012-13. | 06-06-2012 15:00:00 |
06-06-2012 15:30:00 |
||
| NIT No.07/EE/BSNL/CD/PTA/2012-2013 Dated: 24.05.2012. | 1213nit07bsnl-68380.htm | 1213nit078380.pdf | Repair to toilet block in T.E. Building at Sangrur | 06-06-2012 15:00:00 |
06-06-2012 15:30:00 |
||
| NIT No.08/EE/BSNL/CD/PTA/2012-2013 Dated: 24.05.2012. | 1213nit088381.htm | 1213nit088381.pdf | Making bore in T.E. Building compound at Dhuri (SANGRUR). | 06-06-2012 15:00:00 |
06-06-2012 15:30:00 |
||
| NITNO. 03/2012-13/EE/BSNL/CD-I/CHD Dated:- 29-5-2012 | 03NIT128395.htm | 03NIT128395.pdf | Construction of 100 rooms hostel with dining facility, guest room, warden office and residence in IMTECH, Chandigarh (SH: P/o Clay Tennis Court) | 06-06-2012 15:00:00 |
06-06-2012 15:30:00 |
||
| NIT No.10/EE/BSNL/CD/PTA/2012-2013 Dated: 30.05.2012. | 1213nit10bsnl-68399.htm | 1213nit108399.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS IN THE JURISDICTION OF DET FATEHGARH SAMANA NABHA and MGG IN PATIALA SSA FOR THE PERIOD FROM JUNE 2012 TO NOV 2012 | 06-06-2012 15:00:00 |
06-06-2012 15:30:00 |
||
| 06/EE/BSNL/CD-II/CHD/2012-13 dated 24-05-2012 | Corrigendum8412.htm | Maintenance and care taking of BSNL Inspection Quarter in TE building at Phase-VII industrial area Mohali for the period 01.06.2012 to 31.05.2013. | 06-06-2012 15:30:00 |
||||
| 15/2012-13/EE/BSNL/CD/LDH Dated 24.05.2012 | Corrigendum_NIT 15 (1)8407.doc | Misc. repair and maintenance of M/W TE Building at Mohanpur | 05-06-2012 15:30:00 |
||||
| 16/2012-13/EE/BSNL/CD/LDH Dated 24.05.2012 | Corrigendum_NIT 16 (1)8408.doc | Raising the cable duct Manhole necks of Cable Chambers lying enroute Cheema Chowk to Jamalpur Chowk via Samrala Chowk under Jurisdiction of DET Transport Nagar Ludhiana | 05-06-2012 15:30:00 |
||||
| 17/2012-13/EE/BSNL/CD/LDH Dated 24.05.2012 | Corrigendum_NIT 17 (1)8409.doc | Raising the cable duct Manhole necks of Cable Chambers lying within in the area from Bharat Nagar to Atam Park chowk adjacent to Bus Stand under Jurisdiction of DET Bharat Nagar Ludhiana | 05-06-2012 15:30:00 |
||||
| NIT No.09/EE/BSNL/CD/PTA/2012-2013 Dated: 28.05.2012 | 1213nit09bsnl-68394.htm | 1213nit098394.pdf | Raising of left hand side boundary wall for closing of windows and ventilators of hotel directly opening in T.E. building compound at Nabha. | 04-06-2012 15:00:00 |
04-06-2012 15:30:00 |
||
| 15/2012-13/EE/BSNL/CD/LDH Dated 24.05.2012 | Corrigendum_NIT 158403.doc | Misc. repair and maintenance of M/W TE Building at Mohanpur | 02-06-2012 15:30:00 |
||||
| 16/2012-13/EE/BSNL/CD/LDH Dated 24.05.2012 | Corrigendum_NIT 168404.doc | Raising the cable duct Manhole necks of Cable Chambers lying enroute Cheema Chowk to Jamalpur Chowk via Samrala Chowk under Jurisdiction of DET Transport Nagar Ludhiana | 02-06-2012 15:30:00 |
||||
| 17/2012-13/EE/BSNL/CD/LDH Dated 24.05.2012 | Corrigendum_NIT 178405.doc | Raising the cable duct Manhole necks of Cable Chambers lying within in the area from Bharat Nagar to Atam Park chowk adjacent to Bus Stand under Jurisdiction of DET Bharat Nagar Ludhiana | 02-06-2012 15:30:00 |
||||
| 15/2012-13/EE/BSNL/CD/LDH Dated 24.05.2012 | BSNL W-6 NIT 158373.htm | NIT 15-12138373.doc | Misc. repair and maintenance of M/W TE Building at Mohanpur | 01-06-2012 15:00:00 |
01-06-2012 15:30:00 |
||
| 16/2012-13/EE/BSNL/CD/LDH Dated 24.05.2012 | BSNL W-6 NIT 168374.htm | NIT 16-12138374.doc | Raising the cable duct Manhole necks of Cable Chambers lying enroute Cheema Chowk to Jamalpur Chowk via Samrala Chowk under Jurisdiction of DET Transport Nagar Ludhiana | 01-06-2012 15:00:00 |
01-06-2012 15:30:00 |
||
| 17/2012-13/EE/BSNL/CD/LDH Dated 24.05.2012 | BSNL W-6 NIT 178375.htm | NIT 17-12138375.doc | Raising the cable duct Manhole necks of Cable Chambers lying within in the area from Bharat Nagar to Atam Park chowk adjacent to Bus Stand under Jurisdiction of DET Bharat Nagar Ludhiana | 01-06-2012 15:00:00 |
01-06-2012 15:30:00 |
||
| NITNO. 02/2012-13/EE/BSNL/CD-I/CHD | corrigendum nit 028376.htm | Maintenance and Care taking of BSNL inspection Quarters in Sector 44-A, Chandigarh for the year 2012-13 | 30-05-2012 15:30:00 |
||||
| 18/2012-13/EE/BSNL/CD/LDH Dated 26.05.2012 | BSNL W-6 NIT 188382.htm | NIT 18-12138382.doc | Cleaning of Septic tank and making of Soak Pit at Sudhar | 30-05-2012 15:00:00 |
30-05-2012 15:30:00 |
||
| NIT No: 01/EE/BSNL/PCD/MHL/2012-13 dated 15-05-12 | web page8338.htm | NIT Animal House8338.pdf | Construction of Animal House at IISER, Mohali, Punjab.” | 29-05-2012 15:00:00 |
29-05-2012 15:30:00 |
||
| NIT No.05/EE/BSNL/CD/PTA/2012-2013 Dated: 18.05.2012. | 1213nit05bsnl-68355.htm | 1213nit058355.pdf | RE-DEVELOPMENT OF THE TUBEWELL IN BSNL QUARTERS SST COMPOUND AT PATIALA | 28-05-2012 15:00:00 |
28-05-2012 15:30:00 |
||
| NITNO. 02/2012-13/EE/BSNL/CD-I/CHD Dated:- 19-5-2012 | 02NIT128359.htm | 02NIT128359.pdf | Maintenance and care taking of BSNL Inspection Quarters in Sector 20C, Chandigarh for the year 2012-13 | 28-05-2012 15:00:00 |
28-05-2012 15:30:00 |
||
| NITNO. 02/2012-13/EE/BSNL/CD-I/CHD Dated:- 19-5-2012 | 02NIT128360.htm | 02NIT12(i)8360.pdf | Maintenance and Care taking of BSNL Inspection Quarters in Sector 43-A, Chandigarh for the year 2012-13 | 28-05-2012 15:00:00 |
28-05-2012 15:30:00 |
||
| NITNO. 02/2012-13/EE/BSNL/CD-I/CHD | 02NIT128361.htm | 02NIT12(ii)8361.pdf | Maintenance and Care taking of BSNL inspection Quarters in Sector 44-A, Chandigarh for the year 2012-13 | 28-05-2012 15:00:00 |
28-05-2012 15:30:00 |
||
| Corr. to NIT No.05/EE/BSNL/CD/PTA/2012-2013 Dated 18.05.2012 | 1213nit05-corr8378.htm | 1213nit05-corr8378.pdf | RE-DEVELOPMENT OF THE TUBEWELL IN BSNL QUARTERS SST COMPOUND AT PATIALA | 28-05-2012 15:00:00 |
28-05-2012 15:30:00 |
||
| 02/EE/BSNL/CD/JL/NIT/2012-13 | NIT028353.htm | Bid Document for Hiring of Vehicle8353.doc | Hiring of vehicle for the O/o Executive Engineer (Civil) BSNL Civil Division Jalandhar for the Year 2012-13 | 24-05-2012 15:00:00 |
24-05-2012 15:30:00 |
||
| 02/EE/BSNL/CD/Jl/NIT/2012-13 | NIT028356.htm | Corrigendum8356.doc | Hiring of vehicle for the O/o executive Engineer (Civil) BSNL Civil Division Jalandhar for the year 2012-13 | 24-05-2012 15:00:00 |
24-05-2012 15:30:00 |
||
| Quotation No.01/EE/BSNL/CD/PTA/12-13 Dated: 22.05.2012 | 1213q1bsnl-68369.htm | Schedule of Quantity Q-18369.pdf | A/R and M/O to BSNL Staff quarters at SST Nagar Patiala (SH: Cleaning of pipes from trapped sand and gravel in SST Nagar compound at Patiala) | 24-05-2012 15:00:00 |
24-05-2012 15:30:00 |
||
| 10/2012-13/EE/BSNL/CD/LDH Dated 16.05.2012 | BSNL W-6 NIT 108342.htm | NIT 10-12138342.doc | Sealing of Cable entry points in Cable Duct Chamber within Jurisdiction area of DET Mata Rani, Telephone Exchange, Ludhiana (RE-CALL) | 23-05-2012 15:00:00 |
23-05-2012 15:30:00 |
||
| 11/2012-13/EE/BSNL/CD/LDH Dated 16.05.2012 | BSNL W-6 NIT 118343.htm | NIT 11-12138343.doc | Maintenance and operational jobs in the O/o The Superintending Engineer (C), Civil Circle, Ludhiana and o/o Sub Divisional Engineer (C ) , Civil Sub Division-II for the year 2012-2013 | 23-05-2012 15:00:00 |
23-05-2012 15:30:00 |
||
| 12/2012-13/EE/BSNL/CD/LDH Dated 16.05.2012 | BSNL W-6 NIT 128344.htm | NIT 12-12138344.doc | Maintenance and operational jobs in the O/o The Executive Engineer (C), Civil Division, Ludhiana and O/o Sub Divisional Engineer (C), Civil Sub Division-I for the year 2012-2013 | 23-05-2012 15:00:00 |
23-05-2012 15:30:00 |
||
| 13/2012-13/EE/BSNL/CD/LDH Dated 16.05.2012 | BSNL W-6 NIT 138345.htm | NIT 13-12138345.doc | Maintenance of Lawn Sanchar Colony Khanna | 23-05-2012 15:00:00 |
23-05-2012 15:30:00 |
||
| 14/2012-13/EE/BSNL/CD/LDH Dated 16.05.2012 | BSNL W-6 NIT 148347.htm | NIT 14-12138347.doc | Maintenance of lawns in Sanchar Colony, BRS Nagar, Ludhiana | 23-05-2012 15:00:00 |
23-05-2012 15:30:00 |
||
| NIT No.04/EE/BSNL/CD/PTA/2012-2013 Dated: 14.05.2012. | 1213nit04bsnl-68346.htm | 1213nit048346.pdf | Dismantling and shifting of 40M NBLW type tower at Shahi Samadhan Patiala to BSNL store under GMT Patiala | 21-05-2012 15:00:00 |
21-05-2012 15:30:00 |
||
| 08/2012-13/EE/BSNL/CD/LDH Dated 08.05.2012 | BSNL W-6 NIT 088265.htm | NIT 08-12138265.doc | Partitioning work of hall no 5 in Central University of Punjab Bathinda (SH: Extension of chemistry lab) | 18-05-2012 15:00:00 |
18-05-2012 15:30:00 |
||
| 09/2012-13/EE/BSNL/CD/LDH Dated 10.05.2012 | BSNL W-6 NIT 098271.htm | NIT 09-12138271.doc | Hiring of 02 Nos. Non Air-conditioned Light Commercial Diesel Car for the O/o The Superintending Engineer (Civil), BSNL Civil Circle, Ludhiana and O/o The Executive Engineer (C), BSNL Civil Division, | 18-05-2012 15:00:00 |
18-05-2012 15:30:00 |
||
| 05/EE/BSNL/CD/ASR/2012-13 dated:- 04.05.2012 | NIT8255.htm | Tender Racks8255.doc | “Provision of Steel Racks for storing the scanned CAF’s at 3rd floor in T.E Building, Albert Road Amritsar” | 14-05-2012 15:00:00 |
14-05-2012 15:30:00 |
||
| NIT8256.htm | APPLICATION STEEL8256.doc | “Provision of Steel Racks for storing the scanned CAF’s at 3rd floor in T.E Building, Albert Road Amritsar” | 14-05-2012 15:00:00 |
14-05-2012 15:30:00 |
|||
| NITNO. 01/2012-13/EE/BSNL/CD-I/CHD Dated:- 03-5-2012 | 01NIT128250.htm | 01NIT128250.pdf | Day to day mtce. and special repairs to BSNL Staff Quarters Sector-27C, Chandigarh during the period 2012-13 | 11-05-2012 15:00:00 |
11-05-2012 15:30:00 |
||
| NITNO. 01/2012-13/EE/BSNL/CD-I/CHD Dated:- 03-5-2012 | 01NIT128251.htm | 01NIT12(i)8251.pdf | Day to day mtce. and special repairs to BSNL Staff Quarters Sector-30A, Chandigarh during the period 2012-13 | 11-05-2012 15:00:00 |
11-05-2012 15:30:00 |
||
| NITNO. 01/2012-13/EE/BSNL/CD-I/CHD Dated:- 03-5-2012 | 01NIT128252.htm | 01NIT12(ii)8252.pdf | Day to day mtce and special repairs to BSNL Admn. And Technical Buildings under the jurisdiction of BSNL Civil Sub Division-I, Chandigarh for the period 2012-2013 | 11-05-2012 15:00:00 |
11-05-2012 15:30:00 |
||
| NITNO. 01/2012-13/EE/BSNL/CD-I/CHD Dated:- 03-5-2012 | 01NIT128253.htm | 01NIT12(iii)8253.pdf | Day to day mtce and special repairs to BSNL Admn. And Technical Buildings under the jurisdiction of BSNL Civil Sub Division-IV, Chandigarh for the period 2012-2013 | 11-05-2012 15:00:00 |
11-05-2012 15:30:00 |
||
| NITNO. 01/2012-13/EE/BSNL/CD-I/CHD Dated:- 03-5-2012 | 01NIT128254.htm | 01NIT12(iv)8254.pdf | Day to day mtce. i/c special repairs to BSNL Staff Quarters Sector-43A, Chandigarh during the period 2012-13. | 11-05-2012 15:00:00 |
11-05-2012 15:30:00 |
||
| NITNO. 01/2012-13/EE/BSNL/CD-I/CHD Dated:- 03-5-2012 | 01NIT128257.htm | 01NIT12(v)8257.pdf | Day to day mtce. i/c special repairs to BSNL Staff Quarters Sector-36A, 36B and 39B, Chandigarh during the period 2012-13. | 11-05-2012 15:00:00 |
11-05-2012 15:30:00 |
||
| NITNO. 01/2012-13/EE/BSNL/CD-I/CHD Dated:- 03-5-2012 | 01NIT128258.htm | 01NIT12(vi)8258.pdf | Day to day mtce. i/c special repairs to BSNL Staff Quarters Sector-44, Chandigarh during the period 2012-13. | 11-05-2012 15:00:00 |
11-05-2012 15:30:00 |
||
| NITNO. 01/2012-13/EE/BSNL/CD-I/CHD Dated:- 03-5-2012 | 01NIT128259.htm | 01NIT12(vii)8259.pdf | Day to day mtce and special repairs to BSNL Admn. And Technical Buildings under the jurisdiction of BSNL Civil Sub Division-III, Chandigarh for the period 2012-2013 | 11-05-2012 15:00:00 |
11-05-2012 15:30:00 |
||
| 01/EE/BSNL/CD/JL/NIT/2012-13 Dt. 04-05-2012 | NIT018260.htm | APPLICATION018260.doc | Provision of cash counter in old CSC in CTO building at Jalandhar. | 10-05-2012 15:00:00 |
10-05-2012 15:30:00 |
||
| 01/EE/BSNL/CD/JL/NIT/2012-13 Dt. 04-05-2012. | NIT018261.htm | TenderDocument018261.doc | Provision of cash counter in old CSC in CTO building at Jalandhar. | 10-05-2012 15:00:00 |
10-05-2012 15:30:00 |
||
| 4 /EE/BSNL/CD-II/CHD/CSD-PKL/2012-13 dated:28-04-2012 | W68235.htm | 4NIT12-138235.pdf | Day to day civil maintenance in the area under the jurisdiction of SDE(C) CSD Panchkula for the period May 2012 to March 2013. | 09-05-2012 15:00:00 |
09-05-2012 15:30:00 |
||
| Corrigendum | corrigendum panchkula8240.htm | Day to day civil maintenance in the area under the jurisdiction of SDE(C) CSD Panchkula for the period May 2012 to March 2013. | 09-05-2012 15:30:00 |
||||
| 07/2012-13/EE/BSNL/CD/LDH Dated 30.04.2012 | BSNL W-6 NIT 078239.htm | NIT 07-12138239.doc | Repair and maintenance to Water supply line and miscellaneous repair to floors of RLU bldg. in BSNL compound at Dholewal Ludhiana | 08-05-2012 15:00:00 |
08-05-2012 15:30:00 |
||
| NIT No. 03/EE/BSNL/CD/PTA/2012-2013 Dated : 27.04.2012 | 1213nit03bsnl-68234.htm | 1213nit038234.pdf | Repair of Type-III quarter at Barnala. | 07-05-2012 15:00:00 |
07-05-2012 15:30:00 |
||
| 05/EE/BSNL/CD-II/CHD/2012-13 Dated: 30.04.2012 | W68238.htm | 5NIT12-138238.pdf | Internal finishing of ground and first floor for area to be rented out to TRAI inTE building Sector-65 Mohali. | 07-05-2012 15:00:00 |
07-05-2012 15:30:00 |
||
| NIT No.02/EE/BSNL/CD/PTA/2012-2013 Dated: 27.04.2012. | 1213nit02bsnl-68230.htm | 1213nit028230.pdf | Provision of kitchen cabinets and multi purpose baskets in single T-V bungalow type quarter in P andT colony 22 no. phatak Patiala. | 05-05-2012 15:00:00 |
05-05-2012 15:30:00 |
||
| NIT No.01/EE/BSNL/CD/PTA/2012-2013 Dated: 20.04.2012. | 1213nit01bsnl68212.htm | 1213nit018212.pdf | Maintenance | 02-05-2012 15:00:00 |
02-05-2012 15:30:00 |
||
| 03/2012-13/EE/BSNL/CD/LDH dated 23.04.2012 | BSNL W-6 NIT 038216.htm | NIT 03-12138216.doc | Sealing of Cable entry points in Cable Duct Chamber within Jurisdiction area of DET Mata Rani, Telephone Exchange, Ludhiana | 01-05-2012 15:00:00 |
01-05-2012 15:30:00 |
||
| 04/2012-13/EE/BSNL/CD/LDH dated | BSNL W-6 NIT 048217.htm | NIT 04-12138217.doc | Provision of Fencing arrangement around Transformer Sub Station Yard and roofing shed for fuel tank in T. E. Compound at Transport Nagar Ludhiana | 01-05-2012 15:00:00 |
01-05-2012 15:30:00 |
||
| 05/2012-13/EE/BSNL/CD/LDH Dated 24.04.2012 | BSNL W-6 NIT 058219.htm | NIT 05-12138219.doc | Hiring of 01 No. Non Air-conditioned Light Commercial Diesel Car for the O/o Executive Engineer (Civil), BSNL Civil Division, Ludhiana for the Year 2012-13 (RE-CALL) | 01-05-2012 15:00:00 |
01-05-2012 15:30:00 |
||
| 06/2012-13/EE/BSNL/CD/LDH Dated 24.04.2012 | BSNL W-6 NIT 068220.htm | NIT 06-12138220.doc | Hiring of 01 No. Non Air-conditioned Light Commercial Diesel Car for the O/o Superintending Engineer (Civil), BSNL Civil Circle, Ludhiana for the Year 2012-13 (RE-CALL) | 01-05-2012 15:00:00 |
01-05-2012 15:30:00 |
||
| 04/EE/BSNL/CD/ASR/2012-13 dated 18.04.2012 | NIT8208.htm | Tender Cleaning tank8208.doc | “ARMO to BSNL Buildings and Staff Quarters in SSA Pathankot during the year 2012-13 (SH:- Cleaning of water storage tanks under jurisdiction of BSNL Civil Sub Division Pathankot) | 30-04-2012 15:00:00 |
30-04-2012 15:30:00 |
||
| NIT8209.htm | Tender Cleaning tank8209.doc | “ARMO to BSNL Buildings and Staff Quarters in SSA Pathankot during the year 2012-13 (SH:- Cleaning of water storage tanks under jurisdiction of BSNL Civil Sub Division Pathankot) | 30-04-2012 15:00:00 |
30-04-2012 15:30:00 |
|||
| NIT8210.htm | APPLICATION8210.doc | “ARMO to BSNL Buildings and Staff Quarters in SSA Pathankot during the year 2012-13 (SH:- Cleaning of water storage tanks under jurisdiction of BSNL Civil Sub Division Pathankot) | 30-04-2012 15:00:00 |
30-04-2012 15:30:00 |
|||
| 03/EE/BSNL/CD/ASR/2012-13 dated:- 16.04.2012 | NIT Ladies8201.htm | Tender Ladies8201.doc | “Conversion of old Power room into Ladies retiring room at ground floor T.E Buildging Compound Albert Road Amritsar” | 24-04-2012 15:00:00 |
24-04-2012 15:30:00 |
||
| 03/EE/BSNL/CD/ASR/2012-13 dated:- 16.04.2012 | NIT Ladies8202.htm | APPLICATIO Ladies8202.doc | “Conversion of old Power room into Ladies retiring room at ground floor T.E Buildging Compound Albert Road Amritsar” | 24-04-2012 15:00:00 |
24-04-2012 15:30:00 |
||
| NIT No.07/EE/BSNL/PCD/MHL/2011-12 Dated 30.03.2012 | Press notice8154.htm | Draft NIT Animal House18154.pdf | CONSTRUCTION OF ANIMAL HOUSE AT IISER, MOHALI,PUNJAB. | 16-04-2012 15:00:00 |
16-04-2012 15:30:00 |
||
| Star price8156.htm | CONSTRUCTION OF ANIMAL HOUSE AT IISER, MOHALI,PUNJAB. | 16-04-2012 15:00:00 |
16-04-2012 15:30:00 |
||||
| 01/EE/BSNL/CD/ASR/2012-13 dated:- 04.04.2012 | NIT ladies8174.htm | Tender Ladies8174.doc | “Conversion of old Power room into Ladies retiring room at ground floor T.E Buildging Compound Albert Road Amritsar” | 16-04-2012 15:00:00 |
16-04-2012 15:30:00 |
||
| 01/EE/BSNL/CD/ASR/2012-13 dated:- 04.04.2012 | NIT ladies8175.htm | APPLICATIO Ladies8175.doc | “Conversion of old Power room into Ladies retiring room at ground floor T.E Buildging Compound Albert Road Amritsar” | 16-04-2012 15:00:00 |
16-04-2012 15:30:00 |
||
| 02/EE/BSNL/CD/ASR/2012-13 dated:- 04.04.2012 | NIT Raising Man8176.htm | Tender Raising Manhole City I,II,III &IV ASR8176.doc | “Rasing of Manholes necks of Cable duct Chamber in Area under DET City-I,II,III & IV at Amritsar” | 16-04-2012 15:00:00 |
16-04-2012 15:30:00 |
||
| NIT Raising Man8177.htm | APPLICATIO Rasing8177.doc | “Rasing of Manholes necks of Cable duct Chamber in Area under DET City-I,II,III & IV at Amritsar” | 16-04-2012 15:00:00 |
16-04-2012 15:30:00 |
|||
| 02/2012-13/EE/BSNL/CD/LDH Dated 07.04.2012 | BSNL W-6 NIT 028185.htm | NIT 02-12138185.doc | Repair of damaged part of cable duct (12 Way ) in front of Vardhman Factory , Samrala Road Ludhiana | 16-04-2012 15:00:00 |
16-04-2012 15:30:00 |
||
| 01/EE/BSNL/CD-II/CHD/2012-13 dated 03-04-2012 | w68165.htm | 1NIT A 2012-138165.pdf | Special repair of Microwave Building at Sector 53 Mohali. | 13-04-2012 15:00:00 |
13-04-2012 15:30:00 |
||
| 01/EE/BSNL/CD-II / CHD/2012-13 Dated: 03-04-2012 | w68167.htm | 1NITA2012-138167.pdf | Special repair of Microwave Building at Sector 53 Mohali. | 13-04-2012 15:00:00 |
13-04-2012 15:30:00 |
||
| 01/EE/BSNL/CD-II / CHD/2012-13 Dated: 03-04-2012 | w68168.htm | 1NITA2012-138168.pdf | Special repair of Microwave Building at Sector 53 Mohali. | 13-04-2012 15:00:00 |
13-04-2012 15:30:00 |
||
| 01/EE/BSNL/CD-II / CHD/2012-13 Dated: 03-04-2012 | w68169.htm | 1NITA2012-138169.pdf | Special repair of Microwave Building at Sector 53 Mohali. | 13-04-2012 15:00:00 |
13-04-2012 15:30:00 |
||
| 01/EE/BSNL/CD-II / CHD/2012-13 Dated: 03-04-2012 | w68170.htm | 1NITA2012-138170.pdf | Special repair of Microwave Building at Sector 53 Mohali. | 13-04-2012 15:00:00 |
13-04-2012 15:30:00 |
||
| 01/EE/BSNL/CD-II / CHD/2012-13 Dated: 03-04-2012 | w68171.htm | 1NITA2012-138171.pdf | Special repair of Microwave Building at Sector 53 Mohali. | 13-04-2012 15:00:00 |
13-04-2012 15:30:00 |
||
| 01/EE/BSNL/CD-II / CHD/2012-13 Dated: 03-04-2012 | w68172.htm | 1NITB 2012-138172.pdf | Day to day maintenance of BSNL TE building at Mohali under jurisdiction of BSNL Civil Division S.A.S. Nagar(Mohali) from 1.4.2012 to 30.9.2012. | 13-04-2012 15:00:00 |
13-04-2012 15:30:00 |
||
| 01/EE/BSNL/CD-II / CHD/2012-13 Dated: 03-04-2012 | w68173.htm | 1NITC2012-138173.pdf | Day to day maintenance of BSNL Staff quarters and inspection quarters at Mohali under jurisdiction of BSNL Civil Division S.A.S. Nagar(Mohali) from 1.4.2012 to 30.9.2012. | 13-04-2012 15:00:00 |
13-04-2012 15:30:00 |
||
| 74/EE/BSNL/CD/ASR/2011-12 dated:- 29.03.2012 | Corrigendum ASR8163.doc | “Day to day Maintenance of BSNL staff quarters in the area under BSNL Civil subdivision,Amritsar (Except SDCA Batala) during the year 2012-2013.” | 12-04-2012 15:30:00 |
||||
| 75/EE/BSNL/CD/ASR/2011-12 dated:- 29.03.2012 | Corrigendum ASR8164.doc | “Day to day Maintenance of BSNL Buildings in the area under BSNL Civil subdivision( except SDCA Batala) during the year 2012-2013. | 12-04-2012 15:30:00 |
||||
| NIT No.30/EE/BSNL/CD/PTA/2011-2012 Dated: 28.03.2012. | 1112bsnl6nit308138.htm | 1112nit308138.pdf | Maintenance of Lawns/Trainee Parks in RTTC Complex at Rajpura from April 2012 to September 2012 | 11-04-2012 15:00:00 |
11-04-2012 15:30:00 |
||
| 01/2012-13/EE/BSNL/CD/LDH Dated 02.04.2012 | BSNL W-6 NIT 018157.htm | NIT 01-12138157.doc | Raising & Leveling of OAN Manholes in Bathinda City | 11-04-2012 15:00:00 |
11-04-2012 15:30:00 |
||
| 2/EE/BSNL/CD-II/ CHD/CHD/ 2012-2013 Dated :- 04.04.2012 | 2nit W68182.htm | 2NIT12-138182.pdf | Hiring of Vihicle for use of Executive Engineer(Civil) BSNL Civil Division-II Chandigarh for the month of April 2012 to January 2013. | 11-04-2012 15:00:00 |
11-04-2012 15:30:00 |
||
| 3/EE/BSNL/CD-II/ CHD/CHD/ 2012-2013 Dated :- 04.04.2012 | 3nit W68183.htm | 3NIT12-138183.pdf | Hiring of Vehicle for use of Superintending Engineer(Civil),BSNLCivil Circle-II Chandigarh for the month of April 2012 to March 2013. | 11-04-2012 15:00:00 |
11-04-2012 15:30:00 |
||
| 69/EE/BSNL/CD/ASR/2011-12 dated:- 26.03.2012 | Corrigendum pkt8161.doc | “Petty works and day to day repairs to BSNL buildings under BSNL Civil Sub Division Pathankot during the year 2012-13 | 09-04-2012 15:30:00 |
||||
| 70/EE/BSNL/CD/ASR/2011-12 dated:- 26.03.2012 | Corrigendum pkt8162.doc | “Petty works and day to day repairs to BSNL Staff Quarters under BSNL Civil Sub Division Pathankot during the year 2012-13 | 09-04-2012 15:30:00 |
||||
| 74/EE/BSNL/CD/ASR/2011-12 dated:- 29.03.2012 | NIT QTRS8140.htm | Tender Qtrs ASR8140.doc | Day to day Maintenance of BSNL staff quarters in the area under BSNL Civil subdivision,Amritsar (Except SDCA Batala) during the year 2012-2013.” | 07-04-2012 15:00:00 |
07-04-2012 15:30:00 |
||
| 74/EE/BSNL/CD/ASR/2011-12 dated:- 29.03.2012 | NIT QTRS8141.htm | Tender Qtrs ASR8141.doc | “Day to day Maintenance of BSNL staff quarters in the area under BSNL Civil subdivision,Amritsar (Except SDCA Batala) during the year 2012-2013.” | 07-04-2012 15:00:00 |
07-04-2012 15:30:00 |
||
| 73/EE/BSNL/CD/ASR/2011-12 dated 29.03.2012 | NIT Horti8142.htm | Tender Horti1 doc8142.doc | “Horticulture works and upkeeping of lawns/Plants in T.E Building Compound Pathankot and Gurdaspur during the Year 2012-13(April2012 to September 2012) | 07-04-2012 15:00:00 |
07-04-2012 15:30:00 |
||
| 75/EE/BSNL/CD/ASR/2011-12 dated:- 29.03.2012 | NIT Buildg8143.htm | Tender Buildg ASR8143.doc | “Day to day Maintenance of BSNL Buildings in the area under BSNL Civil subdivision( except SDCA Batala) during the year 2012-2013. | 07-04-2012 15:00:00 |
07-04-2012 15:30:00 |
||
| 73/EE/BSNL/CD/ASR/2011-12 dated 29.03.2012 | NIT Horti8144.htm | APPLICATION Horti8144.doc | “Horticulture works and upkeeping of lawns/Plants in T.E Building Compound Pathankot and Gurdaspur during the Year 2012-13(April2012 to September 2012) | 07-04-2012 15:00:00 |
07-04-2012 15:30:00 |
||
| 75/EE/BSNL/CD/ASR/2011-12 dated:- 29.03.2012 | NIT Buildg8146.htm | APPLICATION Bldg8146.doc | “Day to day Maintenance of BSNL Buildings in the area under BSNL Civil subdivision( except SDCA Batala) during the year 2012-2013. | 07-04-2012 15:00:00 |
07-04-2012 15:30:00 |
||
| 74/EE/BSNL/CD/ASR/2011-12 dated:- 29.03.2012 | NIT QTRS8147.htm | APPLICATIO Qtr8147.doc | “Day to day Maintenance of BSNL staff quarters in the area under BSNL Civil subdivision,Amritsar (Except SDCA Batala) during the year 2012-2013.” | 07-04-2012 15:00:00 |
07-04-2012 15:30:00 |
||
| 72/EE/BSNL/CD/ASR/2011-12 dated 27.03.2012 | NIT Oper8134.htm | Tender Operational8134.doc | “Maintenance & Operational Jobs in O/o the SDE© Pathankot during the year 2012-13(April 2012 to September 2012) | 04-04-2012 15:00:00 |
04-04-2012 15:30:00 |
||
| NIT Oper8135.htm | APPLICATIO Oper8135.doc | Maintenance & Operational Jobs in O/o the SDE© Pathankot during the year 2012-13(April 2012 to September 2012) | 04-04-2012 15:00:00 |
04-04-2012 15:30:00 |
|||
| 92/2011-12/EE/BSNL/CD/LDH Dated 28.03.2012 | BSNL W-6 NIT 928137.htm | NIT 92-11128137.doc | A/R & M/O to re-allotted staff quarters in Sanchar Colony, BRS Nagar Ludhiana (RE-CALL) | 04-04-2012 15:00:00 |
04-04-2012 15:30:00 |
||
| 69/EE/BSNL/CD/ASR/2011-12 dated:- 26.03.2012 | NIT Buildg8126.htm | Tender BUILD Pkt doc8126.doc | “Petty works and day to day repairs to BSNL buildings under BSNL Civil Sub Division Pathankot during the year 2012-13 | 03-04-2012 15:00:00 |
03-04-2012 15:30:00 |
||
| 69/EE/BSNL/CD/ASR/2011-12 dated:- 26.03.2012 | NIT Buildg8127.htm | APPLICATION Buil Pkt8127.doc | “Petty works and day to day repairs to BSNL buildings under BSNL Civil Sub Division Pathankot during the year 2012-13 | 03-04-2012 15:00:00 |
03-04-2012 15:30:00 |
||
| 70/EE/BSNL/CD/ASR/2011-12 dated:- 26.03.2012 | NIT Qtr8128.htm | Tender Qtr Pkt8128.doc | “Petty works and day to day repairs to BSNL Staff Quarters under BSNL Civil Sub Division Pathankot during the year 2012-13 | 03-04-2012 15:00:00 |
03-04-2012 15:30:00 |
||
| NIT Qtr8129.htm | APPLICATION Qtr Pkt8129.doc | “Petty works and day to day repairs to BSNL Staff Quarters under BSNL Civil Sub Division Pathankot during the year 2012-13 | 03-04-2012 15:00:00 |
03-04-2012 15:30:00 |
|||
| 71/EE/BSNL/CD/ASR/2011-12 dated:- 26.03.2012 | NIT8130.htm | TenderDEP-I8130.doc | “Raising the level in Front of O/o DEP(City-I), Amritsar ” | 03-04-2012 15:00:00 |
03-04-2012 15:30:00 |
||
| NIT8131.htm | APPLICATIO18131.doc | “Raising the level in Front of O/o DEP(City-I), Amritsar ” | 03-04-2012 15:00:00 |
03-04-2012 15:30:00 |
|||
| 90/2011-12/EE/BSNL/CD/LDH Dated 23.03.2012 | BSNL W-6 NIT 908113.htm | NIT 90-11128113.doc | Raising of cable duct manhole necks of cable chambers falling under jurisdiction of DET, Mata Rani Chowk, T. E. Ludhiana | 02-04-2012 15:00:00 |
02-04-2012 15:30:00 |
||
| 91/2011-12/EE/BSNL/CD/LDH Dated 23.03.2012 | BSNL W-6 NIT 918114.htm | NIT 91-11128114.doc | Sealing of Cable entry points in Cable Duct Chambers within Jurisdiction area of DET (M / W) Ludhiana | 02-04-2012 15:00:00 |
02-04-2012 15:30:00 |
||
| 67/EE/BSNL/CD/ASR/2011-12 dated 24.03.2012 | NIT Sealing8120.htm | Tender Sealing8120.doc | “Sealing of existing uncovered A.C. duct in the Ground floor corridor of T.E. building at Katra Sher Singh (Amritsar). | 02-04-2012 15:00:00 |
02-04-2012 15:30:00 |
||
| NIT Sealing8121.htm | Tender Sealing8121.doc | “Sealing of existing uncovered A.C. duct in the Ground floor corridor of T.E. building at Katra Sher Singh (Amritsar). | 02-04-2012 15:00:00 |
02-04-2012 15:30:00 |
|||
| 67/EE/BSNL/CD/ASR/2011-12 dated 24.03.2012 | NIT Sealing8122.htm | Tender Sealing8122.doc | “Sealing of existing uncovered A.C. duct in the Ground floor corridor of T.E. building at Katra Sher Singh (Amritsar). | 02-04-2012 15:00:00 |
02-04-2012 15:30:00 |
||
| NIT Sealing8123.htm | APPLICATION Sealing8123.doc | Sealing of existing uncovered A.C. duct in the Ground floor corridor of T.E. building at Katra Sher Singh (Amritsar). | 02-04-2012 15:00:00 |
02-04-2012 15:30:00 |
|||
| 68/EE/BSNL/CD/ASR/2011-12 dated 24.03.2012 | NIT Cleaning8124.htm | Tender Cleaning tank batala8124.doc | “ARMO to BSNL Buildings and staff Quarters in SSA Pathankot during the year 2012-13. (SH: Cleaning of water storage tanks under SDCA Batala). | 02-04-2012 15:00:00 |
02-04-2012 15:30:00 |
||
| 68/EE/BSNL/CD/ASR/2011-12 dated 24.03.2012 | NIT Cleaning8125.htm | APPLICATION Cleaning8125.doc | “ARMO to BSNL Buildings and staff Quarters in SSA Pathankot during the year 2012-13. (SH: Cleaning of water storage tanks under SDCA Batala). | 02-04-2012 15:00:00 |
02-04-2012 15:30:00 |
||
| NIT No: 27/2011-12/EE/BSNL/CD-I/CHD Dated 21-3-2012. | 27NIT118082.htm | 27NIT118082.pdf | HIRING OF VEHICLES FOR O/O CHIEF ENGINEER(C) AND SUPERINTENDING ENGINEER(C)-I, BSNL, CHANDIGARH | 30-03-2012 15:00:00 |
30-03-2012 15:30:00 |
||
| 41/EE/BSNL/CD/JL/NIT/2011-12 Dt.23.03.2012 | NIT418109.htm | TENDERDOCUMENT41.doc.8109docx | Repair and maintenance operations in inspection quarter in CTO compound at Jalandhar. | 30-03-2012 15:00:00 |
30-03-2012 15:30:00 |
||
| NIT418110.htm | TENDERDOCUMENT41.doc.8110docx | Repair and maintenance operations in inspection quarter in CTO compound at Jalandhar. | 30-03-2012 15:00:00 |
30-03-2012 15:30:00 |
|||
| NIT418111.htm | TENDERDOCUMENT41.doc.8111docx | Repair and maintenance operations in inspection quarter in CTO compound at Jalandhar. | 30-03-2012 15:00:00 |
30-03-2012 15:30:00 |
|||
| NIT418112.htm | APPLICATION41.doc.8112docx | Repair and maintenance operations in inspection quarter in CTO compound at Jalandhar. | 30-03-2012 15:00:00 |
30-03-2012 15:30:00 |
|||
| 42/EE/BSNL/CD/JL/NIT/2011-12 Dt.23.03.2012 | NIT428116.htm | TENDERDOCUMENT42.doc.8116docx | Supply of (3+1)x7 TR Micro Processor controlled AC package units with air cooled condenser for ground floor (top discharge) in CTO building Jalandhar (SH: Aluminium Partition). | 30-03-2012 15:00:00 |
30-03-2012 15:30:00 |
||
| NIT428117.htm | APPLICATION42.doc.8117docx | Supply of (3+1)x7 TR Micro Processor controlled AC package units with air cooled condenser for ground floor (top discharge) in CTO building Jalandhar (SH: Aluminium Partition). | 30-03-2012 15:00:00 |
30-03-2012 15:30:00 |
|||
| 41/EE/BSNL/CD/JL/NIT/2011-12 Dt.23.03.2012 | Corrigendum8148.htm | Corrigendum8148.doc | Repair and maintenance operations in inspection quarter in CTO compound at Jalandhar. | 30-03-2012 15:00:00 |
30-03-2012 15:30:00 |
||
| 42/EE/BSNL/CD/JL/NIT/2011-12 Dt.23.03.2012 | Corrigendum8149.htm | Corrigendum8149.doc | Supply of (3+1)x7 TR Micro Processor controlled AC package units with air cooled condenser for ground floor (top discharge) in CTO building Jalandhar (SH: Aluminium Partition). | 30-03-2012 15:00:00 |
30-03-2012 15:30:00 |
||
| NIT No.29/EE/BSNL/CD/PTA/2011-2012 dated 15.03.2012 | BSNL61112nit298056.htm | 1112nit298056.pdf | Hiring of Vehicle for use of Executive Engineer(Civil), BSNL Civil Division, Patiala for the month of April, 2012 to February ,2013. | 28-03-2012 15:00:00 |
28-03-2012 15:30:00 |
||
| 86/2011-12/EE/BSNL/CD/LDH Dated 16.03.2012 | Corrigendum_NIT 868085.doc | A/R & M/O to re-allotted staff quarters in Sanchar Colony, BRS Nagar Ludhiana | 26-03-2012 15:30:00 |
||||
| 65/EE/BSNL/CD/ASR/2011-12 dated 15.03.2012 | NIT Operational8059.htm | Tender Docu Operational Jobs8059.doc | “A/R & M/O to BSNL Buildings and Staff Quarters at SSA Amritsar during year 2011.(SH: Maintenance & operational jobs in O/o the EE(C) & SDE (C)-PH-III, Amritsar). | 23-03-2012 15:00:00 |
23-03-2012 15:30:00 |
||
| APPLICATIO Oper Job8060.doc | “A/R & M/O to BSNL Buildings and Staff Quarters at SSA Amritsar during year 2011.(SH: Maintenance & operational jobs in O/o the EE(C) & SDE (C)-PH-III, Amritsar). | 23-03-2012 15:00:00 |
23-03-2012 15:30:00 |
||||
| 66/EE/BSNL/CD/ASR/2011-12 dated 15.03.2012 | NIT Clean8061.htm | Tender Cleaning Tank8061.doc | “Cleaning of Water storage tanks during the year 2012-13 (Ph-1) for area under BSNL Civil Subdivision, Amritsar. | 23-03-2012 15:00:00 |
23-03-2012 15:30:00 |
||
| APPLICATION Cleaning Tank8062.doc | “Cleaning of Water storage tanks during the year 2012-13 (Ph-1) for area under BSNL Civil Subdivision, Amritsar. | 23-03-2012 15:00:00 |
23-03-2012 15:30:00 |
||||
| 84/2011-12/EE/BSNL/CD/LDH Dated 16.03.2012 | BSNLW-6-NIT 848064.htm | NIT 84-11128064.doc | Hiring of 01 No. Non Air-conditioned Light Commercial Diesel Car for the O/o Executive Engineer (Civil), BSNL Civil Division, Ludhiana for the Year 2012-13 | 23-03-2012 15:00:00 |
23-03-2012 15:30:00 |
||
| 85/2011-12/EE/BSNL/CD/LDH Dated 16.03.2012 | BSNLW-6-NIT 858065.htm | NIT 85-11128065.doc | Hiring of 01 No. Non Air-conditioned Light Commercial Diesel Car for the O/o Superintending Engineer (Civil), BSNL Civil Circle, Ludhiana for the Year 2012-13 | 23-03-2012 15:00:00 |
23-03-2012 15:30:00 |
||
| 86/2011-12/EE/BSNL/CD/LDH Dated 16.03.2012 | BSNL W-6 NIT 868066.htm | NIT 86-11128066.doc | A/R & M/O to re-allotted staff quarters in Sanchar Colony, BRS Nagar Ludhiana | 23-03-2012 15:00:00 |
23-03-2012 15:30:00 |
||
| 87/2011-12/EE/BSNL/CD/LDH Dated 16.03.2012 | BSNL W-6 NIT 878067.htm | NIT 87-11128067.doc | A/R & M/O to BSNL Buildings in Bathinda SSA for the year 2011 12 (SH: Raising of Main Gate and Provision of Ramp at TE Building Compound Budhlada) | 23-03-2012 15:00:00 |
23-03-2012 15:30:00 |
||
| 88/2011-12/EE/BSNL/CD/LDH Dated 16.03.2012 | BSNL W-6 NIT 888068.htm | NIT 88-11128068.doc | Raising of cable duct manhole necks of cable chambers falling under jurisdiction of DET, Mata Rani Chowk, T. E. Ludhiana | 23-03-2012 15:00:00 |
23-03-2012 15:30:00 |
||
| 89/2011-12/EE/BSNL/CD/LDG Dated 16.03.2012 | BSNL W-6 NIT 898069.htm | NIT 89-11128069.doc | Sealing of Cable entry points in Cable Duct Chambers within Jurisdiction area of DET (M / W) Ludhiana | 23-03-2012 15:00:00 |
23-03-2012 15:30:00 |
||
| 88/2011-12/EE/BSNL/CD/LDH Dated 16.03.2012 | Corrigendum_NIT 888070.doc | Raising of cable duct manhole necks of cable chambers falling under jurisdiction of DET, Mata Rani Chowk, T. E. Ludhiana | 23-03-2012 15:30:00 |
||||
| 89/2011-12/EE/BSNL/CD/LDG Dated 16.03.2012 | Corrigendum_NIT 898071.doc | Sealing of Cable entry points in Cable Duct Chambers within Jurisdiction area of DET (M / W) Ludhiana | 23-03-2012 15:30:00 |
||||
| 83/2011-12/EE/BSNL/CD/LDH Dated 15.03.2012 | BSNL W-6 NIT 838057.htm | NIT 83-11128057.doc | Repair and Maintenance to Inspection quarter & GM Residence in Quarter No-1 in BSNL Compound at Dugri | 22-03-2012 15:00:00 |
22-03-2012 15:30:00 |
||
| 80/2011-12/EE/BSNL/CD/LDH Dated 13-03-2012 | BSNL W-6 NIT 808049.htm | NIT 80-11128049.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to Day Maintenance of TE Buildings under CSD-I, Ludhiana) (3rd Call) | 20-03-2012 15:00:00 |
20-03-2012 15:30:00 |
||
| 81/2011-12/EE/BSNL/CD/LDH Dated 13-03-2012 | BSNL W-6 NIT 818050.htm | NIT 81-11128050.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to Day Maintenance of Staff Quarter under CSD-I, Ludhiana) (3rd Call) | 20-03-2012 15:00:00 |
20-03-2012 15:30:00 |
||
| 82/2011-12/EE/BSNL/CD/LDH Dated 13-03-2012 | BSNL W-6 NIT 828053.htm | NIT 82-11128053.doc | Repair of False ceiling and allied miscellaneous civil works in C. S. C. of P & T compound of BSNL, G.T. Road Khanna | 20-03-2012 15:00:00 |
20-03-2012 15:30:00 |
||
| NIT No.28/EE/BSNL/CD/PTA/2011-12 Dated 07.03.2012 | 1112nit28BSNL68028.htm | 1112nit288028.pdf | Repair/Raising of three nos. cable duct manhole necks in SST Nagar Patiala. | 15-03-2012 15:00:00 |
15-03-2012 15:30:00 |
||
| Quotation No.06/EE/BSNL/CD/PTA/2011-12 dated 12.03.2012 | Q-68048.htm | Schedule of Quantity Q-68048.pdf | A/R & M/O to BSNL Staff quarters Nabha (SH: Cleaning of septic tank, disposal ofwaste water from septic tank & re-routing & re-placement of water supply pipe line) | 15-03-2012 15:00:00 |
15-03-2012 15:30:00 |
||
| NIT No.25/EE/BSNL/CD/PTA/2011-12 Dated 28.02.2012 | BSNL-6-1112nit257998.htm | 1112nit257998.pdf | Construction of Back Bone Node T3 Building NFS project at Sangrur | 14-03-2012 15:00:00 |
14-03-2012 15:30:00 |
||
| 26/EE/BSNL/CD/PTA/2011-12 Dated 01.03.2012 | BSNL61112nit268004.htm | 1112nit268004.pdf | Special Repair to balcony railings/fins, staircase ralings window chajjas & other minor repair to RCC memebers i/c provision of new M.S. railing of balconiesin old BSNL S/Qtrs in P& T colony in 22 No | 13-03-2012 15:00:00 |
13-03-2012 15:30:00 |
||
| Notice Inviting Quotation | 34 horticulture quotation8032.htm | 34 horticulture quotation8032.pdf | Maintenance of horticulture works in the compound of administrative Block Sector-34, Chandigarh for the month of March 2012 | 12-03-2012 15:00:00 |
12-03-2012 15:30:00 |
||
| Notice Inviting Quotation | 34 horticulture quotation8036.htm | 34 horticulture quotation8036.pdf | Maintenance of horticulture works in the compound of administrative Block Sector-34, Chandigarh for the month of March 2012 | 12-03-2012 15:00:00 |
12-03-2012 15:30:00 |
||
| 39/EE/BSNL/CD/JL/NIT/2011-12 Dt.02.03.2012 | NIT398007.htm | APPLICATION39.doc.8007docx | Special repairs to damaged Compound Wall at Rurka Kalan (2nd Call). | 09-03-2012 15:00:00 |
09-03-2012 15:30:00 |
||
| TENDERDOCUMENT39.doc.8008docx | Special repairs to damaged Compound Wall at Rurka Kalan (2nd Call). | 09-03-2012 15:00:00 |
09-03-2012 15:30:00 |
||||
| NIT No.27/EE/BSNL/CD/PTA/2011-2012 dated 02.03.2012 | BSNL-61112nit278010.htm | 1112nit278010.pdf | Reconstruction/ Repair of Damaged OAN Chamber, Patiala Gate Sangrur. | 09-03-2012 15:00:00 |
09-03-2012 15:30:00 |
||
| 40/EE/BSNL/CD/JL/NIT/2011-12 Dt.02.03.2012 | NIT408012.htm | APPLICATION40.doc.8012docx | Repairing of opening of lift well for installation of new lift at MTS Nagar Jalandhar. | 09-03-2012 15:00:00 |
09-03-2012 15:30:00 |
||
| TENDERDOCUMENT40.doc.8013docx | Repairing of opening of lift well for installation of new lift at MTS Nagar Jalandhar. | 09-03-2012 15:00:00 |
09-03-2012 15:30:00 |
||||
| Corrigendum to NIT No. 27/EE/BSNL/CD/PTA/2011-12 dated 03.03.2012 | corrigendum1112nit278018.htm | corrigendum1112nit278018.pdf | Reconstruction/ Repair of Damaged OAN Chamber, Patiala Gate Sangrur | 09-03-2012 15:00:00 |
09-03-2012 15:30:00 |
||
| NIT No: 26/2011-12/EE/BSNL/CD-I/CHD Dated 28-2-2012 | 26NIT118000.htm | 26NIT118000.pdf | Hiring of 1 No. of Non Air Conditioned Tata Indica/Vista or Indigo Cars for 1600 Kms. Per month | 07-03-2012 15:00:00 |
07-03-2012 15:30:00 |
||
| Quatation No.05/EE/BSNL/CD/PTA/2011-12 dated 02.03.2012. | 1112Q58011.htm | schedule of quantity1112Q58011.pdf | Purchase of one computer with peripherals for use in BSNL Civil Sub Division, Sangrur. | 06-03-2012 15:00:00 |
06-03-2012 15:30:00 |
||
| Corrigendum to NIT No.27/EE/BSNL/CD/PTA/2011-12 dated 03.03.2012 | corrigendum1112nit278017.htm | corrigendum1112nit278017.pdf | Reconstruction/ Repair of Damaged OAN Chamber, Patiala Gate Sangrur | 06-03-2012 15:00:00 |
06-03-2012 15:30:00 |
||
| Notice Inviting Quotation | swimming pool quotation8016.htm | swimming pool quotation8016.pdf | “Construction of swimming pool including health centre at NIPER SAS Nagar Mohali. (Sh: Testing of swimming pool ) | 05-03-2012 15:00:00 |
05-03-2012 15:30:00 |
||
| 77/2011-12/EE/BSNL/CD/LDH Dated 14-02-2012 | BSNL W-6 NIT 777944.htm | NIT 77-11127944.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to Day Maintenance of TE Buildings under CSD-I, Ludhiana) | 28-02-2012 15:00:00 |
28-02-2012 15:30:00 |
||
| 78/2011-12/EE/BSNL/CD/LDH Dated 14-02-2012 | BSNL W-6 NIT 787945.htm | NIT 78-11127945.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to Day Maintenance of Staff Quarter under CSD-I, Ludhiana) | 28-02-2012 15:00:00 |
28-02-2012 15:30:00 |
||
| NIT No. : 33 / EE/BSNL/CD-II/Chd/csd/mhl/2011-12 Dated : 18.02.2012. | w67964.htm | Copy of nit sector 70 qtr7964.pdf | Repair,painting and white washing of One No type-V staff quarter at 2nd floor Sector-70 Mohali. | 27-02-2012 15:00:00 |
27-02-2012 15:30:00 |
||
| NIT No. 25/2011-12/EE/BSNL/CD-I/CHD/ Dated: 15-2-2012 | 25NIT117959.htm | 25NIT117959.pdf | Construction of 100 rooms hostel with dining facility, guest room, warden office & residence in IMTECH, Chandigarh (SH: Construction of security room, vertical blinds & other misc. works) | 23-02-2012 15:00:00 |
23-02-2012 15:30:00 |
||
| Notice Inviting Quotation | Hostel inauguration IMTECH7980.htm | Hostel Inaugruation quotation7980.pdf | Construction of 100 rooms hostel with dining facility, guest room, warden office & residence in IMTECH, Chandigarh. (SH : Provision of Inauguration plate)” | 23-02-2012 11:00:00 |
23-02-2012 11:30:00 |
||
| Hostel inauguration IMTECH7981.htm | Hostel Inaugruation quotation7981.pdf | Construction of 100 rooms hostel with dining facility, guest room, warden office & residence in IMTECH, Chandigarh. (SH : Provision of Inauguration plate)” | 23-02-2012 11:00:00 |
23-02-2012 11:30:00 |
|||
| NIT No.24/EE/BSNL/CD/PTA/2011-12 dated : 13.02.2012 | BSNL-6nit247941.htm | 1112nit247941.pdf | Repair/Raising of three nos. cable duct manhole necks in SST Nagar Patiala. | 21-02-2012 15:00:00 |
21-02-2012 15:30:00 |
||
| 79/2011-12/EE/BSNL/CD/LDH Dated 15.02.2012 | BSNL W-6 NIT 797946.htm | NIT 79-11127946.doc | Provision of Aluminium partition in OFC Mtce. Room at First floor of T.E. bldg. Samadhi Road at Khanna | 21-02-2012 15:00:00 |
21-02-2012 15:30:00 |
||
| Corrigendum | Corrigendium NIT 797949.doc | Provision of Aluminium partition in OFC Mtce. Room at First floor of T.E. bldg. Samadhi Road at Khanna | 21-02-2012 15:30:00 |
||||
| NIT No: 24/2011-12/EE/BSNL/CD-I/CHD Dated 10-2-2012 | 24NIT117933.htm | 24NIT117933.pdf | Hiring of 1 No. of Non Air Conditioned Tata Indica/Vista or Indigo Cars for 1600 Kms. Per month | 18-02-2012 15:00:00 |
18-02-2012 15:30:00 |
||
| 74/2011-12/EE/BSNL/CD/LDH Dated 03-02-2012 | BSNL W-6 NIT 747912.htm | NIT 74-11127912.doc | Infrastructure for Defence Project (NFS) - “Civil works for Access Node at Fazilka.” | 17-02-2012 15:00:00 |
17-02-2012 15:30:00 |
||
| 06/EE/BSNL/PCD/MHL/2011-2012 | vehicalmoh7925.htm | Vehicle Mohali NIT7925.doc | Hiring of Vehicle for use of Executive Engineer(Civil), BSNL Project Civil Division, Mohali from the month of March 2012 to January 2013(Except the month of September 2012) for net 10 months only. | 17-02-2012 15:00:00 |
17-02-2012 15:30:00 |
||
| NIT No. 23/ EE/BSNL/CD-I/CHD/2011-2012 Dated: 7-2-2012 | 23NIT117922.htm | 23NIT117922.pdf | Construction of Advance Center for Protein Informatics, Science, Engineering and Technology in IMTECH, Sector-39 A, Chandigarh ( SH : Aluminium work, curtain wall & other Misc. works). | 15-02-2012 15:00:00 |
15-02-2012 15:30:00 |
||
| 75/2011-12/EE/BSNL/CD/LDH Dated 08.02.2012 | BSNL W-6 NIT 757926.htm | NIT 75-11127926.doc | A/R & M/O to BSNL Building in Ferozepur SSA for the year 2011-12 (SH: Maintenance of Horticulture works in RSU building & Dusshera Ground at Moga). | 15-02-2012 15:00:00 |
15-02-2012 15:30:00 |
||
| 76/2011-12/EE/BSNL/CD/LDH Dated 08.02.2012 | BSNL W-6 NIT 767927.htm | NIT 76-11127927.doc | A/R & M/O to BSNL Building in Ferozepur SSA for the year 2011-12 (SH: Maintenance and operational Jobs in the O/o BSNL Civil Sub Division, Moga) | 15-02-2012 15:00:00 |
15-02-2012 15:30:00 |
||
| NIT No. 23/ EE/BSNL/CD-I/CHD/2011-2012 Dated: 7-2-2012 | 23NIT117928.htm | 23NIT117928.pdf | Construction of Advance Center for Protein Informatics, Science, Engineering and Technology in IMTECH, Sector-39 A, Chandigarh ( SH : Aluminium work, curtain wall & other Misc. works). | 15-02-2012 15:00:00 |
15-02-2012 15:30:00 |
||
| NIT No.23/EE/BSNL/CD/PTA/2011-12 dated 03.02.2012 | BSNL-6nit237909.htm | 1112nit237909.pdf | Repair to water supply in T.E Compound at Malerkotla (Sangrur). | 13-02-2012 15:00:00 |
13-02-2012 15:30:00 |
||
| 63/EE/BSNL/CD/ASR/11-12 dated: 24.01.2012 | Corrigendum Kasha7889.htm | Corrigendum Kasha7889.doc | ” Infrastructure for Defence Project (NFS) - “Civil works for Backbone Node T-3 at Khasa Distt. Amritsar.” ” Infrastructure for Defence Project (NFS) - “Ci | 09-02-2012 15:00:00 |
09-02-2012 15:30:00 |
||
| 64/EE/BSNL/CD/ASR/2011-12 dated 02.02.2012 | NIT7907.htm | Tender MARR MAST Verka7907.doc | “Construction of foundation & erection of 9.00 metre high Three legged MARR MAST roof top tower at Global Institute of management near Verka (Distt. Amritsar) | 09-02-2012 15:00:00 |
09-02-2012 15:30:00 |
||
| APPLICATIO17908.doc | “Construction of foundation & erection of 9.00 metre high Three legged MARR MAST roof top tower at Global Institute of management near Verka (Distt. Amritsar) | 09-02-2012 15:00:00 |
09-02-2012 15:30:00 |
||||
| 32/EE/BSNL/CD-II/CHD/2011-12 dated: 01.02.2012 | w67901.htm | 32NIT2011-127901.pdf | Provision of work station at GF in admn cum TE building at Sector-20,Panchkula. | 08-02-2012 15:00:00 |
08-02-2012 15:30:00 |
||
| 63 /EE/BSNL/CD/ASR/11-12 Dated:-24.01.2012 | NIT7886.htm | NIT Access Node-Khasa7886.doc | Infrastructure for Defence Project (NFS) - “Civil works for Backbone Node T-3 at Khasa Distt. Amritsar.” | 07-02-2012 15:00:00 |
07-02-2012 15:30:00 |
||
| 63 /EE/BSNL/CD/ASR/11-12 Dated:-24.01.2012 | APPLICATION7887.doc | Infrastructure for Defence Project (NFS) - “Civil works for Backbone Node T-3 at Khasa Distt. Amritsar.” | 07-02-2012 15:00:00 |
07-02-2012 15:30:00 |
|||
| NIT No.22/EE/BSNL/CD/PTA/2011-12 dated 20.01.2012 | BSNL-6nit227881.htm | 1112nit227881.pdf | Repair to water supply in T.E Compound at Malerkotla (Sangrur). | 02-02-2012 15:00:00 |
02-02-2012 15:30:00 |
||
| EXPRESSION OF INTEREST NO. 22/2011-2012/EE/BSNL/CD-I/CHD/ dated 16-1-2012 | 22NIT117863.htm | 22NIT117863.pdf | Expression of Interest for EMPANELMENT OF CONTRACTORS / FIRMS FOR EXTERNAL PROJECTS IN BSNL. | 31-01-2012 15:00:00 |
31-01-2012 15:30:00 |
||
| 62/EE/BSNL/CD/ASR/2011-12 dated 19.01.2012 | NIT7874.htm | Tender Doc Gagobua7874.doc | “Repairs to roof of rented T.E Building at Gagobua | 31-01-2012 15:00:00 |
31-01-2012 15:30:00 |
||
| APPLICATION Gagobua7875.doc | “Repairs to roof of rented T.E Building at Gagobua | 31-01-2012 15:00:00 |
31-01-2012 15:30:00 |
||||
| 21/EE/BSNL/CD/PTA/2011-12 dated 16.01.2012 | BSNL6nit217864.htm | 1112nit217864.pdf | Repair of Bathrooms at Admn. Block & Telephone Exchange building at Sangrur. | 27-01-2012 15:00:00 |
27-01-2012 15:30:00 |
||
| Quotation No.02/EE/BSNL/PCD/MHL/2011-12 Dated: 19 .01.2012. | NIQ7876.htm | Schedule of quantities7876.pdf | supply of Testing Equipment for use of SDE(Civil), BSNL Project Civil Sub-Division-II, Mohali. | 24-01-2012 15:00:00 |
24-01-2012 15:30:00 |
||
| Notice Inviting Quotation | QuotInaugplate7873.htm | InaugquotProtein7873.pdf | Construction of Advance Center for Protein Informatics, Science, Engineering and Technology in IMTECH, Sector-39 A, Chandigarh. (SH : Inauguration plate)”. | 21-01-2012 15:00:00 |
21-01-2012 15:30:00 |
||
| NIT No. 21/2011-12/EE/BSNL/CD-I/CHD/ Dated: 11-1-2012 | 21NIT117856.htm | 21NIT117856.pdf | Provision of floor tiles in Quarter No. 428, Sector 30A, Chandigarh” | 19-01-2012 15:00:00 |
19-01-2012 15:30:00 |
||
| 38/EE/BSNL/CD/JL/NIT/2011-12 Dt.11.01.2012 | NIT387854.htm | TENDERDOCUMENT38.doc.7854docx | Special repairs to damaged Compound Wall at Rurka Kalan. | 18-01-2012 15:00:00 |
18-01-2012 15:30:00 |
||
| APPLICATION38.doc.7855docx | Special repairs to damaged Compound Wall at Rurka Kalan. | 18-01-2012 15:00:00 |
18-01-2012 15:30:00 |
||||
| NITNO. 20/2011-12/EE/BSNL/CD-I/CHD Dated:- 6-1-2012 | 20NIT7834.htm | 20NIT117834.pdf | Creation of new room between Room No. 413 & 414 in Admn Building Sector 34A, Chandigarh. | 16-01-2012 15:00:00 |
16-01-2012 15:30:00 |
||
| NIT No: 05/EE(C)/CD/Mohali/NIT/ 2011-12 dated 05-01-2012 | NIT lateral load pile testing7830.htm | NIT lateral load pile testing7830.pdf | Construction of Academic Block No 2 for Indian institute of Science education & Research at Mohali (Pb) including internal Electrical Installations (SH: conducting lateral load pile test) | 13-01-2012 15:00:00 |
13-01-2012 15:30:00 |
||
| 73/2011-12/EE/BSNL/CD/LDH Dated 03.01.2012 | BSNL W-6 NIT 727822.htm | NIT 72-11127822.doc | A/R & M/O to BSNL Building in Ferozepur SSA for the year 2011-12 (SH: Maintenance of Lawn in TE Building and Staff Colony at Faridkot and Staff Colony at Kotkapura (RE-Call) | 12-01-2012 15:00:00 |
12-01-2012 15:30:00 |
||
| 72/2011-12/EE/BSNL/CD/LDH Dated 03.01.2012 | BSNL W-6 NIT 727823.htm | NIT 72-11127823.doc | A/R & M/O to BSNL Building in Ferozepur SSA for the year 2011-12 (SH: Maintenance of Lawn in TE Building and Staff Colony at Faridkot and Staff Colony at Kotkapura. (RE-CALL) | 12-01-2012 15:00:00 |
12-01-2012 15:30:00 |
||
| 72/2011-12/EE/BSNL/CD/LDH Dated 04.01.2011 | BSNL W-6 NIT 727827.htm | NIT 72-11127827.doc | A/R & M/O to BSNL Building in Ferozepur SSA for the year 2011-12 (SH: Maintenance of Lawn in TE Building and Staff Colony at Faridkot and Staff Colony at Kotkapura (RE-CALL) | 12-01-2012 15:00:00 |
12-01-2012 15:30:00 |
||
| 73/2011-12/EE/BSNL/CD/LDH Dated 03.01.2012 | BSNL W-6 NIT 737824.htm | NIT 73-11127824.doc | Miscellaneous Civil works in TE Compound at Transport Nagar, Ludhiana | 11-01-2012 15:00:00 |
11-01-2012 15:30:00 |
||
| 73/2011-12/EE/BSNL/CD/LDH Dated 04.01.2012 | BSNL W-6 NIT 737828.htm | NIT 73-11127828.doc | Miscellaneous Civil works in TE Compound at Transport Nagar, Ludhiana | 11-01-2012 15:00:00 |
11-01-2012 15:30:00 |
||
| 71/2011-12/EE/BSNL/CD/LDH Dated 30-12-2011 | BSNL W-6 NIT 717820.htm | NIT 71-11127820.doc | Regrading & maintenance of compound in front of T.E. building at Transport Nagar Ludhiana | 09-01-2012 15:00:00 |
09-01-2012 15:30:00 |
||
| Notice Inviting Quotation | cup board corrigendum7836.htm | Addition/alteration of Cupboard in BSNL Staff Quarter No. 713-G, Sector-36, Chandigarh” | 09-01-2012 15:30:00 |
||||
| Quotation cupboard7825.htm | Quotation Cupboard7825.pdf | Addition/alteration of Cupboard in BSNL Staff Quarter No. 713-G, Sector-36, Chandigarh” | 07-01-2012 15:00:00 |
07-01-2012 15:30:00 |
|||
| 31/EE/BSNL/CD-II/CHD/2011-12 Dated: 24-12-2011. | w67808.htm | 31nit11-12 (1)7808.pdf | Provision for 30 rooms for faculty at open terrace on second floor in Admn building at transit campus, IIT Ropar. (SH: Civil Works and Electrical Works).(2nd Call) | 04-01-2012 15:00:00 |
04-01-2012 15:30:00 |
||
| 31nit11-12(2)7809.pdf | Provision for lab over Chemistry lab and Optic Lab in cut-out on second floor in Admn. building at transit campus, IIT Ropar (SH: Civil Works and Electrical Works).(2nd Call) | 04-01-2012 15:00:00 |
04-01-2012 15:30:00 |
||||
| 20/EE/BSNL/CD/PTA/2011-12 dated : 22.12.2011 | BSNL-6nit207797.htm | 1112nit207797.pdf | Day to Day maintenance of BSNL Buildings in the Jurisdiction of DET Fatehgarh, Samana, Nabha & MGG in Patiala SSA for the Period from Jan 2012 to March 2012. | 02-01-2012 15:00:00 |
02-01-2012 15:30:00 |
||
| NIT No. 19/2011-12/EE/BSNL/CD-I/CHD/ Dated: 22-12-2011 | 19NIT117799.htm | 19NIT117799.pdf | P/o partition work for the O/o EE(C)-I, II & EE(E) in basement Telephone Bhawan, Sector 27, Chandigarh(SH: Partition work for the office of EE(E)” | 30-12-2011 15:00:00 |
30-12-2011 15:30:00 |
||
| 19/EE/BSNL/CD/PTA/2011-12 dated 16.12.2011 | BSNL-6nit197767.htm | 1112nit197767.pdf | Repair of Bathrooms at Admn. Block & Telephone Exchange building at Sangrur. | 24-12-2011 15:00:00 |
24-12-2011 15:30:00 |
||
| 30/EE/BSNL/CD-II/CHD/CSD-PKL/2011-2012 dated: - 13.12.2011 | w67756.htm | 30NIT11-127756.pdf | Addition/alteration for accommodating new equipment in server room and replacement of damaged panelling of windows of server room at Data Centre at Sector-20, Panchkula. | 21-12-2011 15:00:00 |
21-12-2011 15:30:00 |
||
| NIT No: 18/2011-12/EE/BSNL/CD-I/CHD Dated 13-12-2011. | 18NIT117760.htm | 18NIT117760.pdf | Hiring of 1 No. of Non Air Conditioned Tata Indica Cars for 1600 Kms. Per month. | 21-12-2011 15:00:00 |
21-12-2011 15:30:00 |
||
| 69/2011-12/EE/BSNL/CD/LDH Dated 08-12-2011 | BSNL W-6 NIT 697743.htm | NIT 69-11127743.doc | Raising of Cable duct manhole necks and sealing of Cable entry pipes from T.E. Building Sanchar colony to Guru Nanak Public School, Ludhiana (RE-CALL) | 20-12-2011 15:00:00 |
20-12-2011 15:30:00 |
||
| 70/2011-12/EE/BSNL/CD/LDH Dated 12-12-2011 | BSNL W-6 NIT 707752.htm | NIT 70-11127752.doc | Raising of Cable Duct Manhole Necks of area under DET Rishi Balmiki Nagar, Ludhiana (RE-CALL) | 20-12-2011 15:00:00 |
20-12-2011 15:30:00 |
||
| Quotation No.4/EE/BSNL/CD/PTA/2011-12 dated 17.12.2011 | Q-47771.htm | Schedule of Quantity Q-47771.pdf | Provision of nosing angle & repairs of steps of staircase of BSNL Staff quarters at Sirhind. | 20-12-2011 15:00:00 |
20-12-2011 15:30:00 |
||
| 59/EE/BSNL/CD/ASR/11-12 Dated:- 08.12.2011 | NIT7741.htm | Tender doc7741.doc | “Maintenance of Mobile Towers in SSA Pathankot (Except Batala SDCA) during the year 2011-12.” | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||
| APPLICATION7742.doc | “Maintenance of Mobile Towers in SSA Pathankot (Except Batala SDCA) during the year 2011-12.” | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||||
| 60/EE/BSNL/CD/ASR/2011-12 dated:- 08.12.2011 | NIT Batala7745.htm | Tender Mtc Batala7745.doc | “Maintenance of Mobile Towers in SSA Pathankot (Batala SDCA) during the year 2010-11” | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||
| APPLICATION Batala7746.doc | “Maintenance of Mobile Towers in SSA Pathankot (Batala SDCA) during the year 2010-11” | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||||
| 61/EE/BSNL/CD/ASR/2011-12 dated 08.12.2011 | NIT USO PKT7747.htm | Tender USO PKT7747.doc | “Civil Repair and Maintenance of USO infrastructure sites under Civil Sub Division Pathankot | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||
| APPLICATION USO Pkt7748.doc | “Civil Repair and Maintenance of USO infrastructure sites under Civil Sub Division Pathankot | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||||
| 18/EE/BSNL/CD/PTA/2011-12 dated 09.12.2011 | BSNL-6nit187750.htm | 1112nit187750.pdf | Repair of Bathrooms at Admn. Block & Telephone Exchange building at Sangrur. | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||
| 59/EE/BSNL/CD/ASR/11-12 Dated:- 08.12.2011 | NIT7754.htm | Tender doc7754.doc | “Maintenance of Mobile Towers in SSA Pathankot (Except Batala SDCA) during the year 2011-12.” | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||
| APPLICATION7755.doc | “Maintenance of Mobile Towers in SSA Pathankot (Except Batala SDCA) during the year 2011-12.” | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||||
| Corridendum to 1112nit18 dated 16.12.2011 | Corri1112nit187765.htm | corri1112 nit187765.pdf | Repair of Bathrooms at Admn. Block & Telephone Exchange building at Sangrur . | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||
| Corrigendum to 1112nit18 dated 16.12.2011 | Corri1112nit187766.htm | corri1112 nit187766.pdf | Repair of Bathrooms at Admn. Block & Telephone Exchange building at Sangrur | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||
| Corrigendum nit18 dated 16.12.2011 | corrigendum nit187768.htm | corrigendum nit187768.pdf | Repair of Bathrooms at Admn. Block & Telephone Exchange building at Sangrur | 19-12-2011 15:00:00 |
19-12-2011 15:30:00 |
||
| 58/EE/BSNL/CD/ASR/2011-12 dated 07.12.2011 | NIT7737.htm | Tender operational ASR7737.doc | “A/R & M/O to BSNL Buildings and Staff Quarters at SSA Amritsar during year 2011.(SH: Maintenance & operational jobs in O/o the EE(C) & SDE (C)-PH-III, Amritsar). | 17-12-2011 15:00:00 |
17-12-2011 15:30:00 |
||
| APPLICATION7738.doc | “A/R & M/O to BSNL Buildings and Staff Quarters at SSA Amritsar during year 2011.(SH: Maintenance & operational jobs in O/o the EE(C) & SDE (C)-PH-III, Amritsar). | 17-12-2011 15:00:00 |
17-12-2011 15:30:00 |
||||
| 67/2011-12/EE/BSNL/CD/LDH Dated 07-12-2011 | BSNL W-6 NIT 677735.htm | NIT 67-11127735.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to Day Maintenance of TE Buildings under CSD-I, Ludhiana) | 16-12-2011 15:00:00 |
16-12-2011 15:30:00 |
||
| 68/2011-12/EE/BSNL/CD/LDH Dated 07-12-2011 | BSNL W-6 NIT 687736.htm | NIT 68-11127736.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to Day Maintenance of Staff Quarter under CSD-I, Ludhiana) | 16-12-2011 15:00:00 |
16-12-2011 15:30:00 |
||
| 04/EE(C)/CD/Mohali/NIT/2011-12 dated 05-12-2011 | New Microsoft Office Word Document7734.htm | NIT routine pile testing7734.pdf | construction of accademic block no 2 for Indian Institute of Science and Education Researchat Mohali Punjab including internal electrical installations SH: conducting routine pile test | 13-12-2011 15:00:00 |
13-12-2011 15:30:00 |
||
| NIT No-17/2011-12/EE/BSNL/CD-I/CHD Dated 02-12-2011 | Corrigendum Vehicle7749.htm | Hiring of 1 No. of Non Air Conditioned Tata Indica Cars for 1600 Kms. Per month | 13-12-2011 15:30:00 |
||||
| 66/2011-12/EE/BSNL/CD/LDH Dated 30-11-2011 | BSNL W-6 NIT 667725.htm | NIT 66-11127725.doc | A/R & M/O to BSNL Building in Ferozepur SSA for the year 2011-12 (SH: Maintenance of Lawn in TE Building and Staff Colony at Faridkot and Staff Colony at Kotkapura) - RE-CALL | 12-12-2011 15:00:00 |
12-12-2011 15:30:00 |
||
| 28/EE/BSNL/CD-II/CHD/2011-12 dated 28-11-2011 | w67712.htm | 28NIT11-12 A7712.pdf | Provision for 30 rooms for faculty at open terrace on second floor in Admn building at transit campus, IIT Ropar. (SH: Civil Works and Electrical Works). | 09-12-2011 15:00:00 |
09-12-2011 15:30:00 |
||
| 28NIT11-12 B7713.pdf | Provision for lab over Chemistry lab and Optic Lab in cut-out on second floor in Admn. building at transit campus, IIT Ropar (SH: Civil Works and Electrical Works). | 09-12-2011 15:00:00 |
09-12-2011 15:30:00 |
||||
| 29/EE/BSNL/CD-II/CHD/2011-2012 dated: 01-12-2011 | w67727.htm | 29NIT11-127727.pdf | Provision of barbed wire fencing at BSNL tower site at Nayagaon. (IInd call) | 09-12-2011 15:00:00 |
09-12-2011 15:30:00 |
||
| NIT No. 16/2011-12/EE/BSNL/CD-I/CHD/ Dated: 1-12-2011 | 16NIT117729.htm | 16NIT117729.pdf | P/o partition work for the O/o EE(C)-I, II & EE(E) in basement Telephone Bhawan, Sector 27, Chandigarh(SH: Partition work for the office of EE(E)” | 09-12-2011 15:00:00 |
09-12-2011 15:30:00 |
||
| NIT No-17/2011-12/EE/BSNL/CD-I/CHD Dated 02-12-2011 | 17NIT117730.htm | 17NIT117730.pdf | Hiring of 1 No. of Non Air Conditioned Tata Indica Cars for 1600 Kms. Per month | 09-12-2011 15:00:00 |
09-12-2011 15:31:00 |
||
| NIT No.- 15/2011-12/EE/BSNL/CD-I/CHD Dated: 19-11-2011 | 15NIT117689.htm | 15NIT117689.pdf | C/o 100 rooms hostel with dining facility, guest rooms, Warden office & residence in IMTECH, Chandigarh (SH: Fabrication, providing, installing, testing and commissioning of stainless steel kitchen ta | 30-11-2011 15:00:00 |
30-11-2011 15:30:00 |
||
| 57/EE/BSNL/CD/ASR/2011-12 dated 17.11.2011 | NIT7680.htm | tender BHADWAR7680.doc | “Repair / Reconstruction of damaged boundary wall at Bhadwar BTS Site. | 28-11-2011 15:00:00 |
28-11-2011 15:30:00 |
||
| APPLICATION BHADWAR7681.doc | “Repair / Reconstruction of damaged boundary wall at Bhadwar BTS Site. | 28-11-2011 15:00:00 |
28-11-2011 15:30:00 |
||||
| 27/EE/BSNL/CD-II/CHD/2011-2012 Dated 17-11-2011 | W67685.htm | 27NIT11-127685.pdf | Provision of barbed wire fencing at BSNL tower site at Nayagaon. | 28-11-2011 15:00:00 |
28-11-2011 15:30:00 |
||
| 64/2011-12/EE/BSNL/CD/LDH Dated 17-11-2011 | BSNL W-6 NIT 647682.htm | NIT 64-11127682.doc | A/R & M/O to BSNL Buildings in Bathinda SSA for the year 2011-12 (SH: Day to Day Maintenance of P&T Colony at Bathinda) | 26-11-2011 15:00:00 |
26-11-2011 15:30:00 |
||
| 65/2011-12/EE/BSNL/CD/LDH Dated 17-11-2011 | BSNL W-6 NIT 657683.htm | NIT 65-11127683.doc | A/R & M/O to BSNL Buildings in Bathinda SSA for the year 2011-12 (SH: Day to Day Maintenance for TE Buildings in Bathinda) | 26-11-2011 15:00:00 |
26-11-2011 15:30:00 |
||
| 63/2011-12/EE/BSNL/CD/LDH/2011-12 Dated 14-11-2011 | BSNL W-6 NIT 637675.htm | NIT 63-11127675.doc | A/R & M/O to BSNL Building in Ferozepur SSA for the year 2011-12 (SH: Maintenance of Lawn in TE Building and Staff Colony at Faridkot and Staff Colony at Kotkapura) (RE-CALL) | 24-11-2011 15:00:00 |
24-11-2011 15:30:00 |
||
| 61/2011-12/EE/BSNL/CD/LDH Dated 09-11-2011 | BSNL W-6 NIT 617671.htm | NIT 61-11127671.doc | Raising of Cable duct manhole necks and sealing of Cable entry pipes from T.E. Building Sanchar colony to Guru Nanak Public School, Ludhiana | 22-11-2011 15:00:00 |
22-11-2011 15:30:00 |
||
| 62/2011-12/EE/BSNL/CD/LDH Dated 09-11-2011 | BSNL W-6 NIT 627672.htm | NIT 62-11127672.doc | Raising of Cable Duct Manhole Necks of area under DET Rishi Balmiki Nagar, Ludhiana | 22-11-2011 15:00:00 |
22-11-2011 15:30:00 |
||
| 61/2011-12/EE/BSNL/CD/LDH Dated 09-11-2011 | Corrigendum_NIT 617687.doc | Raising of Cable duct manhole necks and sealing of Cable entry pipes from T.E. Building Sanchar colony to Guru Nanak Public School, Ludhiana | 22-11-2011 15:30:00 |
||||
| 62/2011-12/EE/BSNL/CD/LDH Dated 09-11-2011 | Corrigendum_NIT 627688.doc | Raising of Cable Duct Manhole Necks of area under DET Rishi Balmiki Nagar, Ludhiana | 22-11-2011 15:30:00 |
||||
| 01/EE/BSNL/PCD/MHL/2011-12 dated 09-11-2011 | Computer Quotation Notice7669.htm | Schedule of quantities of computer Q-17669.pdf | Purchase of computer for use of EE(C) BSNL Civil Division Mohali | 21-11-2011 15:00:00 |
21-11-2011 15:30:00 |
||
| 58/2011-12/EE/BSNL/CD/LDH Dated 04-11-2011 | BSNL W-6 NIT 587661.htm | NIT 58-11127661.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-12 (SH: Day to Day Maintenance of Staff Quarter under the jurisdiction of BSNL Civil Sub Division-I, Ferozepur) (RE-CALL) | 16-11-2011 15:00:00 |
16-11-2011 15:30:00 |
||
| 57/2011-12/EE/BSNl/CD/LDH Dated 04-11-2011 | BSNL W-6 NIT 577660.htm | NIT 57-11127660.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-12 (SH: Day to Day Maintenance of TE Buildings under the jurisdiction of BSNL Civil Sub Division-I, Ferozepur) (RE-CALL) | 16-11-2011 15:00:00 |
16-11-2011 15:30:00 |
||
| 59/2011-12/EE/BSNL/CD/LDH Dated 04-11-2011 | BSNL W-6 NIT 597662.htm | NIT 59-11127662.doc | Maintenance of lawns in P & T Colony at Ferozepur Cantt. During the year of 2011-12. | 16-11-2011 15:00:00 |
16-11-2011 15:30:00 |
||
| 60/2011-12/EE/BSNL/CD/LDH Dated 04-11-2011 | BSNL W-6 NIT 607663.htm | NIT 60-11127663.doc | A/R & M/O to BSNL buildings in Ferozepur SSA for the year 2011-12 (SH: Maintenance and operational jobs in the O/o SDE (Civil) BSNL Civil Sub Division-II, Ferozepur | 16-11-2011 15:00:00 |
16-11-2011 15:30:00 |
||
| 56/2011-12/EE/BSNL/CD/LDH Dated 02-11-2011 | BSNL W-6 NIT 567657.htm | NIT 56-11127657.doc | Infrastructure for Defence Project (NFS) - “Civil works for Ascon Node at Nathewala (Faridkot).” | 15-11-2011 15:00:00 |
15-11-2011 15:30:00 |
||
| 55/2011-12/EE/BSNL/CD/LDH Dated 02-11-2011 | BSNL W-6 NIT 557656.htm | NIT 55-11127656.doc | Infrastructure for Defence Project (NFS) - “Civil works for Access Node at Faridkot.” | 15-11-2011 15:00:00 |
15-11-2011 15:30:00 |
||
| 54/2011-12/EE/BSNL/CD/LDH Dated 02-11-2011 | BSNL W-6 NIT 547655.htm | NIT 54-11127655.doc | Infrastructure for Defence Project (NFS) - “Civil works for Access Node at Fazilka.” | 15-11-2011 15:00:00 |
15-11-2011 15:30:00 |
||
| 56/EE/BSNL/CD/ASR/2011-12 dated:- 05.11.2011 | NIT7664.htm | Tender doc Raising DEP-I ASR7664.doc | “Raising the level in Front of O/o DEP(City-I), Amritsar” | 15-11-2011 15:00:00 |
15-11-2011 15:30:00 |
||
| APPLICATION7665.doc | “Raising the level in Front of O/o DEP(City-I), Amritsar” | 15-11-2011 15:00:00 |
15-11-2011 15:30:00 |
||||
| NIT No. 14/2011-12/EE/BSNL/CD-I/CHD/ Dated: 2-11-2011 | 14NIT117653.htm | 14NIT117653.pdf | Mtce. of horticulture works in the compound of Administrative Block, Sector 34, Chandigarh | 11-11-2011 15:00:00 |
11-11-2011 15:30:00 |
||
| 26/EE/BSNL/CD-II/CHD/SDE(C)/RPR/2011-2012 dated 03-11-2011 | w67658.htm | 26 NIT 11-127658.pdf | Maintenance and operational jobs in the office of BSNL Civil Sub Division Ropar for the period November 2011 to March 2012. | 11-11-2011 15:00:00 |
11-11-2011 15:30:00 |
||
| Corrigendum | Corrigendum7659.htm | Maintenance and operational jobs in the office of BSNL Civil Sub Division Ropar for the period November 2011 to March 2012. | 11-11-2011 15:30:00 |
||||
| 14/2011-12/EE/BSNL/CD/CHD Dated 2-11-2011 | horticulture7667.htm | horticulture.doc.7667docx | CORRIGENDUM--iMtce. of horticulture works in the compound of Administrative Block, Sector-34, Chandigarh | 11-11-2011 15:00:00 |
11-11-2011 15:30:00 |
||
| 25/EE/BSNL/CD-II/CHD/CSD-PKL/2011-2012dated 29-10-2011 | w67639.htm | 25NIT11-127639.pdf | Addition/alteration for accommodating new equipment in server room and replacement of damaged panelling of windows of server room at Data Centre at Sector-20, Panchkula. | 08-11-2011 15:00:00 |
08-11-2011 15:30:00 |
||
| Corrigendum | coorigendum7646.htm | Addition/alteration for accommodating new equipment in server room and replacement of damaged panelling of windows of server room at Data Centre at Sector-20, Panchkula. | 08-11-2011 15:30:00 |
||||
| 54/EE/BSNL/CD/ASR/11-12 Dated:- 25.10.2011 | NIT Tower Pkt7630.htm | Tender doc7630.doc | “Maintenance of Mobile Towers in SSA Pathankot (Except Batala SDCA) during the year 2011-12.” | 05-11-2011 15:00:00 |
05-11-2011 15:30:00 |
||
| APPLICATION7631.doc | “Maintenance of Mobile Towers in SSA Pathankot (Except Batala SDCA) during the year 2011-12.” | 05-11-2011 15:00:00 |
05-11-2011 15:30:00 |
||||
| 55/EE/BSNL/CD/ASR/2011-12 dated 25.10.2011 | NIT USO ASR7632.htm | Tender USO ASR7632.doc | “Maintenance of USO Towers in the area under BSNL Civil Sub Division Amritsar | 05-11-2011 15:00:00 |
05-11-2011 15:30:00 |
||
| APPLICATION USO ASR7633.doc | “Maintenance of USO Towers in the area under BSNL Civil Sub Division Amritsar | 05-11-2011 15:00:00 |
05-11-2011 15:30:00 |
||||
| 03/EE(C)/PCD/Mohali/NIT/2011-12 dated 17.10.11 | NIT037607.htm | NIT-IISERInformatics7607.pdf | Construction of Informatics Centre for Indian Institute Of Science Education and Research at Mohali Pb including internal electrical installations and developement works | 02-11-2011 15:00:00 |
02-11-2011 15:30:00 |
||
| NIT No. 13/2011-12/EE/BSNL/CD-I/CHD/ Dated: 21-10-2011 | 13NIT117617.htm | 13NIT117617.pdf | Provision of floor tiles in Quarter No. 428, Sector 30A, Chandigarh | 02-11-2011 15:00:00 |
02-11-2011 15:30:00 |
||
| 03/EE(C)/PCD/Mohali/NIT/2011-12 dated 17.10.11 | 1MINUTES OF PRE BID CONFERENCE_Upload7625.htm | Construction of Informatics Centre for Indian Institute Of Science Education and Research at Mohali Pb including internal electrical installations and developement works | 02-11-2011 15:30:00 |
||||
| NITNo12/2011-12/EE/BSNL/CD-I/CHDDated10-10-2011 | Corrigendum NIT 127604.htm | C/o 100 rooms hostel with dining facility, guest rooms, Warden office & residence in IMTECH, Chandigarh (SH: Fabrication, providing, installing, testing and commissioning of stainless steel kitchen ta | 31-10-2011 15:30:00 |
||||
| 24/EE/BSNL/CD-II/CHD/2011-2012 Dated: 20-10-2011 | w67612.htm | 24NIT 2011-20127612.pdf | Raising of exisitng compound wall around CSD store (PB) I.A. Phase-VIII Mohali. | 31-10-2011 15:00:00 |
31-10-2011 15:30:00 |
||
| 52/2011-12/EE/BSNL/CD/LDH Dated 15-10-2011 | BSNL W-6 NIT 527598.htm | NIT 52-11127598.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-12 (SH: Day to Day Maintenance of TE Buildings under the jurisdiction of BSNL Civil Sub Division-I, Ferozepur) | 28-10-2011 15:00:00 |
28-10-2011 15:30:00 |
||
| 53/2011-12/EE/BSNL/CD/LDH Dated 15-10-2011 | BSNL W-6 NIT 537599.htm | NIT 53-11127599.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-12 (SH: Day to Day Maintenance of Staff Quarter under the jurisdiction of BSNL Civil Sub Division-I, Ferozepur) | 28-10-2011 15:00:00 |
28-10-2011 15:30:00 |
||
| 53/EE/BSNL/CD/ASR/2011-12 dated 15.10.2011 | Corri gagobua7608.doc | “Repairs to roof of rented T.E Building at Gagobua | 24-10-2011 15:30:00 |
||||
| 48/2010-11/EE/BSNL/CD/LDH Dated 10-10-2011 | Corrigendum_NIT 487609.doc | Provision of Water proofing treatment at the terrace of T.E. bldg. at Transport Nagar , Ludhiana | 24-10-2011 15:30:00 |
||||
| 53/EE/BSNL/CD/ASR/2011-12 dated 15.10.2011 | NIT7600.htm | Tender Doc Gagobua7600.doc | “Repairs to roof of rented T.E Building at Gagobua | 23-10-2011 15:00:00 |
23-10-2011 15:30:00 |
||
| APPLICATION Gagobua7601.doc | “Repairs to roof of rented T.E Building at Gagobua | 23-10-2011 15:00:00 |
23-10-2011 15:30:00 |
||||
| 50/2011-12/EE/BSNL/CD/LDH Dated 13-10-2011 | BSNL W-6 NIT 507584.htm | NIT 50-11127584.doc | A/R & M/O to BSNL Buildings in Bathinda SSA for the year 2011-12 (SH: Day to Day Maintenance for TE Building in outer area under the jurisdiction of BSNL Civil Sub Division, Bathinda) (RE-CALL) | 22-10-2011 15:00:00 |
22-10-2011 15:30:00 |
||
| 51/2011-12/EE/BSNL/CD/LDH Dated 13-10-2011 | BSNL W-6 NIT 517585.htm | NIT 51 -11127585.doc | Replacing of damaged floor tile and repairing of false flooring in MSC Switch Room at Kotkapura. (RE-CALL) | 22-10-2011 15:00:00 |
22-10-2011 15:30:00 |
||
| 36/EE/BSNL/CD/JL/NIT/2011-12 Dt.13.10.2011 | NIT367586.htm | TENDERDOCUMENT36.doc.7586docx | Care taking/House keeping of Inspection Quarter in CTO Compound, Jalandhar.(2nd Call) | 22-10-2011 15:00:00 |
22-10-2011 15:30:00 |
||
| APPLICATION36.doc.7587docx | Care taking/House keeping of Inspection Quarter in CTO Compound, Jalandhar.(2nd Call) | 22-10-2011 15:00:00 |
22-10-2011 15:30:00 |
||||
| 37/EE/BSNL/CD/JL/NIT/2011-12 Dt.13.10.2011 | NIT377591.htm | TENDERDOCUMENT37.doc.7591docx | A/R & M/O to Telephone Exchange Building and Staff Quarters at Mukerian (Distt. Hoshiarpur). | 22-10-2011 15:00:00 |
22-10-2011 15:30:00 |
||
| APPLICATION37.doc.7592docx | A/R & M/O to Telephone Exchange Building and Staff Quarters at Mukerian (Distt. Hoshiarpur). | 22-10-2011 15:00:00 |
22-10-2011 15:30:00 |
||||
| 49/2011-12/EE/BSNL/CD/LDH Dated 13-10-2011 | BSNL W-6 NIT 497583.htm | NIT 49-11127583.doc | A/R & M/O to BSNL Building in Ferozepur SSA for the year 2011-12 (SH: Maintenance of Lawn in TE Building and Staff Colony at Faridkot and Staff Colony at Kotkapura) (RE-CALL) | 21-10-2011 15:00:00 |
21-10-2011 15:30:00 |
||
| 54/2011-12/EE/BSNL/CD/LDH Dated 15-10-2011 | BSNL W-6 NIT 547603.htm | NIT 54-2011-127603.doc | Provision of New Main Gate for Entrance to Telecom Store of BTI SSA at Bhagu Road, Bathinda | 21-10-2011 15:00:00 |
21-10-2011 15:30:00 |
||
| NITNo12/2011-12/EE/BSNL/CD-I/CHDDated10-10-2011 | 12NIT117562.htm | 12NIT117562.pdf | C/o 100 rooms hostel with dining facility, guest rooms, Warden office & residence in IMTECH, Chandigarh (SH: Fabrication, providing, installing, testing and commissioning of stainless steel kitchen ta | 20-10-2011 15:00:00 |
20-10-2011 15:30:00 |
||
| 48/2010-11/EE/BSNL/CD/LDH Dated 10-10-2011 | BSNL W-6 NIT 487559.htm | NIT 48-11127559.doc | Provision of Water proofing treatment at the terrace of T.E. bldg. at Transport Nagar , Ludhiana | 19-10-2011 15:00:00 |
19-10-2011 15:30:00 |
||
| Corrigendum | Corrigendium NIT 487564.doc | Provision of Water proofing treatment at the terrace of T.E. bldg. at Transport Nagar , Ludhiana | 19-10-2011 15:30:00 |
||||
| 23/EE/BSNL/CD-II/CHD/2011-2012 dated 11-10-2011 | w-67566.htm | 23NIT2011-127566.pdf | Raising of existing compound wall around CSD store (PB) I.A. Phase-VIII Mohali.(IInd Call) | 19-10-2011 15:00:00 |
19-10-2011 15:30:00 |
||
| 51/EE/BSNL/CD/ASR/2011-12 dated 11.10.2011 | NIT7573.htm | Tender Doc7573.doc | Construction of cable duct Chamber Near Gurdwara at Lohgarh Amritsar | 18-10-2011 15:00:00 |
18-10-2011 15:30:00 |
||
| APPLICATIO17574.doc | Construction of cable duct Chamber Near Gurdwara at Lohgarh Amritsar | 18-10-2011 15:00:00 |
18-10-2011 15:30:00 |
||||
| 52/EE/BSNL/CD/ASR/2011-12 dated 11.10.2011 | NIT7575.htm | Tender Horti Pkt7575.doc | “Horticulture works and Upkeeping of Lawns/ Plants in T.E building Compound Pathankot and Gurdaspur during the year 2011-12 ( October 2011 to March 2012 ) | 18-10-2011 15:00:00 |
18-10-2011 15:30:00 |
||
| APPLICATIO17576.doc | “Horticulture works and Upkeeping of Lawns/ Plants in T.E building Compound Pathankot and Gurdaspur during the year 2011-12 ( October 2011 to March 2012 ) | 18-10-2011 15:00:00 |
18-10-2011 15:30:00 |
||||
| 17/EE/BSNL/CD/PTA/2011-12 dated : 03.10.2011 | BSNL-6nit177532.htm | 1112nit177532.pdf | Day to Day Maintenance of BSNL Buildings in the Jurisdiction of DET(Group) PTA & Local BSNL Buildings in Patiala for the Period from Nov., 2011 to March, 2012. | 17-10-2011 15:00:00 |
17-10-2011 15:30:00 |
||
| 35/EE/BSNL/CD/JL/NIT/2011-12 Dt.11.10.2011 | NIT357567.htm | TENDERDOCUMENT35.doc.7567docx | Petty Repairs and Painting Operations on Change of Occupancy in BSNL Staff Quarters Under SSA Jalandhar During the Year 2011-12.(4th Call) | 17-10-2011 15:00:00 |
17-10-2011 15:30:00 |
||
| APPLICATION35.doc.7568docx | Petty Repairs and Painting Operations on Change of Occupancy in BSNL Staff Quarters Under SSA Jalandhar During the Year 2011-12.(4th Call) | 17-10-2011 15:00:00 |
17-10-2011 15:30:00 |
||||
| 47/EE/BSNL/CD/ASR/2011-12 dated 07.10.2011 | NIT GSP7549.htm | Tender P&T Gurdaspur7549.doc | “ARMO to BSNL Quarters in P&T Colony at Gurdaspur during the year 2011-12 | 15-10-2011 15:00:00 |
15-10-2011 15:30:00 |
||
| APPLICATIO GSP7550.doc | “ARMO to BSNL Quarters in P&T Colony at Gurdaspur during the year 2011-12 | 15-10-2011 15:00:00 |
15-10-2011 15:30:00 |
||||
| 48/EE/BSNL/CD/ASR/2011-12 dated 07.10.2011 | NIT Build GRDM7551.htm | Tender Building & Compound GRDM7551.doc | “ARMO to BSNL building & Boundary Wall at Guru Ravi Dass Marg Amritsar during the year 2011-12 | 15-10-2011 15:00:00 |
15-10-2011 15:30:00 |
||
| APPLICATION Building7552.doc | “ARMO to BSNL building & Boundary Wall at Guru Ravi Dass Marg Amritsar during the year 2011-12 | 15-10-2011 15:00:00 |
15-10-2011 15:30:00 |
||||
| 49/EE/BSNL/CD/ASR/2011-12 dated 07.10.2011 | NIT SQ GRDM7553.htm | Tender SQ GRDM7553.doc | “ARMO to BSNL Staff quarters at Guru Ravi Dass Marg Amritsar during the year 2011-12 | 15-10-2011 15:00:00 |
15-10-2011 15:30:00 |
||
| APPLICATION SQ GRDM7554.doc | “ARMO to BSNL Staff quarters at Guru Ravi Dass Marg Amritsar during the year 2011-12 | 15-10-2011 15:00:00 |
15-10-2011 15:30:00 |
||||
| 50/EE/BSNL/CD/ASR/2011-12 dated 07.10.2011 | NIT USO ASR7555.htm | Tender USO ASR7555.doc | “Maintenance of USO Towers in the area under BSNL Civil Sub Division Amritsar | 15-10-2011 15:00:00 |
15-10-2011 15:30:00 |
||
| APPLICATION USO ASR7556.doc | “Maintenance of USO Towers in the area under BSNL Civil Sub Division Amritsar | 15-10-2011 15:00:00 |
15-10-2011 15:30:00 |
||||
| 15/EE/BSNL/CD/PTA/2011-12 dated 29.09.2011 | BSNL-6 nit157514.htm | 1112nit157514.pdf | Maintenance of Lawns/Trainee Parks in RTTC Complex at Rajpura from October 2011 to March 2012. | 13-10-2011 15:00:00 |
13-10-2011 15:30:00 |
||
| 16/EE/BSNL/CD/PTA/2011-12 dated 29.09.2011 | BSNL_6nit167515.htm | 1112nit167515.pdf | AMC of Automatic Chlorination plant from October, 2011 to September, 2012 installed in RTTC at Rajpura. | 13-10-2011 15:00:00 |
13-10-2011 15:30:00 |
||
| 33/EE/BSNL/CD/JL/NIT/2011-12 Dt.05.10.2011 | NIT337544.htm | TENDERDOCUMENT33.doc.7544docx | Care taking/House keeping of Inspection Quarter in CTO Compound, Jalandhar. | 13-10-2011 15:00:00 |
13-10-2011 15:30:00 |
||
| APPLICATION33.doc.7545docx | Care taking/House keeping of Inspection Quarter in CTO Compound, Jalandhar. | 13-10-2011 15:00:00 |
13-10-2011 15:30:00 |
||||
| 34/EE/BSNL/CD/JL/NIT/2011-12 Dt.07.10.2011 | NIT347546.htm | TENDERDOCUMENT34.doc.7546docx | Replacement of damaged AC sheet roofing of HT panel room in CTO Building Jalandhar.(3rd Call) | 13-10-2011 15:00:00 |
13-10-2011 15:30:00 |
||
| APPLICATION34.doc.7547docx | Replacement of damaged AC sheet roofing of HT panel room in CTO Building Jalandhar.(3rd Call) | 13-10-2011 15:00:00 |
13-10-2011 15:30:00 |
||||
| 32/EE/BSNL/CD/JL/NIT/2011-12 Dt.04.10.2011 | NIT327535.htm | TENDERDOCUMENT32.doc.7535docx | Petty Repairs and Painting Operations on Change of Occupancy in BSNL Staff Quarters Under SSA Jalandhar During the Year 2011-12.(3rd Call) | 11-10-2011 15:00:00 |
11-10-2011 15:30:00 |
||
| APPLICATION32.doc.7536docx | Petty Repairs and Painting Operations on Change of Occupancy in BSNL Staff Quarters Under SSA Jalandhar During the Year 2011-12.(3rd Call) | 11-10-2011 15:00:00 |
11-10-2011 15:30:00 |
||||
| 42/EE/BSNL/CD/ASR/2011-12 Dated 24.09.2011 | NIT7487.htm | Tender operational pkt7487.doc | “Maintenance & Operational jobs in O/o The SDE(C),Pathankot during the year 2011-12(October 2011 to March 2012 | 07-10-2011 15:00:00 |
07-10-2011 15:30:00 |
||
| APPLICATIO final7488.doc | “Maintenance & Operational jobs in O/o The SDE(C),Pathankot during the year 2011-12(October 2011 to March 2012 | 07-10-2011 15:00:00 |
07-10-2011 15:30:00 |
||||
| 43/EE/BSNL/CD/ASR/2011-12 dated 28.09.2011 | NIT GDP7501.htm | Tender GDP7501.doc | ARMO to RSU building, Santry Post, Pump Room and Compound Wall at Gurdaspur during the year 2011-12 | 07-10-2011 15:00:00 |
07-10-2011 15:30:00 |
||
| Application GDP7502.doc | ARMO to RSU building, Santry Post, Pump Room and Compound Wall at Gurdaspur during the year 2011-12 | 07-10-2011 15:00:00 |
07-10-2011 15:30:00 |
||||
| 44/EE/BSNL/CD/ASR/2011-12 dated 28.09.2011 | NIT PKT7503.htm | Tender Pkt7503.doc | ARMO to P&T Colony at Pathankot during the year 2011-12 | 07-10-2011 15:00:00 |
07-10-2011 15:30:00 |
||
| APPLICATION PKT7504.doc | ARMO to P&T Colony at Pathankot during the year 2011-12 | 07-10-2011 15:00:00 |
07-10-2011 15:30:00 |
||||
| 45/EE/BSNL/CD/ASR/2011-12 dated 28.09.2011 | NIT USO PKT7505.htm | Tender USO PKT7505.doc | Civil Repair and Maintenance of USO infrastructure sites under Civil Sub Division Pathankot | 07-10-2011 15:00:00 |
07-10-2011 15:30:00 |
||
| APPLICATION USO Pkt7506.doc | Civil Repair and Maintenance of USO infrastructure sites under Civil Sub Division Pathankot | 07-10-2011 15:00:00 |
07-10-2011 15:30:00 |
||||
| 46/EE/BSNL/CD/ASR/2011-12 dated 28.09.2011 | NIT USO ASR7507.htm | Tender USO ASR7507.doc | Maintenance of USO Towers in the area under BSNL Civil Sub Division Amritsar | 07-10-2011 15:00:00 |
07-10-2011 15:30:00 |
||
| APPLICATION USO ASR7508.doc | Maintenance of USO Towers in the area under BSNL Civil Sub Division Amritsar | 07-10-2011 15:00:00 |
07-10-2011 15:30:00 |
||||
| 22/EE/BSNL/CD-II/CHD/CSD-PKL/2011-2012 dated: - 27.09.2011 | w67499.htm | 22NIT11-127499.pdf | Addition/alteration for accommodating new equipment in server room and replacement of damaged paneling of windows of server room at Data Centre at Sector-20 Panchkula. | 05-10-2011 15:00:00 |
05-10-2011 15:30:00 |
||
| 31/EE/BSNL/CD/JL/NIT/2011-12 Dt.22.09.2011 | NIT317481.htm | TENDERDOCUMENT31.doc.7481docx | Petty Repairs and Painting Operations on Change of Occupancy in BSNL Staff Quarters Under SSA Jalandhar During the Year 2011-12.(2nd Call) | 28-09-2011 15:00:00 |
28-09-2011 15:30:00 |
||
| APPLICATION31.doc.7482docx | Petty Repairs and Painting Operations on Change of Occupancy in BSNL Staff Quarters Under SSA Jalandhar During the Year 2011-12.(2nd Call) | 28-09-2011 15:00:00 |
28-09-2011 15:30:00 |
||||
| Corrigendum7498.htm | Corrigendum.doc.7498docx | Petty Repairs and Painting Operations on Change of Occupancy in BSNL Staff Quarters Under SSA Jalandhar During the Year 2011-12.(2nd Call) | 28-09-2011 15:00:00 |
28-09-2011 15:30:00 |
|||
| 45/2011-12/EE/BSNL/CD/LDH Dated 16-09-2011 | BSNL W-6 NIT 457452.htm | NIT 45-11127452.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to Day maintenance for Staff Quarters of Local Area under BSNL Civil Sub Division-II, Ludhiana) | 26-09-2011 15:00:00 |
26-09-2011 15:30:00 |
||
| 46/2011-12/EE/BSNL/CD/LDH Dated 16-09-2011 | BSNL W-6 NIT 467453.htm | NIT 46-11127453.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to day maintenance for TE building Local Area under BSNL Civil Sub Division-II, Ludhiana) | 26-09-2011 15:00:00 |
26-09-2011 15:30:00 |
||
| NIT No. 47/2011-12/EE/BSNL/CD/LDH Dated:- 17-09-2011 | BSNL W-6 NIT 477454.htm | NIT 47-11127454.doc | :- Face Lifting of entrance lobby including the staircase up to top floor and top floor bathroom in T.E. building at Transport Nagar Ludhiana(SH: Provision of overhead water tank & separate w | 24-09-2011 15:00:00 |
24-09-2011 15:30:00 |
||
| NIT No.11/ EE/BSNL/CD-I/CHD/2011-2012 Dated 7-9-2011 | 11NIT117455.htm | 11NIT117455.pdf | Construction of Advance Center for Protein Informatics, Science, Engineering and Technology in IMTECH, Sector-39 A, Chandigarh ( SH : Water Body, Connecting shed and Misc. works). | 24-09-2011 15:00:00 |
24-09-2011 15:30:00 |
||
| Corrigendum | CORRIGENDUM7463.htm | Construction of Advance Center for Protein Informatics, Science, Engineering and Technology in IMTECH, Sector-39 A, Chandigarh ( SH : Water Body, Connecting shed and Misc. works). | 24-09-2011 15:30:00 |
||||
| 21/ EE/BSNL/CD-II/Chd/csd/mhl/2011-12 dated : 14.09.2011 | bsnl 6 nit labour ee7445.htm | NIT labour ee7445.pdf | Maintenance and operational jobs in O/o Executive Engineer ( C) BSNL civil Division - II Chandigarh from October 2011 to June 2012. | 22-09-2011 15:00:00 |
22-09-2011 15:30:00 |
||
| 44/2011-12/EE/BSNL/CD/LDH Dated 13-09-2011 | BSNL W-6 NIT 447442.htm | NIT 44-11127442.doc | Raising of Entrance Gates , entrance road level and provision of ramps at the entrance of T.E. building at Tranport Nagar at Ludhiana | 19-09-2011 15:00:00 |
19-09-2011 15:30:00 |
||
| 42/2011-12/EE/BSNL/CD/LDH Dated 09-09-2011 | BSNL W-6 NIT 427428.htm | NIT 42-11127428.doc | Day to day maintenance of BSNL Buildings during the year of 2011-12 under the jurisdiction of BSNL Civil Sub Division-II at Ferozepur | 17-09-2011 15:00:00 |
17-09-2011 15:30:00 |
||
| 43/2011-12/EE/BSNL/CD/LDH Dated 09-09-2011 | BSNL W-6 NIT 437429.htm | NIT 43-11127429.doc | Day to day maintenance of BSNL Staff Quarters under the Jurisdiction of BSNL Civil Sub Division-II at Ferozepur during the year 2011-12 | 17-09-2011 15:00:00 |
17-09-2011 15:30:00 |
||
| 41/2011-12/EE/BSNL/CD/LDH Dated 06-09-2011 | BSNL W-6 NIT 417421.htm | NIT 41-11127421.doc | A/R & M/O to BSNL Building in Ferozepur SSA for the year 2011-12 (SH: Maintenance of Lawn in TE Building and Staff Colony at Faridkot and Staff Colony at Kotkapura) | 16-09-2011 15:00:00 |
16-09-2011 15:30:00 |
||
| 14/EE/BSNL/CD/PTA/11-12 Dated 02.09.2011 | BSNL-6nit147411.htm | 1112nit147411.pdf | A/R & M/O to single T-V Quarter (GMT Residence) in P&T colony 22No. Phatak Patiala (SH: External & Part Internal Finishing due to change of occupancy). | 13-09-2011 15:00:00 |
13-09-2011 15:30:00 |
||
| 20 /EE/BSNL/CD-II/CHD/SDE(C)/RPR/ 2011-2012 Dated:- 05.09.2011 | W67419.htm | 20 NITropar IIT11-127419.pdf | Environmental works for placement cell room adjoining room no. 109 in transit campus, IIT Ropar. | 13-09-2011 15:00:00 |
13-09-2011 15:30:00 |
||
| 19/EE/BSNL/CD-II/CHD/2011-2012 dated 02-09-2011 | BSNLW-67401.htm | 19NIT11-127401.pdf | Raising of existing compound wall around CSD store (PB) I.A. Phase-VIII Mohali. | 09-09-2011 15:00:00 |
09-09-2011 15:30:00 |
||
| 41/EE/BSNL/CD/ASR/2011-12 Dated 02.09.2011 | NIT7406.htm | Provision of Antistatic7406.doc | “Provision Antistatic flooring in Switch room of Telephone Exchange Building at Kahnuwan | 09-09-2011 15:00:00 |
09-09-2011 15:30:00 |
||
| APPLICATION7407.doc | “Provision Antistatic flooring in Switch room of Telephone Exchange Building at Kahnuwan | 09-09-2011 15:00:00 |
09-09-2011 15:30:00 |
||||
| 40/2011-12/EE/BSNL/CD/LDH Dated 27-08-2011 | BSNL W-6 NIT 407390.htm | NIT 40-11127390.doc | A/R & M/O to BSNL Buildings in Bathinda SSA for the year 2011-12 (SH: Day to Day Maintenance for TE Building in outer area under the jurisdiction of BSNL Civil Sub Division, Bathinda) - RE CALL | 08-09-2011 15:00:00 |
08-09-2011 15:30:00 |
||
| 29/EE/BSNL/CD/JL/NIT/2011-12 Dt.01.09.2011 | NIT297398.htm | TENDERDOCUMENT29.doc.7398docx | Petty Repairs and Painting Operations on Change of Occupancy in BSNL Staff Quarters Under SSA Jalandhar During the Year 2011-12. | 08-09-2011 15:00:00 |
08-09-2011 15:30:00 |
||
| APPLICATION29.doc.7399docx | Petty Repairs and Painting Operations on Change of Occupancy in BSNL Staff Quarters Under SSA Jalandhar During the Year 2011-12. | 08-09-2011 15:00:00 |
08-09-2011 15:30:00 |
||||
| 30/EE/BSNL/CD/JL/NIT/2011-12 Dt.02.09.2011 | NIT307402.htm | TENDERDOCUMENT30.doc.7402docx | Replacement of damaged AC sheet roofing of HT panel room in CTO Building Jalandhar.(2nd Call) | 08-09-2011 15:00:00 |
08-09-2011 15:30:00 |
||
| APPLICATION30.doc.7403docx | Replacement of damaged AC sheet roofing of HT panel room in CTO Building Jalandhar.(2nd Call) | 08-09-2011 15:00:00 |
08-09-2011 15:30:00 |
||||
| 18/EE/BSNL/CD-II/CHD/CSD-PKL/2011-2012 Dated: - 26.08.2011 | w67368.htm | 18 nit pkl7368.pdf | Maintenance of horticulture works in Telephone Exchange compound at Sector-20, Panchkula for the period from September 2011 to August 2012. | 05-09-2011 15:00:00 |
05-09-2011 15:30:00 |
||
| 37/2011-12/EE/BSNL/CD/LDH Dated 18-08-2011 | Corrigendum_NIT 377356.doc | Raising / Lowering of Cable Duct Manhole necks from Samrala Chowk to Jalandhar bye–pass Chowk under area of DET Transport Nagar, due to Six Laning / level raising of NH-I ,G.T. road at Ludhiana | 03-09-2011 15:30:00 |
||||
| 38/2011-12/EE/BSNL/CD/LDH Dated 18-08-2011 | Corrigendum_NIT 387357.doc | Raising of Cable duct manhole necks from T.E. Building Focal Point to G.T. road at Ludhiana | 03-09-2011 15:30:00 |
||||
| 02/EE(C)/CD/Mohali/NIT/2011-12 Dated 25.08.2011 | pile test7362.htm | NIT pile testing7362.pdf | Construction of Academic Block No 2 for Indian institute of Science education & Research at Mohali (Pb) including internal Electrical Installations (SH: providing of test piles and conducting initial | 01-09-2011 15:00:00 |
01-09-2011 15:30:00 |
||
| 37/2011-12/EE/BSNL/CD/LDH Dated 18-08-2011 | BSNL W-6 NIT 377332.htm | NIT 37-11127332.doc | Raising / Lowering of Cable Duct Manhole necks from Samrala Chowk to Jalandhar bye–pass Chowk under area of DET Transport Nagar, due to Six Laning / level raising of NH-I ,G.T. road at Ludhiana | 30-08-2011 15:00:00 |
30-08-2011 15:30:00 |
||
| 38/2011-12/EE/BSNL/CD/LDH Dated 18-08-2011 | BSNL W-6 NIT 387333.htm | NIT 38-11127333.doc | Raising of Cable duct manhole necks from T.E. Building Focal Point to G.T. road at Ludhiana | 30-08-2011 15:00:00 |
30-08-2011 15:30:00 |
||
| 39/2011-12/EE/BSNL/CD/LDH Dated 19-08-2011 | BSNL W-6 NIT 397334.htm | NIT 39-11127334.doc | A/R & M/O to BSNL buildings in Ferozepur SSA for the year 2011-12 (SH: Maintenance and operational jobs in the O/o SDE (Civil) BSNL Civil Sub Division- I, Ferozepur | 29-08-2011 15:00:00 |
29-08-2011 15:30:00 |
||
| Quotation for horticulture work | Quotation horticulture7358.htm | Quotation horticulture7358.pdf | Maintenance of horticulture works in the compound of administrative Block Sector-34, Chandigarh” | 29-08-2011 15:00:00 |
29-08-2011 15:30:00 |
||
| 39/2011-12/EE/BSNL/CD/LDH Dated 19-08-2011 | Corrigendum_NIT 397359.doc | A/R & M/O to BSNL buildings in Ferozepur SSA for the year 2011-12 (SH: Maintenance and operational jobs in the O/o SDE (Civil) BSNL Civil Sub Division- I, Ferozepur | 29-08-2011 15:30:00 |
||||
| Quotation No.3/EE/BSNL/CD/PTA/2011-12 dated 25.08.2011 | Q-37361.htm | Schedule of Quantity Q-37361.pdf | A/R & M/O & minor civil works in GMT chamber at 2nd floor in TE building Leela Bhawan Patiala. | 29-08-2011 15:00:00 |
29-08-2011 15:30:00 |
||
| 40/EE/BSNL/CD/ASR/2011-12 dated 19.08.2011 | NIT7336.htm | Tender Kasel7336.doc | “Provision of Civil works in Rented TE Building at Kasel. | 27-08-2011 15:00:00 |
27-08-2011 15:30:00 |
||
| APPLICATION7337.doc | “Provision of Civil works in Rented TE Building at Kasel. | 27-08-2011 15:00:00 |
27-08-2011 15:30:00 |
||||
| NIT NO. 10/2011-12/EE/BSNL/CD-I/CHD dated 12-8-2011 | 10NIT117310.htm | 10NIT117310.pdf | Construction of 20 Nos Type-III & 8 Nos Scientist apartments at CSIO , Sec-30C , Chandigarh (Balance civil work) | 25-08-2011 15:00:00 |
25-08-2011 15:30:00 |
||
| 17/EE/BSNL/CD-II/Chd/csd/mhl/2011-12 dated 16.8.2011 | NIT 177315.htm | nit labour se7315.pdf | Maintenance and operational jobs in o/o Superintending Engineer( C) BSNL civil circle- II at phase-IV Mohali from September 2011 to April 2012 | 25-08-2011 15:00:00 |
25-08-2011 15:30:00 |
||
| nit labour sde7316.pdf | Maintenance and operational jobs in O/o Sub Divisional Engineer ( C) BSNL civil Sub Division phase- IV Mohali from September 2011 to April 2012 | 25-08-2011 15:00:00 |
25-08-2011 15:30:00 |
||||
| 36/2011-12/EE/BSNL/CD/LDH Dated 16-08-2011 | BSNL W-6 NIT 367317.htm | NIT 36-11127317.doc | A/R & M/O to BSNL buildings in Ferozepur SSA for the year 2011-12 (SH: Maintenance and operational jobs in the O/o SDE (Civil) BSNL Civil Sub Division- II, Ferozepur | 25-08-2011 15:00:00 |
25-08-2011 15:30:00 |
||
| 28/EE/BSNL/CD/JL/NIT/2011-12 Dt.18.08.2011 | NIT287326.htm | TENDERDOCUMENT28.doc.7326docx | Replacement of damaged AC sheet roofing of HT panel room in CTO Building Jalandhar. | 25-08-2011 15:00:00 |
25-08-2011 15:30:00 |
||
| APPLICATION28.doc.7327docx | Replacement of damaged AC sheet roofing of HT panel room in CTO Building Jalandhar. | 25-08-2011 15:00:00 |
25-08-2011 15:30:00 |
||||
| 36/2011-12/EE/BSNL/CD/LDH Dated 16-08-2011 | Corrigendum_NIT 367335.doc | A/R & M/O to BSNL buildings in Ferozepur SSA for the year 2011-12 (SH: Maintenance and operational jobs in the O/o SDE (Civil) BSNL Civil Sub Division- II, Ferozepur | 25-08-2011 15:30:00 |
||||
| 16/EE/BSNL/CD-II/Chd/csd/mhl/2011-12 Dated:08.08.2011 | NIT labour se & sde(6)7285.htm | nit labour se7285.pdf | Maintenance and operational jobs in o/o Superintending Engineer( C) BSNL civil circle- II at phase-IV Mohali from September 2011 to April 2012 | 23-08-2011 15:00:00 |
23-08-2011 15:30:00 |
||
| 16 / EE/BSNL/CD-II/Chd/csd/mhl/2011-12 Dated : 08.08.2011 | nit labour sde7286.pdf | Maintenance and operational jobs in O/o Sub Divisional Engineer ( C) BSNL civil Sub Division phase- IV Mohali from September 2011 to April 2012 | 23-08-2011 15:00:00 |
23-08-2011 15:30:00 |
|||
| 34/2011-12/EE/BSNL/CD/LDH Dated 10-08-2011 | BSNL W-6 NIT 347299.htm | NIT 34-11127299.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-2012 (SH- Maintenance of lawns in GMT Complex and Inspection Quarters at Ferozepur Cantt) | 23-08-2011 15:00:00 |
23-08-2011 15:30:00 |
||
| 16/EE/BSNL/CD-II/Chd/csd/mhl/2011-12 Dated:08.08.2011 | corr7314.htm | Maintenance and operational jobs in o/o Superintending Engineer( C) BSNL civil circle- II at phase-IV Mohali from September 2011 to April 2012 | 23-08-2011 15:30:00 |
||||
| 29/2010-11/EE/BSNL/CD/LDH Dated 05-08-2011 | BSNL W-6 NIT 297277.htm | NIT 29 -11127277.doc | Replacing of damaged floor tile and repairing of false flooring in MSC Switch Room at Kotkapura (RE-CALL) | 20-08-2011 15:00:00 |
20-08-2011 15:30:00 |
||
| 30/2011-12/EE/BSNL/CD/LDH Dated 05-08-2011 | BSNL W-6 NIT 307279.htm | NIT 30-11127279.doc | Renovation to toilet blocks at ground floor & first floor at TE building at Ferozepur | 20-08-2011 15:00:00 |
20-08-2011 15:30:00 |
||
| 31/2011-12/EE/BSNL/CD/LDH Dated 06-08-2011 | BSNL W-6 NIT 317282.htm | NIT 31-11127282.doc | Maintenance of lawns in P & T Colony at Ferozepur Cantt. During the year of 2011-12 | 20-08-2011 15:00:00 |
20-08-2011 15:30:00 |
||
| 32/2011-12/EE/BSNL/CD/LDH Dated 06-08-2011 | BSNL W-6 NIT 327283.htm | NIT 32-11127283.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-12 (SH: Day to Day Maintenance of TE Building/Staff Quarter under the jurisdiction of BSNL Civil Sub Division-I, Ferozepur) | 20-08-2011 15:00:00 |
20-08-2011 15:30:00 |
||
| 26/2011-12/EE/BSNL/CD/LDH Dated 02-08-2011 | Corrigendum_NIT 267302.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-12 (SH: Day to Day Maintenance of TE Building/Staff Quarter under the jurisdiction of BSNL Civil Sub Division-II, Ferozepur) | 20-08-2011 15:30:00 |
||||
| 13/EE/BSNL/CD/PTA/2011-12 dated 11.08.2011 | BSNL-6nit137303.htm | 1112nit137303.pdf | A/R & M/o to TRA offices in rented GPO building Leela Bhawan Patiala. | 19-08-2011 15:00:00 |
19-08-2011 15:30:00 |
||
| 35/2011-12/EE/BSNL/CD/LDH Dated 12-08-2011 | BSNL W-6 NIT 357308.htm | NIT 35-11127308.doc | Construction of New cable trench for carrying HT cables from outside to T.E. building Transport Nagar, Ludhiana (SH: Provision of false ceiling in the entrance hall of IDC at third floor in T.E. bl | 19-08-2011 15:00:00 |
19-08-2011 15:30:00 |
||
| 27/2011-12/EE/BSNL/CD/LDH Dated 03-08-2011 | BSNL W-6 NIT 277264.htm | NIT 27-11127264.doc | A/R & M/O to BSNL Buildings in Bathinda SSA for the year 2011-12 (SH: Day to Day Maintenance for TE Building in outer area under the jurisdiction of BSNL Civil Sub Division, Bathinda) | 18-08-2011 15:00:00 |
18-08-2011 15:30:00 |
||
| 27/EE/BSNL/CD/JL/NIT/2011-12 Dt.09.08.2011 | NIT277297.htm | TENDERDOCUMENT277297.doc | Additions and Alterations for CSC under Project Smile in CTO Complex at Jalandhar | 18-08-2011 15:00:00 |
18-08-2011 15:30:00 |
||
| APPLICATION277298.doc | Additions and Alterations for CSC under Project Smile in CTO Complex at Jalandhar | 18-08-2011 15:00:00 |
18-08-2011 15:30:00 |
||||
| 28/2011-12/EE/BSNL/CD/LDH Dated 04-08-2011 | BSNL W-6 NIT 287267.htm | NIT 28-11127267.doc | A/R & M/O to re-allotted Staff Quarters in Sanchar Colony, BRS Nagar, Ludhiana | 17-08-2011 15:00:00 |
17-08-2011 15:30:00 |
||
| 33/2011-12/EE/BSNL/CD/LDH Dated 09-08-2011 | BSNL W-6 NIT 337296.htm | NIT 33-11127296.doc | A/R & M/O to BSNL buildings in Ludhiana SSA for the year 2011-12 (SH: Up keeping of lawns & misc. civil works in TE compound Transport Nagar, Ludhiana) | 16-08-2011 15:00:00 |
16-08-2011 15:30:00 |
||
| NIT NO. 09/2011-12/EE/BSNL/CD-I/CHD Dated 1-8-2011 | 09NIT11-web page7254.html | 09NIT11-CSIO qtrs7254.pdf | Construction of 20 Nos Type-III & 8 Nos Scientist apartments at CSIO , Sec-30C , Chandigarh (Balance civil work) | 12-08-2011 15:00:00 |
12-08-2011 15:30:00 |
||
| 26/2011-12/EE/BSNL/CD/LDH Dated 02-08-2011 | BSNL W-6 NIT 267258.htm | NIT 26-11127258.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-12 (SH: Day to Day Maintenance of TE Building/Staff Quarter under the jurisdiction of BSNL Civil Sub Division-II, Ferozepur) | 12-08-2011 15:00:00 |
12-08-2011 15:30:00 |
||
| Quotation No.2/EE/BSNL/CD/PTA/2011-12 dated 05.08.2011 | Q-27276.htm | Schedule of quanties Q-27276.pdf | Purchase of computer for use of EE(C), BSNL Civil Division, Patiala. | 11-08-2011 15:00:00 |
11-08-2011 15:30:00 |
||
| NIT No. 24/2011-12/EE/BSNL/CD/LDH Dated:- 30-08-2011 | BSNL-6NIT247243.htm | NIT24-11127243.doc | work A/R &M/o to BSNL Staff quarters for the year 2011-12 ( SH;- Silicon Treatment on Exposed brick work in Quarter No:-3 , Sanchar Colony , BRS Nagar , Ludhiana | 10-08-2011 15:00:00 |
10-08-2011 15:30:00 |
||
| 25/2011-12/EE/BSNL/CD/LDH Dated 02-08-2011 | BSNL W-6 NIT 257257.htm | NIT 25-11127257.doc | Provision of Water supply inlet points for Installation of Emersion type AC plant at OCB-Tax switch room, Bharat Nagar Ludhiana | 10-08-2011 15:00:00 |
10-08-2011 15:30:00 |
||
| EE/BSNL/CD/JL/NIQ/03/2011-12 Dt.04.08.2011 | NIQ 037268.htm | NIQ03SCH7268.doc | Infrastructure for Defence Project (NFS):-“Civil works for Composite Node Type-2 at Kapurthala”(SH:Soil Investigation). | 09-08-2011 15:00:00 |
09-08-2011 15:30:00 |
||
| EE/BSNL/CD/JL/NIQ/04/2011-12 Dt.04.08.2011 | NIQ 047269.htm | NIQ04SCH7269.doc | Infrastructure for Defence Project (NFS):-“Civil works for Access Node A1 Type at Jalandhar”(SH:Soil Investigation). | 09-08-2011 15:00:00 |
09-08-2011 15:30:00 |
||
| 39/EE/BSNL/CD/ASR/2011-12 dated 29.07.2011 | NIT7239.htm | Tender7239.doc | “Raising of RSU Building Compound at Gurdaspur” | 06-08-2011 15:00:00 |
06-08-2011 15:30:00 |
||
| APPLICATION7240.doc | “Raising of RSU Building Compound at Gurdaspur” | 06-08-2011 15:00:00 |
06-08-2011 15:30:00 |
||||
| 37/EE/BSNL/CD/ASR/2011-12 dated 27.07.2011 | NIT Operation7224.htm | Tender Operational7224.doc | “A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2011 (SH : Maintenance & Operational jobs in O/o the EE (C) & SDE (C) PH-II,Amritsar | 04-08-2011 15:00:00 |
04-08-2011 15:30:00 |
||
| Application Operational7225.doc | “A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2011 (SH : Maintenance & Operational jobs in O/o the EE (C) & SDE (C) PH-II,Amritsar | 04-08-2011 15:00:00 |
04-08-2011 15:30:00 |
||||
| 38/EE/BSNL/CD/ASR/2011-12 dated 27.07.2011 | NIT Resto7226.htm | Tender Restoration7226.doc | “Provision of Tube wll at BSNL Compound Guru Ravi Das Marg, Amritsar (SH:- Misc. restoration civil works) | 04-08-2011 15:00:00 |
04-08-2011 15:30:00 |
||
| Application restoration7227.doc | “Provision of Tube wll at BSNL Compound Guru Ravi Das Marg, Amritsar (SH:- Misc. restoration civil works) | 04-08-2011 15:00:00 |
04-08-2011 15:30:00 |
||||
| 26/EE/BSNL/CD/JL/NIT/2011-12 Dt.29.07.2011 | NIT267237.htm | TENDERDOCUMENT267237.doc | Day to Day Repairs and Maintenance Works in Staff Quarters at J P Nagar, Saraswati Vihar, B.S. Colony and Guru Amar Dass Nagar under CSD-II Jalandhar during the Year 2011-12 (4th Call). | 04-08-2011 15:00:00 |
04-08-2011 15:30:00 |
||
| APPLICATION267238.doc | Day to Day Repairs and Maintenance Works in Staff Quarters at J P Nagar, Saraswati Vihar, B.S. Colony and Guru Amar Dass Nagar under CSD-II Jalandhar during the Year 2011-12 (4th Call). | 04-08-2011 15:00:00 |
04-08-2011 15:30:00 |
||||
| 37/EE/BSNL/CD/ASR/2011-12 dated 27.07.2011 | Corrigendum RESTRO7244.doc | “A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2011 (SH : Maintenance & Operational jobs in O/o the EE (C) & SDE (C) PH-II,Amritsar | 04-08-2011 15:30:00 |
||||
| 38/EE/BSNL/CD/ASR/2011-12 dated 27.07.2011 | Corrigendum RESTRO7245.doc | “Provision of Tube wll at BSNL Compound Guru Ravi Das Marg, Amritsar (SH:- Misc. restoration civil works) | 04-08-2011 15:30:00 |
||||
| Replacing of damaged floor tile and repairing of false flooring in MSC Switch Room at Kotkapura | BSNL W 67194.htm | NIT 22 -11127194.doc | Replacing of damaged floor tile and repairing of false flooring in MSC Switch Room at Kotkapura | 02-08-2011 15:00:00 |
02-08-2011 15:30:00 |
||
| NIT No. 23/2011-12/EE/BSNL/CD/LDHDated:-21-07-2011 | BSNLW-6-NIT237195.htm | NIT 23-11127195.doc | A/R & M/O TO BSNL BUILDINGS IN LDH SSA FOR THE YEAR 2011-12 (DAY TO DAY MAINTAINCE FOR BSNL TE BULIDING IN OUTER AERA WITH IN THE JURISDICTION OF BSNL CIVIL SUB DIV- ll. LUDHIANA) | 02-08-2011 15:00:00 |
02-08-2011 15:30:00 |
||
| Corrigendum | Corrigendum NIT 237216.doc | A/R & M/O TO BSNL BUILDINGS IN LDH SSA FOR THE YEAR 2011-12 (DAY TO DAY MAINTAINCE FOR BSNL TE BULIDING IN OUTER AERA WITH IN THE JURISDICTION OF BSNL CIVIL SUB DIV- ll. LUDHIANA) | 02-08-2011 15:30:00 |
||||
| 31/EE/BSNL/CD/ASR/2011-12 dated 18.07.2011 | Corrigendum painting7208.htm | Painting to BSNL Staff Quarters in Amritsar SSA on change of occupancy during the year 2011-12 | 30-07-2011 15:30:00 |
||||
| 32/EE/BSNL/CD/ASR/2011-12 dated 18.07.2011 | Corrigendum painting7210.htm | “Provision of Rain Water Harvesting in old Trunk Exchange compound Albert road Amritsar. | 30-07-2011 15:30:00 |
||||
| 12/EE/BSNL/CD/PTA/2011-12 dated 22.07.2011 | BSNL-6nit127213.htm | 1112nit127213.pdf | Hiring of Vehicle for use of Executive Engineer(Civil), BSNL Civil Division, Patiala from the month of August 2011 to March 2012. | 30-07-2011 15:00:00 |
30-07-2011 15:30:00 |
||
| 33/EE/BSNL/CD/ASR/2011-12 dated 22.07.2011 | NIT Bldg7200.htm | Tender doc bldg7200.doc | of “Day to day Maintenance of BSNL buildings in the area under SDCA Ajnala, SDCA Rayya, DET(Outer area) & DET(City-II) during the year 2011-2012 | 29-07-2011 15:00:00 |
29-07-2011 15:30:00 |
||
| APPLICATION bldg7201.doc | of “Day to day Maintenance of BSNL buildings in the area under SDCA Ajnala, SDCA Rayya, DET(Outer area) & DET(City-II) during the year 2011-2012 | 29-07-2011 15:00:00 |
29-07-2011 15:30:00 |
||||
| 34/EE/BSNL/CD/ASR/2011-12 dated 22.07.2011 | NIT S qtrs7202.htm | Tender doc staff Qtr7202.doc | Day to day Maintenance of BSNL Staff Quarters in the area under SDCA Ajnala, SDCA Rayya, DET(Outer area) & DET(City-II) during the year 2011-2012 | 29-07-2011 15:00:00 |
29-07-2011 15:30:00 |
||
| APPLICATION S Qtr7203.doc | Day to day Maintenance of BSNL Staff Quarters in the area under SDCA Ajnala, SDCA Rayya, DET(Outer area) & DET(City-II) during the year 2011-2012 | 29-07-2011 15:00:00 |
29-07-2011 15:30:00 |
||||
| 35/EE/BSNL/CD/ASR/2011-12 dated 22.07.2011 | NIT Bldg7204.htm | Tender SDEII bldg7204.doc | “Day to day Maintenance of BSNL buildings in the area under SDCA Tarntarn,SDCA Patti, SDCA Goindwal Sahib, DET (City-I) & DET (City-III) during the year 2011-2012” | 29-07-2011 15:00:00 |
29-07-2011 15:30:00 |
||
| APPLICATION bldg7205.doc | “Day to day Maintenance of BSNL buildings in the area under SDCA Tarntarn,SDCA Patti, SDCA Goindwal Sahib, DET (City-I) & DET (City-III) during the year 2011-2012” | 29-07-2011 15:00:00 |
29-07-2011 15:30:00 |
||||
| 36/EE/BSNL/CD/ASR/2011-12 dated 22.07.2011 | NIT S Qtrs7206.htm | Tender SDEII S Qtr7206.doc | Day to day Maintenance of BSNL Staff Quarters in the area under SDCA Tarntarn,SDCA Patti, SDCA Goindwal Sahib, DET (City-I) & DET (City-III) during the year 2011-2012” | 29-07-2011 15:00:00 |
29-07-2011 15:30:00 |
||
| APPLICATION Qtr7207.doc | Day to day Maintenance of BSNL Staff Quarters in the area under SDCA Tarntarn,SDCA Patti, SDCA Goindwal Sahib, DET (City-I) & DET (City-III) during the year 2011-2012” | 29-07-2011 15:00:00 |
29-07-2011 15:30:00 |
||||
| 35/EE/BSNL/CD/ASR/2011-12 dated 22.07.2011 | Tender SDEII bldg7211.doc | “Day to day Maintenance of BSNL buildings in the area under SDCA Tarntarn,SDCA Patti, SDCA Goindwal Sahib, DET (City-I) & DET (City-III) during the year 2011-2012” | 29-07-2011 15:30:00 |
||||
| 36/EE/BSNL/CD/ASR/2011-12 dated 22.07.2011 | Tender SDEII S Qtr7212.doc | Day to day Maintenance of BSNL Staff Quarters in the area under SDCA Tarntarn,SDCA Patti, SDCA Goindwal Sahib, DET (City-I) & DET (City-III) during the year 2011-2012” | 29-07-2011 15:30:00 |
||||
| 21/EE/BSNL/CD/JL/NIT/2011-12 Dt.20.07.2011 | NIT217172.htm | TENDERDOCUMENT21.doc.7172docx | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under BSNL Civil Sub Division- I, Jalandhar.” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||
| APPLICATION21.doc.7173docx | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under BSNL Civil Sub Division- I, Jalandhar.” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||||
| 22/EE/BSNL/CD/JL/NIT/2011-12 Dt.20.07.2011 | NIT227174.htm | TENDERDOCUMENT22.doc.7174docx | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under BSNL Civil Sub Division, Hoshiarpur.” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||
| APPLICATION22.doc.7175docx | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under BSNL Civil Sub Division, Hoshiarpur.” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||||
| A/R & M/O TO BSNL BUILDINGS IN LDH SSA FOR THE YEAR 2011-12 (DAY TO DAY MAINTAINCE FOR BSNL STAFF Q | NIT 21-11127176.htm | NIT 21-11127176.doc | A/R & M/O TO BSNL BUILDINGS IN LDH SSA FOR THE YEAR 2011-12 (DAY TO DAY MAINTAINCE FOR BSNL STAFF QUARTERS IN OUTER AERA WITH IN THE JURISDICTION OF BSNL CIVIL SUB DIV- ll. LUDHIANA) | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||
| 23/EE/BSNL/CD/JL/NIT/2011-12 Dt.20.07.2011 | NIT237177.htm | TENDERDOCUMENT23.doc.7177docx | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under the jurisdiction of BSNL Civil Sub Division-II, Jalandhar (Inner Area i.e. Local Jalandhar).” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||
| APPLICATION23.doc.7178docx | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under the jurisdiction of BSNL Civil Sub Division-II, Jalandhar (Inner Area i.e. Local Jalandhar).” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||||
| 24/EE/BSNL/CD/JL/NIT/2011-12 Dt.20.07.2011 | NIT247180.htm | TENDERDOCUMENT24.doc.7180docx | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under the jurisdiction of BSNL Civil Sub Division-II, Jalandhar (Outer Area).” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||
| APPLICATION24.doc.7181docx | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under the jurisdiction of BSNL Civil Sub Division-II, Jalandhar (Outer Area).” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||||
| 21/EE/BSNL/CD/JL/NIT/2011-12 Dt.20.07.2011 | Corrigendum NIT217184.htm | Corrigendum NIT21.doc7184.doc | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under BSNL Civil Sub Division- I, Jalandhar.” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||
| 22/EE/BSNL/CD/JL/NIT/2011-12 Dt.20.07.2011 | Corrigendum NIT227185.htm | Corrigendum NIT22.doc7185.doc | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under BSNL Civil Sub Division, Hoshiarpur.” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||
| 23/EE/BSNL/CD/JL/NIT/2011-12 Dt.20.07.2011 | Corrigendum NIT237186.htm | Corrigendum NIT23.doc7186.doc | “Cleaning of underground /overhead water storage tanks in BSNL Buildings under the jurisdiction of BSNL Civil Sub Division-II, Jalandhar (Inner Area i.e. Local Jalandhar).” | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||
| 25/EE/BSNL/CD/JL/NIT/2011-12 Dt.21.07.2011 | NIT257191.htm | TENDERDOCUMENT25.doc.7191docx | Day to Day Repairs and Maintenance Works in Staff Quarters at J P Nagar, Saraswati Vihar, B.S. Colony and Guru Amar Dass Nagar under CSD-II Jalandhar during the Year 2011-12 (3rd Call). | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||
| APPLICATION25.doc.7192docx | Day to Day Repairs and Maintenance Works in Staff Quarters at J P Nagar, Saraswati Vihar, B.S. Colony and Guru Amar Dass Nagar under CSD-II Jalandhar during the Year 2011-12 (3rd Call). | 28-07-2011 15:00:00 |
28-07-2011 15:30:00 |
||||
| 11/EE/BSNL/CD/PTA/2011-12 dated 18.07.2011. (4th Call) | BSNL-6nit117165.htm | 1112nit117165.pdf | Construction of fibre sheet roof toilet with provision of underground soak pit chamber in rented T.E. building at Jakhwali. | 27-07-2011 15:00:00 |
27-07-2011 15:30:00 |
||
| :- Name of work:- A/R & M/O TO BSNL BUILDINGS IN FZR SSA FOR THE YEAR 2011-12 (DAY TO DAY MAINTAINCE | NIT 20-11127166.htm | NIT 20-11127166.doc | A/R & M/O TO BSNL BUILDINGS IN FZR SSA FOR THE YEAR 2011-12 (DAY TO DAY MAINTAINCE FOR BSNL BUILDINGS UNDER THE JURISDICTION OF BSNL CIVIL SUB DIV. MOGA) | 27-07-2011 15:00:00 |
27-07-2011 15:30:00 |
||
| NIT NO. 08/2011-12/EE/BSNL/CD-I/CHD Dated 13-7-2011 | 08NIT117133.htm | 08NIT117133.pdf | Construction of 20 No Type-III & 8 Nos Scientist apartments at CSIO , Sec-30C , Chandigarh (Balance civil Work).” | 25-07-2011 15:00:00 |
25-07-2011 15:30:00 |
||
| 31/EE/BSNL/CD/ASR/2011-12 dated 18.07.2011 | NIT7159.htm | Tender7159.doc | Painting to BSNL Staff Quarters in Amritsar SSA on change of occupancy during the year 2011-12 | 25-07-2011 15:00:00 |
25-07-2011 15:30:00 |
||
| APPLICATION7160.doc | Painting to BSNL Staff Quarters in Amritsar SSA on change of occupancy during the year 2011-12 | 25-07-2011 15:00:00 |
25-07-2011 15:30:00 |
||||
| 32/EE/BSNL/CD/ASR/2011-12 dated 18.07.2011 | NIT7161.htm | Tender Doc7161.doc | “Provision of Rain Water Harvesting in old Trunk Exchange compound Albert road Amritsar. | 25-07-2011 15:00:00 |
25-07-2011 15:30:00 |
||
| APPLICATION7162.doc | “Provision of Rain Water Harvesting in old Trunk Exchange compound Albert road Amritsar. | 25-07-2011 15:00:00 |
25-07-2011 15:30:00 |
||||
| 30/EE/BSNL/CD/ASR/2011-12 dated 13.07.2011 | NIT7125.htm | Tender Doc7125.doc | “Reconstruction of Compound Wall of Telephone Exchange Compound Goindwal | 23-07-2011 15:00:00 |
23-07-2011 15:30:00 |
||
| APPLICATION7126.doc | “Reconstruction of Compound Wall of Telephone Exchange Compound Goindwal | 23-07-2011 15:00:00 |
23-07-2011 15:30:00 |
||||
| Corri to nit09/EE/BSNL/CD/PTA/2011-12 dated 21.07.2011 | 1112corrinit097199.htm | 1112corrinit097199.pdf | Dismantling of dustbin and provision of flooring for increasing thespace of existing cycle stand in front of T.E building Leela Bhawan at Patiala. | 23-07-2011 15:00:00 |
23-07-2011 15:30:00 |
||
| Replacement of damaged flooring of back side staircase from basement upto Ist Floor ,TE building at | BSNL W-6 NIT 197127.htm | NIT 19-11127127.doc | Replacement of damaged flooring of back side staircase from basement upto Ist Floor ,TE building at Bharat Nagar Ludhiana. | 22-07-2011 15:00:00 |
22-07-2011 15:30:00 |
||
| 09/EE/BSNL/CD/PTA/2011-12 dated 14.07.2011 | BSNL-6nit097136.htm | 1112nit097136.pdf | Dismantling of dustbin and provision of flooring for increasing the space of existing cycle stand in front of T.E building Leela Bhawan at Patiala. | 22-07-2011 15:00:00 |
22-07-2011 15:30:00 |
||
| 10/EE/BSNL/CD/PTA/2011-12 Dated 14.07.2011 (2nd Call) | BSNL-6nit107137.htm | 1112nit107137.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS IN THE JURISDICTION OF DET FATEHGARH (SIRHIND)/ SAMANA/NABHA/ MANDI GOBINDGARH UNDER PATIALA SSA UPTO NOVEMBER 2011. | 22-07-2011 15:00:00 |
22-07-2011 15:30:00 |
||
| 20/EE/BSNL/CD/JL/NIT/2011-12 Dt.15.07.2011 | NIT207146.htm | TENDERDOCUMENT20.doc.7146docx | “Day to day repairs and maintenance works in TE Buildings and Admn. Buildings under BSNL CSD-II, Jalandhar during the Year 2011-12.” | 22-07-2011 15:00:00 |
22-07-2011 15:30:00 |
||
| APPLICATION20.doc.7147docx | “Day to day repairs and maintenance works in TE Buildings and Admn. Buildings under BSNL CSD-II, Jalandhar during the Year 2011-12.” | 22-07-2011 15:00:00 |
22-07-2011 15:30:00 |
||||
| 26/EE/BSNL/CD/ASR/2011-12 dated 12.07.2011 | NIT Bldg7114.htm | Tender doc bldg7114.doc | “Day to day Maintenance of BSNL buildings in the area under SDCA Ajnala, SDCA Rayya, DET(Outer area) & DET(City-II) during the year 2011-2012 | 21-07-2011 15:00:00 |
21-07-2011 15:30:00 |
||
| APPLICATION bldg7115.doc | “Day to day Maintenance of BSNL buildings in the area under SDCA Ajnala, SDCA Rayya, DET(Outer area) & DET(City-II) during the year 2011-2012 | 21-07-2011 15:00:00 |
21-07-2011 15:30:00 |
||||
| 27/EE/BSNL/CD/ASR/2011-12 dated 12.07.2011 | NIT Qtrs7116.htm | Tender doc staff Qtr7116.doc | “Day to day Maintenance of BSNL Staff Quarters in the area under SDCA Ajnala, SDCA Rayya, DET(Outer area) & DET(City-II) during the year 2011-2012 | 21-07-2011 15:00:00 |
21-07-2011 15:30:00 |
||
| APPLICATION S Qtr7117.doc | “Day to day Maintenance of BSNL Staff Quarters in the area under SDCA Ajnala, SDCA Rayya, DET(Outer area) & DET(City-II) during the year 2011-2012 | 21-07-2011 15:00:00 |
21-07-2011 15:30:00 |
||||
| 28/EE/BSNL/CD/ASR/2011-12 dated 12.07.2011 | NIT Bldg7118.htm | Tender SDEII bldg7118.doc | “Day to day Maintenance of BSNL buildings in the area under SDCA Tarntarn,SDCA Patti, SDCA Goindwal Sahib, DET (City-I) & DET (City-III) during the year 2011-2012” | 21-07-2011 15:00:00 |
21-07-2011 15:30:00 |
||
| APPLICATION bldg7119.doc | “Day to day Maintenance of BSNL buildings in the area under SDCA Tarntarn,SDCA Patti, SDCA Goindwal Sahib, DET (City-I) & DET (City-III) during the year 2011-2012” | 21-07-2011 15:00:00 |
21-07-2011 15:30:00 |
||||
| 29/EE/BSNL/CD/ASR/2011-12 dated 12.07.2011 | NIT Qtrs7120.htm | Tender SDEII S Qtr7120.doc | “Day to day Maintenance of BSNL Staff Quarters in the area under SDCA Tarntarn,SDCA Patti, SDCA Goindwal Sahib, DET (City-I) & DET (City-III) during the year 2011-2012” | 21-07-2011 15:00:00 |
21-07-2011 21:30:00 |
||
| APPLICATION Qtr7121.doc | “Day to day Maintenance of BSNL Staff Quarters in the area under SDCA Tarntarn,SDCA Patti, SDCA Goindwal Sahib, DET (City-I) & DET (City-III) during the year 2011-2012” | 21-07-2011 15:00:00 |
21-07-2011 15:30:00 |
||||
| 15/EE/BSNL/CD-II/CHD/CSD-PKL/2011-2012 dated 12.07.2011 | w-67124.htm | 15NIT11-127124.pdf | Day to day maintenance in the area under the jurisdiction of SDE(C) CSD Panchkula for the period July 2011 to March 2012. | 21-07-2011 15:00:00 |
21-07-2011 15:30:00 |
||
| 19/EE/BSNL/CD/JL/NIT/2011-12 Dt.14.07.2011 | NIT197138.htm | TENDERDOCUMENT19.doc.7138docx | “Dismantling Roof Top Tower and BTS shelter at DAVIET Kabir Nagar, Jalandhar.” | 20-07-2011 15:00:00 |
20-07-2011 15:30:00 |
||
| APPLICATION19.doc.7139docx | “Dismantling Roof Top Tower and BTS shelter at DAVIET Kabir Nagar, Jalandhar.” | 20-07-2011 15:00:00 |
20-07-2011 15:30:00 |
||||
| 14 / EE/BSNL/CD-II/Chd/csd/mhl/2011-12 Dated : 11.07.2011. | NIT monsoon7112.htm | monsoon7112.pdf | Preventive maintenance before monsoon in deptt. Bldg/Qtrs and cleaning of under ground water tanks in S.A.S. Nagar(Mohali) | 19-07-2011 15:00:00 |
19-07-2011 15:30:00 |
||
| 18/EE/BSNL/CD/JL/NIT/2011-12 Dt.05.07.2011 | NIT187082.htm | TENDERDOCUMENT18.doc.7082docx | “Day to Day Repairs and Maintenance Works in Staff Quarters at J P Nagar, Saraswati Vihar, B.S. Colony and Guru Amar Dass Nagar under CSD-II Jalandhar during the Year 2011-12.” | 18-07-2011 15:00:00 |
18-07-2011 15:30:00 |
||
| APPLICATION18.doc.7083docx | “Day to Day Repairs and Maintenance Works in Staff Quarters at J P Nagar, Saraswati Vihar, B.S. Colony and Guru Amar Dass Nagar under CSD-II Jalandhar during the Year 2011-12.” | 18-07-2011 15:00:00 |
18-07-2011 15:30:00 |
||||
| 16/EE/BSNL/CD/JL/NIT/2011-12 Dt.05.07.2011 | NIT167078.htm | TENDERDOCUMENT167078.doc | Infrastructure for Defence Project (NFS):-“Civil works for Composite Node Type-2 at Kapurthala”. | 16-07-2011 15:00:00 |
16-07-2011 15:30:00 |
||
| APPLICATION167079.doc | Infrastructure for Defence Project (NFS):-“Civil works for Composite Node Type-2 at Kapurthala”. | 16-07-2011 15:00:00 |
16-07-2011 15:30:00 |
||||
| 08/EE/BSNL/CD/PTA/2011-12 dated 08.07.2011 (2nd call) | BSNL-6nit087107.htm | 1112nit087107.pdf | Plantation of trees in BSNL buildings in SSA Patiala. | 16-07-2011 15:00:00 |
16-07-2011 15:30:00 |
||
| 17/EE/BSNL/CD/JL/NIT/2011-12 Dt.05.07.2011 | NIT177080.htm | TENDERDOCUMENT17.doc.7080docx | “Day to Day Repairs and Maintenance Works in BSNL Staff Quarters, Shastri Market Jalandhar during the Year 2011-12.” | 15-07-2011 15:00:00 |
15-07-2011 15:30:00 |
||
| APPLICATION17.doc.7081docx | “Day to Day Repairs and Maintenance Works in BSNL Staff Quarters, Shastri Market Jalandhar during the Year 2011-12.” | 15-07-2011 15:00:00 |
15-07-2011 15:30:00 |
||||
| 25/EE/BSNL/CD/ASR/2011-12 dated 06.07.2011 | NIT7099.htm | Tender7099.doc | Painting to BSNL Staff Quarters in Amritsar SSA on change of occupancy during the year 2011-12 | 15-07-2011 15:00:00 |
15-07-2011 15:30:00 |
||
| APPLICATION7100.doc | Painting to BSNL Staff Quarters in Amritsar SSA on change of occupancy during the year 2011-12 | 15-07-2011 15:00:00 |
15-07-2011 15:30:00 |
||||
| 20/EE/BSNL/CD/ASR/11-12 Dated:- 30.06.2011 | NIT7054.htm | NIT Access Node-Asr_7054.doc | Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-1 Type at Amritsar (Punjab).” | 11-07-2011 15:00:00 |
11-07-2011 15:30:00 |
||
| 20/EE/BSNL/CD/ASR/11-12 Dated:- 30.06.2011 | APPLICATION7055.doc | Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-1 Type at Amritsar (Punjab).” | 11-07-2011 15:00:00 |
11-07-2011 15:30:00 |
|||
| 21/EE/BSNL/CD/ASR/11-12 Dated:- 30.06.2011 | NIT7056.htm | NITBeas_7056.doc | Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-2 Type at Beas (Punjab).” | 11-07-2011 15:00:00 |
11-07-2011 15:30:00 |
||
| 21/EE/BSNL/CD/ASR/11-12 Dated:- 30.06.2011 | APPLICATION7057.doc | Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-2 Type at Beas (Punjab).” | 11-07-2011 15:00:00 |
11-07-2011 15:30:00 |
|||
| 22/EE/BSNL/CD/ASR/11-12 Dated:- 30.06.2011 | NIT7058.htm | NIT Access Node-Tibri_7058.doc | Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-2 Type at Tibri, Dist. Gurdaspur (Punjab).” | 11-07-2011 15:00:00 |
11-07-2011 15:30:00 |
||
| 22/EE/BSNL/CD/ASR/11-12 Dated:- 30.06.2011 | APPLICATION7059.doc | Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-2 Type at Tibri, Dist. Gurdaspur (Punjab).” | 11-07-2011 15:00:00 |
11-07-2011 15:30:00 |
|||
| 18/2011-12/EE/BSNL/CD/LDH | NIT187062.html | Tenderdocument187062.doc | Repair and painting of TE building at Transport Nagar, Ludhiana. | 11-07-2011 15:00:00 |
11-07-2011 15:30:00 |
||
| 23/EE/BSNL/CD/ASR/2011-12 dated 01.07.2011 | NIT Restro7063.htm | Tender Resto7063.doc | Provision of Tubewell in T.E. compound Albert road Amritsar . (SH:-Restoration works) | 08-07-2011 15:00:00 |
08-07-2011 15:30:00 |
||
| 23/EE/BSNL/CD/ASR/2011-12 dated 01.07.2011 | APPLICATION resto7064.doc | Provision of Tubewell in T.E. compound Albert road Amritsar . (SH:-Restoration works) | 08-07-2011 15:00:00 |
08-07-2011 15:30:00 |
|||
| 24/EE/BSNL/CD/ASR/2011-12 dated 01.07.2011 | NIT 2G7066.htm | Tender 2G7066.doc | Provision of sign boards for GB and RT towers in SSA Amritsar. (SH:-Sign boards on new BTS (2G and 3G) towers.) | 08-07-2011 15:00:00 |
08-07-2011 15:30:00 |
||
| APPLICATION 2G7067.doc | Provision of sign boards for GB and RT towers in SSA Amritsar. (SH:-Sign boards on new BTS (2G and 3G) towers.) | 08-07-2011 15:00:00 |
08-07-2011 15:30:00 |
||||
| 07/EE/BSNL/CD/PTA/2011-12 dated 24.06.2011 | BSNL-6nit077027.htm | 1112nit077027.pdf | Plantation of trees in BSNL buildings in SSA Patiala. | 07-07-2011 15:00:00 |
07-07-2011 15:30:00 |
||
| 17/2011-12/EE/BSNL/CD/LDH | NIT177061.html | Tenderdocument177061.doc | Face lifting of entrance lobby including the staircase upto top floor and top floor bathroom in TE building at Transport Nagar, Ludhiana. | 07-07-2011 15:00:00 |
07-07-2011 15:30:00 |
||
| Quotation | Quotation7076.htm | Quotation Protein7076.pdf | Construction of Advance Centre for Protein informatics, Science, Engineering and Technology in IMTECH, Sector 39, Chandigarh (SH: Providing and fixing Mural on external wall) | 07-07-2011 15:00:00 |
07-07-2011 15:30:00 |
||
| 19/EE/BSNL/CD/ASR/2011-12 dated 28.06.2011 | NIT7039.htm | Tender Doc7039.doc | Making Connection to Main Boring at BSNL Compound Guru Ravi Dass Marg, Amritsar | 05-07-2011 15:00:00 |
05-07-2011 15:30:00 |
||
| APPLICATION7040.doc | Making Connection to Main Boring at BSNL Compound Guru Ravi Dass Marg, Amritsar | 05-07-2011 15:00:00 |
05-07-2011 15:30:00 |
||||
| NIT No. 01/EE(C)/CD/Mohali/NIT/ 2011-12 dated 13-06-2011 | 01NIT6979.htm | tender new6979.pdf | Construction of Academic Block No. 2 for Indian Institute of Science education &Research at Mohali (Pb) including internal Electrical Installations | 04-07-2011 15:00:00 |
04-07-2011 15:30:00 |
||
| 13/EE/BSNL/CD-II/CHD/SDE(C)/RPR/ 2011-2012 Dated:- 25.06.2011 | w67036.htm | 13 NITchajja7036.pdf | Repairs to damaged chajjas in old TE building in TRA complex at Ropar. | 04-07-2011 15:00:00 |
04-07-2011 15:30:00 |
||
| NIT No. 01/EE(C)/CD/Mohali/NIT/ 2011-12 dated 13-06-2011 | letter7046.htm | Construction of Academic Block No. 2 for Indian Institute of Science education &Research at Mohali (Pb) including internal Electrical Installations | 04-07-2011 15:30:00 |
||||
| NIT No: 12 /EE/BSNL/CD/CHD/2011-12 Dated: 24-06-2011. | Copy of CableductmanholeNIT7029.htm | CableductmanholeNIT7029.pdf | Lowering of height of manholes coming in road widening area from PCL chowk to Amb Saheb Gurudwara S.A.S. Nagar (Mohali) | 02-07-2011 15:00:00 |
02-07-2011 15:30:00 |
||
| 18/EE/BSNL/CD/ASR/2011-12 dated 25.06.2011 | NIT7033.htm | Tender Doc7033.doc | “Provision of tube well at BSNL Compound Guru Ravi Dass Marg, Amritsar ( SH:- Making Connection to Main Boring) | 02-07-2011 15:00:00 |
02-07-2011 15:30:00 |
||
| APPLICATION7034.doc | “Provision of tube well at BSNL Compound Guru Ravi Dass Marg, Amritsar ( SH:- Making Connection to Main Boring) | 02-07-2011 15:00:00 |
02-07-2011 15:30:00 |
||||
| Corrigendum | CorrigenduCSD I7038.doc | “Provision of tube well at BSNL Compound Guru Ravi Dass Marg, Amritsar ( SH:- Making Connection to Main Boring) | 02-07-2011 15:30:00 |
||||
| 14/EE/BSNL/CD/ASR/2011-12 dated 21.06.2011 | NIT SQ7012.htm | Tender Staff Quarters Batala7012.doc | Day to Day maintenance of BSNL Staff Quarters in the area under SDCA Batala in Pathankot SSA during the year 2011-12. | 29-06-2011 15:00:00 |
29-06-2011 15:30:00 |
||
| APPLICATION SQ Batala7013.doc | Day to Day maintenance of BSNL Staff Quarters in the area under SDCA Batala in Pathankot SSA during the year 2011-12. | 29-06-2011 15:00:00 |
29-06-2011 15:30:00 |
||||
| 15/EE/BSNL/CD/ASR/2011-12 dated 21.06.2011 | NIT Bldg7014.htm | Tender Bldg Batala7014.doc | “Day to Day maintenance of BSNL Buildings in the area under SDCA Batala in Pathankot SSA during the year 2011-12. | 29-06-2011 15:00:00 |
29-06-2011 15:30:00 |
||
| APPLICATION bldg Batala7015.doc | “Day to Day maintenance of BSNL Buildings in the area under SDCA Batala in Pathankot SSA during the year 2011-12. | 29-06-2011 15:00:00 |
29-06-2011 15:30:00 |
||||
| 16/EE/BSNL/CD/ASR/2011-12 dated 21.06.2011 | NIT Cleaining7016.htm | Tender cleaning of Water Tank7016.doc | “Cleaning of water Storage tanks during the year 2011-12 (Phase-I) for area under SDCA Rayya, Ajnala & Amritsar local buildings under BSNL Civil Sub Division – I Amritsar. | 29-06-2011 15:00:00 |
29-06-2011 15:30:00 |
||
| APPLICATION cleaning of Tank7017.doc | “Cleaning of water Storage tanks during the year 2011-12 (Phase-I) for area under SDCA Rayya, Ajnala & Amritsar local buildings under BSNL Civil Sub Division – I Amritsar. | 29-06-2011 15:00:00 |
29-06-2011 15:30:00 |
||||
| 17/EE/BSNL/CD/ASR/2011-12 dated 21.06.2011 | NIT Shifting7018.htm | Tender Shifting SDE-II7018.doc | “Shifting of DET (I) office to E-2 Staff Quarter at Albert Road Amritsar. | 29-06-2011 15:00:00 |
29-06-2011 15:30:00 |
||
| APPLICATION Shifting7019.doc | “Shifting of DET (I) office to E-2 Staff Quarter at Albert Road Amritsar. | 29-06-2011 15:00:00 |
29-06-2011 15:30:00 |
||||
| 06/EE/BSNL/CD/PTA/2011-12 dated 16.06.2011 | BSNL-6nit067000.htm | 1112nit067000.pdf | DAY TO DAY MAINTENANCE OF BSNL BUILDINGS IN THE JURISDICTION OF DET FATEHGARH (SIRHIND)/ SAMANA/ NABHA/ MANDI GOBINDGARH UNDER PATIALA SSA UPTO NOVEMBER 2011. | 27-06-2011 15:00:00 |
27-06-2011 15:30:00 |
||
| 05/EE/BSNL/CD/PTA/2011-12 dated 13.06.2011 | BSNL-6nit056973.htm | 1112nit056973.pdf | Civil works in open space in TE compound at Meemsa to accommodate BSNL Store/ Dump from Akoi Sahib. | 24-06-2011 15:00:00 |
24-06-2011 15:30:00 |
||
| 13/EE/BSNL/CD/ASR/2011-12dated 06.06.2011 | NIT6937.htm | Tender Doc Cable Duct DEP-I ASR6937.doc | “Raising of Manhole Necks and Sealing of Cable duct Chambers in area under DEP-I Amritsar. | 23-06-2011 15:00:00 |
23-06-2011 15:30:00 |
||
| APPLICATION6938.doc | “Raising of Manhole Necks and Sealing of Cable duct Chambers in area under DEP-I Amritsar. | 23-06-2011 15:00:00 |
23-06-2011 15:30:00 |
||||
| 15/EE/BSNL/CD/JL/NIT/2011-12 Dated: 14.06.2011 | NIT156987.htm | TENDERDOCUMENT15.doc.6987docx | Day to Day Repairs and Maintenance Works in BSNL Staff Quarters under the jurisdiction of DE(City) and DE(Garhshankar) in Hoshiarpur SSA during the Year 2011-12 | 23-06-2011 15:00:00 |
23-06-2011 15:30:00 |
||
| APPLICATION15.doc.6988docx | Day to Day Repairs and Maintenance Works in BSNL Staff Quarters under the jurisdiction of DE(City) and DE(Garhshankar) in Hoshiarpur SSA during the Year 2011-12 | 23-06-2011 15:00:00 |
23-06-2011 15:30:00 |
||||
| 14/EE/BSNL/CD/JL/NIT/2011-12 Dated.14.06.2011 | NIT146985.htm | TENDERDOCUMENT14.doc.6985docx | Day to Day Repairs and Maintenance Works in BSNL T.E. and Admn. Buildings under Hoshiarpur SSA during the Year 2011-12. | 22-06-2011 15:00:00 |
22-06-2011 15:30:00 |
||
| APPLICATION14.doc.6986docx | Day to Day Repairs and Maintenance Works in BSNL T.E. and Admn. Buildings under Hoshiarpur SSA during the Year 2011-12. | 22-06-2011 15:00:00 |
22-06-2011 15:30:00 |
||||
| 16/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 166997.htm | NIT 16-11126997.doc | Construction of New cable trench for carrying HT cables from outside to T.E. building Transport Nagar, Ludhiana (Second Call). | 22-06-2011 15:00:00 |
22-06-2011 15:30:00 |
||
| 11/EE/BSNL/CD-II/CHD/2011-12 dated : 14-06-2011 | w66990.htm | 11NIT10-126990.pdf | Construction of tower foundation for 1 No 40M TCS type tower including erection work(Based on GR/TWR-12/01) in Dashmesh Academy at Anandpur Sahib(Ropar SSA) Shifted from Aerry Mill compound Mandi Gobi | 21-06-2011 15:00:00 |
21-06-2011 15:30:00 |
||
| 10/EE/BSNL/CD-II/CHD/2011-12 dated 08-06-2011 | W66958.htm | 10NIT11-12a6958.pdf | Construction of Access node building for NFS project at Chandimandir. | 20-06-2011 15:00:00 |
20-06-2011 15:30:00 |
||
| 10NIT11-12b6959.pdf | Construction of Back Bone node building for NFS project at Chandimandir. | 20-06-2011 15:00:00 |
20-06-2011 15:30:00 |
||||
| 04/EE/BSNL/CD/PTA/2011-12 dated 02.06.2011 | BSNL-6 nit046929.htm | 1112nit046929.pdf | Day to day maintenance of BSNL RTTC compound, Rajpura for the Year 2011-12. | 16-06-2011 15:00:00 |
16-06-2011 15:30:00 |
||
| 10/EE/BSNL/CD/JL/NIT/2011-12 dated 06.06.2011 | NIT106940.htm | TENDERDOCUMENT10.doc.6940docx | Day to day repairs and maintenance works in TE Buildings and Admn. Buildings under BSNL CSD-II, Jalandhar during the Year 2011-12 | 16-06-2011 15:00:00 |
16-06-2011 15:30:00 |
||
| APPLICATION10.doc.6941docx | Day to day repairs and maintenance works in TE Buildings and Admn. Buildings under BSNL CSD-II, Jalandhar during the Year 2011-12 | 16-06-2011 15:00:00 |
16-06-2011 15:30:00 |
||||
| 11/EE/BSNL/CD/JL/NIT/2011-12 dated 07.06.2011 | NIT116942.htm | TENDERDOCUMENT11.doc.6942docx | Day to day repairs and maintenance works in Staff Quarters under BSNL CSD-II, Jalandhar for outer area during the Year 2011-12. | 16-06-2011 15:00:00 |
16-06-2011 15:30:00 |
||
| APPLICATION11.doc.6943docx | Day to day repairs and maintenance works in Staff Quarters under BSNL CSD-II, Jalandhar for outer area during the Year 2011-12. | 16-06-2011 15:00:00 |
16-06-2011 15:30:00 |
||||
| 10/EE/BSNL/CD/JL/NIT/2011-12 dated 06.06.2011 | Corrigendum6944.htm | Corrigendum.doc.6944docx | Day to day repairs and maintenance works in TE Buildings and Admn. Buildings under BSNL CSD-II, Jalandhar during the Year 2011-12. | 16-06-2011 15:00:00 |
16-06-2011 15:30:00 |
||
| 07/2011-12/EE/BSNL/CD-I/CHD dated 8-6-2011 | 07NIT116956.htm | 07NIT116956.pdf | Provision of Aluminium partition at 2nd floor, Telephone Exchange, Sector-49C, Chandigarh | 16-06-2011 15:00:00 |
16-06-2011 15:30:00 |
||
| 12/EE/BSNL/CD/JL/NIT/2011-12 Dt.07.06.2011 | NIT126945.htm | TENDERDOCUMENT12.doc.6945docx | Day to Day Repairs and Maintenance Works in BSNL Staff Quarters, Shastri Market Jalandhar during the Year 2011-12. | 15-06-2011 15:00:00 |
15-06-2011 15:30:00 |
||
| APPLICATION12.doc.6946docx | Day to Day Repairs and Maintenance Works in BSNL Staff Quarters, Shastri Market Jalandhar during the Year 2011-12. | 15-06-2011 15:00:00 |
15-06-2011 15:30:00 |
||||
| 13/EE/BSNL/CD/JL/NIT/2011-12 Dt. 08.06.2011 | NIT136950.htm | TENDERDOCUMENT13.doc.6950docx | Day to Day Repairs and Maintenance Works in Staff Quarters at J P Nagar, Saraswati Vihar, B.S. Colony and Guru Amar Dass Nagar under CSD-II Jalandhar during the Year 2011-12. | 15-06-2011 15:00:00 |
15-06-2011 15:30:00 |
||
| APPLICATION13.doc.6951docx | Day to Day Repairs and Maintenance Works in Staff Quarters at J P Nagar, Saraswati Vihar, B.S. Colony and Guru Amar Dass Nagar under CSD-II Jalandhar during the Year 2011-12. | 15-06-2011 15:00:00 |
15-06-2011 15:30:00 |
||||
| 15/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 156967.htm | NIT 15-11126967.doc | Partitioning work in Hall No. 5 in Central University of Punjab, Bathinda (Third Call) | 15-06-2011 15:00:00 |
15-06-2011 15:30:00 |
||
| EE/BSNL/CD/JL/NIQ/02/2011-12 Dt.14.06.2011 | NIQ6993.htm | Schedule.doc.6993docx | Cleaning of Pipe Shaft / Manholes,removing of chockage of Sewer Line and removal of debris, mulba etc. from T.Ex. Compound MTS Nagar Jalandhar | 15-06-2011 14:00:00 |
15-06-2011 14:30:00 |
||
| 03/EE/BSNL/CD/PTA/2011-12 dated 01.06.2011 | BSNL-6nit036924.htm | 1112nit036924.pdf | Provision of One Collapsible Steel Shutter Near Computer Lab at Ground Floor at Admn. Block RTTC, Rajpura. | 14-06-2011 15:00:00 |
14-06-2011 15:30:00 |
||
| EE/BSNL/CD/JL/NIT/2011-12 dated 31.05.2011 | NIT096913.htm | TENDERDOCUMENT09.doc.6913docx | Repair to leaking AC sheet roofing and extension to PRO office in CTO Complex Jalandhar. | 09-06-2011 15:00:00 |
09-06-2011 15:30:00 |
||
| APPLICATION09.doc.6914docx | Repair to leaking AC sheet roofing and extension to PRO office in CTO Complex Jalandhar. | 09-06-2011 15:00:00 |
09-06-2011 15:30:00 |
||||
| 09/EE/BSNL/CD/JL/NIT/2011-12 dated 31.05.2011 | NIT096915.htm | TENDERDOCUMENT09.doc.6915docx | Repair to leaking AC sheet roofing and extension to PRO office in CTO Complex Jalandhar. | 09-06-2011 15:00:00 |
09-06-2011 15:30:00 |
||
| APPLICATION09.doc.6916docx | Repair to leaking AC sheet roofing and extension to PRO office in CTO Complex Jalandhar. | 09-06-2011 15:00:00 |
09-06-2011 15:30:00 |
||||
| 8/EE/BSNL/CD-II/CHD/2011-2012 dated 01-06-2011 | w66923.htm | 8NIT11-126923.pdf | Hiring of Vehicle for use of Execuctive Engineer (Civil) BSNL Civil Division-II Chandigarh for the month of June,2011 to March,2012. | 09-06-2011 15:00:00 |
09-06-2011 15:30:00 |
||
| 9/EE/BSNL/CD-II/CHD/2011-2012 dated 01-06-2011 | w66925.htm | 9NIT11-126925.pdf | Hiring of Vehicle for use of Superintending Engineer(Civil) BSNL Civil Circle-II Chandigarh for the month of June,2011 to March,2012. | 09-06-2011 15:00:00 |
09-06-2011 15:30:00 |
||
| 14/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 146926.htm | NIT 14-11126926.doc | A/R & M/O to BSNL building in Ludhiana SSA for the year 2011-12 (SH: Provision of Roller blind in the O/o Superintending Engineer (C), BSNL Civil Circle, Ludhiana). | 09-06-2011 15:00:00 |
09-06-2011 15:30:00 |
||
| 07/EE/BSNL/CD/JL/NIT/2011-12 dated 24/05/2011 | NIT076878.htm | TENDERDOCUMENT07.doc.6878docx | Repair to leaking AC sheet roofing and extension to PRO office CTO Complex Jalandhar. | 06-06-2011 15:00:00 |
06-06-2011 15:30:00 |
||
| APPLICATION07.doc.6879docx | Repair to leaking AC sheet roofing and extension to PRO office CTO Complex Jalandhar. | 06-06-2011 15:00:00 |
06-06-2011 15:30:00 |
||||
| 08/EE/BSNL/CD/JL/NIT/2011-12 DATED: 24.05.2011 | NIT086880.htm | TENDERDOCUMENT08.doc.6880docx | Provision of Sign Boards for Ground base and Roof Top Tower sites in Hoshiarpur SSA. | 06-06-2011 15:00:00 |
06-06-2011 15:30:00 |
||
| APPLICATION08.doc.6881docx | Provision of Sign Boards for Ground base and Roof Top Tower sites in Hoshiarpur SSA. | 06-06-2011 15:00:00 |
06-06-2011 15:30:00 |
||||
| 11/EE/BSNL/CD/ASR/2011-12 dated 25.05.2011 | NIT bldg6894.htm | Tender SDEII bldg6894.doc | Day to day Maintenance of BSNL buildings in the area under BSNL Civil Division –II, Amritsar during the year 2011-2012 | 04-06-2011 15:00:00 |
04-06-2011 15:30:00 |
||
| APPLICATION bldg6895.doc | Day to day Maintenance of BSNL buildings in the area under BSNL Civil Division –II, Amritsar during the year 2011-2012 | 04-06-2011 15:00:00 |
04-06-2011 15:30:00 |
||||
| 12/EE/BSNL/CD/ASR/2011-12 dated 25.05.2011 | NIT Qtr6896.htm | Tender SDEII S Qtr6896.doc | “Day to day Maintenance of BSNL Staff Quarters in the area under BSNL Civil Division –II, Amritsar during the year 2011-2012 | 04-06-2011 15:00:00 |
04-06-2011 15:30:00 |
||
| APPLICATION Qtr6897.doc | “Day to day Maintenance of BSNL Staff Quarters in the area under BSNL Civil Division –II, Amritsar during the year 2011-2012 | 04-06-2011 15:00:00 |
04-06-2011 15:30:00 |
||||
| 7/EE/BSNL/CD-II/CHD/2011-12 dated 25-05-2011 | w66886.htm | 7NIT11-126886.pdf | Maintenance and care taking of BSNL inspection quarter in T.E. Building at Phase-VIII industrial area Mohali for the period June,2011 to May,2012. | 03-06-2011 15:00:00 |
03-06-2011 15:30:00 |
||
| 08/EE/BSNL/CD/ASR/2011-12 dated 25.05.2011 | NIT6888.htm | tender qtrs pkt 2011-126888.doc | Petty works and day to day repairs to BSNL Staff Quarters under BSNL Civil Sub Division Pathankot during the year 2011-12 | 03-06-2011 15:00:00 |
03-06-2011 15:30:00 |
||
| APPLICATION q6889.doc | Petty works and day to day repairs to BSNL Staff Quarters under BSNL Civil Sub Division Pathankot during the year 2011-12 | 03-06-2011 15:00:00 |
03-06-2011 15:30:00 |
||||
| 09/EE/BSNL/CD/ASR/2011-12 dated 25.05.2011 | NIT Bldg6890.htm | Tender doc bldg SDEI6890.doc | “Day to day Maintenance of BSNL buildings in the area under BSNL Civil Division –I(Except SDCA Batala), Amritsar during the year 2011-2012 | 03-06-2011 15:00:00 |
03-06-2011 15:30:00 |
||
| APPLICATION bldg6891.doc | “Day to day Maintenance of BSNL buildings in the area under BSNL Civil Division –I(Except SDCA Batala), Amritsar during the year 2011-2012 | 03-06-2011 15:00:00 |
03-06-2011 15:30:00 |
||||
| 10/EE/BSNL/CD/ASR/2011-12 dated 25.05.2011 | NIT Qtr6892.htm | Tender doc Stsff Qtr SDE-I doc6892.doc | “Day to day Maintenance of BSNL Staff Quarters in the area under BSNL Civil Division –I(Except SDCA Batala), Amritsar during the year 2011-2012 | 03-06-2011 15:00:00 |
03-06-2011 15:30:00 |
||
| APPLICATION S Qtr6893.doc | “Day to day Maintenance of BSNL Staff Quarters in the area under BSNL Civil Division –I(Except SDCA Batala), Amritsar during the year 2011-2012 | 03-06-2011 15:00:00 |
03-06-2011 15:30:00 |
||||
| Q-1/EE/BSNL/CD/PTA/2011-12 dated 31.05.2011 | Q-16920.htm | Schedule of Quantity-16920.pdf | 1 Provision of aluminium partition in E10B at TE bldg 3rd floor Leela Bhawan from old aluminium partition of TRA Chotti Baradari Patiala | 03-06-2011 15:00:00 |
03-06-2011 15:30:00 |
||
| Corrigendum to Quotation No.01/EE/BSNL/CD/PTA/2011-12 dated 31.05.2011 | Q-16922.htm | corriQ-16922.pdf | Provision of aluminium partition in E10B at TE bldg 3rd floor Leela Bhawan from old aluminium partition of TRA Chotti Baradari Patiala | 03-06-2011 15:00:00 |
03-06-2011 15:30:00 |
||
| 11/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 116869.htm | NIT 11-11126869.doc | Provision of hoarding frames in SSA Ludhiana | 02-06-2011 15:00:00 |
02-06-2011 15:30:00 |
||
| 12/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 126870.htm | NIT 12-11126870.doc | Construction of New cable trench for carrying HT cables from outside to T.E. building Transport Nagar, Ludhiana | 02-06-2011 15:00:00 |
02-06-2011 15:30:00 |
||
| Corrigendum | CORRIGENDUM NIT-126882.doc | Construction of New cable trench for carrying HT cables from outside to T.E. building Transport Nagar, Ludhiana | 02-06-2011 15:30:00 |
||||
| 13/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 136883.htm | NIT 13-11126883.doc | Shifting of existing cable duct & cable duct chambers in front of Agar Nagar Gate due to Construction of Sub way path in front of Agar Nagar Gate, by Municipal Corporation Ludhiana. | 02-06-2011 15:00:00 |
02-06-2011 15:30:00 |
||
| 6/EE/BSNL/CD-II/CHD/2011-12 dated 23-05-2011 | w66875.htm | 6NIT11-12A6875.pdf | Construction of tower foundation for GR12 tower in Deshmesh Academy at Anandpur Sahib(Ropar SSA) shifted from Aerry Mill compound Mandi Gobindgarh. | 01-06-2011 15:00:00 |
01-06-2011 15:30:00 |
||
| 6 NIT 11-12B6877.pdf | Provision of sign boards at various tower sites in Ropar SSA. | 01-06-2011 15:00:00 |
01-06-2011 15:30:00 |
||||
| 10/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 106868.htm | NIT 10-11126868.doc | Partitioning Work in Hall No. 5 in Central University of Punjab, Bathinda. | 31-05-2011 15:00:00 |
31-05-2011 15:30:00 |
||
| 06/EE/BSNL/CD/JL/NIT/2011-12 | NIT066874.htm | TENDERDOCUMENT06.doc.6874docx | Civil works in room allotted for TRC (Old Canteen room) 2nd floor CTO Complex Jalandhar. | 31-05-2011 15:00:00 |
31-05-2011 15:30:00 |
||
| APPLICATION06.doc.6876docx | Civil works in room allotted for TRC (Old Canteen room) 2nd floor CTO Complex Jalandhar. | 31-05-2011 15:00:00 |
31-05-2011 15:30:00 |
||||
| 5/EE/BSNL/CD-II/CHD/SDE(C)/RPR/2011-12 dated 19.05.2011 | w66847.htm | NIT5 2011-12 A6847.pdf | Day to day maintenance of BSNL Staff Quarters under Ropar SSA upto 31.03.2012 | 30-05-2011 15:00:00 |
30-05-2011 15:30:00 |
||
| NIT5 2011-12 B6848.pdf | Day to day maintenance of BSNL Technical Buildings under ROPAR SSA upto 31.03.2012 | 30-05-2011 15:00:00 |
30-05-2011 15:30:00 |
||||
| 05/EE/BSNL/CD/JL/NIT/2011-12 DATED 23.05.2011 | NIT056871.htm | TENDERDOCUMENT05.doc6871.doc | Provision of Cabin for Cash counter in T.E.Building at Lamba Pind, Jalandhar. | 30-05-2011 15:00:00 |
30-05-2011 15:30:00 |
||
| APPLICATION05.doc6872.doc | Provision of Cabin for Cash counter in T.E.Building at Lamba Pind,Jalandhar. | 30-05-2011 15:00:00 |
30-05-2011 15:30:00 |
||||
| NITNO. 05/2011-12/EE/BSNL/CD-I/CHD Dated:- 20-5-2011 | 05NIT116856.htm | 05NIT116856.pdf | Mtce. & Care taking of BSNL Inspection Quarters in Sector-20, Chandigarh for the year 2011-12 | 28-05-2011 15:00:00 |
28-05-2011 15:30:00 |
||
| 05NIT11(i)6857.pdf | Mtce. & Care taking of BSNL Inspection Quarters in Sector-43A, Chandigarh for the year 2011-12 | 28-05-2011 15:00:00 |
28-05-2011 15:30:00 |
||||
| 05NIT11(ii)6858.pdf | Mtce. & Care taking of BSNL Inspection Quarters in Sector-44A, Chandigarh for the year 2011-12 | 28-05-2011 15:00:00 |
28-05-2011 15:30:00 |
||||
| NITNO. 06/2011-12/EE/BSNL/CD-I/CHD Dated:- 20-5-2011 | 06NIT116859.htm | 06NIT116859.pdf | Mtce. and operational jobs in BSNL in the O/o CE(Civil), O/o Chief Architect, O/o SE(Civil)-I, O/o EE (Civil)-I and O/o SDE(C)-III, Chandigarh for the year 2011-12 | 28-05-2011 15:00:00 |
28-05-2011 15:30:00 |
||
| 03/2011-12/EE/BSNL/CD/FZR | NIT036817.html | Tenderdocument036817.doc | Replacing of damaged floor tile and repairing of false flooring in MSC Switch Room at Kotkapura | 26-05-2011 15:00:00 |
26-05-2011 15:30:00 |
||
| 4/EE/BSNL/CD-II/CHD/2011-12 dated 10-05-2011 | w66801.htm | 4 nit 11-126801.pdf | Provision of sign boards at various tower sites in Ropar SSA. | 21-05-2011 15:00:00 |
21-05-2011 15:30:00 |
||
| 06/EE/BSNL/CD/ASR/2011-12 dated 11.05.2011 | NIT T-IV6807.htm | Tender T-IV6807.doc | “Minor civil works in T-VI quarter old trunk exchange compound Amritsar. | 21-05-2011 15:00:00 |
21-05-2011 15:30:00 |
||
| Application T-IV6808.doc | “Minor civil works in T-VI quarter old trunk exchange compound Amritsar. | 21-05-2011 15:00:00 |
21-05-2011 15:30:00 |
||||
| 07/EE/BSNL/CD/ASR/2011-12 dated 11.05.2011 | NIT Cleaning6809.htm | Tender Cleaning Tank6809.doc | “Cleaning of water storage tanks during the year 2011-2012.(Phase-1) for area under BSNL Civil Sub Division-II Amritsar. | 21-05-2011 15:00:00 |
21-05-2011 15:30:00 |
||
| APPLICATION Cleaning6810.doc | “Cleaning of water storage tanks during the year 2011-2012.(Phase-1) for area under BSNL Civil Sub Division-II Amritsar. | 21-05-2011 15:00:00 |
21-05-2011 15:30:00 |
||||
| 4/EE/BSNL/CD-II/CHD/2011-12 dated 10-05-2011 | sign boards rpr6812.htm | Provision of sign boards at various tower sites in Ropar SSA. | 21-05-2011 15:30:00 |
||||
| 02/EE/BSNL/CD/PTA/2011-12 dated 07.05.2011 | BSNL-6nit026777.htm | 1112nit026777.pdf | A/R & M/O to T.E building at Rajpura (SH:- Maintaining of BSNL Civil Sub Division Rajpura from June 2011 to November 2011) | 20-05-2011 15:00:00 |
20-05-2011 15:30:00 |
||
| 08/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 086752.htm | NIT 08-11126752.doc | Partitioning Work in Hall No. 5 in Central University of Punjab, Bathinda. | 18-05-2011 15:00:00 |
18-05-2011 15:30:00 |
||
| Corrigendum | Corrigendium NIT 086754.doc | Partitioning Work in Hall No. 5 in Central University of Punjab, Bathinda. | 18-05-2011 15:30:00 |
||||
| 05/EE/BSNL/CD/ASR/2011-12 dated 10.05.2011 | NIT6794.htm | Tender document6794.doc | Provision of PVC Flooring, Painting of AC Plant room and Other allied works for EWSD switch at T.E building Katra Sher Singh Amritsar | 18-05-2011 15:00:00 |
18-05-2011 15:30:00 |
||
| APPLICATION6795.doc | Provision of PVC Flooring, Painting of AC Plant room and Other allied works for EWSD switch at T.E building Katra Sher Singh Amritsar | 18-05-2011 15:00:00 |
18-05-2011 15:30:00 |
||||
| 04/EE/BSNL/CD/ASR/2011-12 dated 07.05.2011 | NIT6778.htm | Tender Doc Cable Duct DEP-I ASR6778.doc | “Raising of Manhole Necks and Sealing of Cable duct Chambers in area under DEP-I Amritsar. | 16-05-2011 15:00:00 |
16-05-2011 15:30:00 |
||
| APPLICATION6779.doc | “Raising of Manhole Necks and Sealing of Cable duct Chambers in area under DEP-I Amritsar. | 16-05-2011 15:00:00 |
16-05-2011 15:30:00 |
||||
| 04/EE/BSNL/CD/JL/NIT/2011-12 dated 30.04.2011 | NIT046747.htm | TENDERDOCUMENT04.doc.6747docx | Day to day repairs and maintenance works in BSNL Staff Quarters under BSNL Civil Sub Division-I, Jalandhar during the year 2011-12. | 13-05-2011 15:00:00 |
13-05-2011 15:30:00 |
||
| APPLICATION04.doc.6748docx | Day to day repairs and maintenance works in BSNL Staff Quarters under BSNL Civil Sub Division-I, Jalandhar during the year 2011-12. | 13-05-2011 15:00:00 |
13-05-2011 15:30:00 |
||||
| 3/EE/BSNL/CD-II/CHD/2011-12 dated 03-05-2011 | w66760.htm | 3 nit 11-126760.pdf | Provision of sign boards at various tower sites in Ropar SSA. | 13-05-2011 15:00:00 |
13-05-2011 15:30:00 |
||
| Corrigendum | Corrigendom6782.htm | Provision of sign boards at various tower sites in Ropar SSA. | 13-05-2011 15:30:00 |
||||
| 02/EE/BSNL/CD/JL/NIT/2011-12 dated 30.04.2011 | NIT026733.htm | TENDERDOCUMENT02.doc.6733docx | Addition and alterations in CSC at Model Town, Jalandhar. | 12-05-2011 15:00:00 |
12-05-2011 15:30:00 |
||
| APPLICATION02.doc.6734docx | Addition and alterations in CSC at Model Town, Jalandhar. | 12-05-2011 15:00:00 |
12-05-2011 15:30:00 |
||||
| 03/EE/BSNL/CD/JL/NIT/2011-11 dated 30.04.2011 | NIT036735.htm | TENDERDOCUMENT03.doc.6735docx | Day to day repairs and maintenance works in T.E. buildings and Admn. Buildings under BSNL Civil Sub Division-I, Jalandhar during the year 2011-12. | 12-05-2011 15:00:00 |
12-05-2011 15:30:00 |
||
| APPLICATION03.doc.6736docx | Day to day repairs and maintenance works in T.E. buildings and Admn. Buildings under BSNL Civil Sub Division-I, Jalandhar during the year 2011-12. | 12-05-2011 15:00:00 |
12-05-2011 15:30:00 |
||||
| 04/2011-12/EE/BSNL/CD-I/CHD dated 4-5-2011 | 04NIT116763.htm | 04NIT116763.pdf | Day to day mtce. i/c special repairs to BSNL Staff Quarters Sector-36A, 36B, 39B and 43, Chandigarh during the period 2011-12. | 12-05-2011 15:00:00 |
12-05-2011 15:30:00 |
||
| 04NIT116764.htm | 04NIT116764.pdf | Day to day mtce. i/c special repairs to BSNL Staff Quarters Sector-36A, 36B, 39B and 43, Chandigarh during the period 2011-12. | 12-05-2011 15:00:00 |
12-05-2011 15:30:00 |
|||
| 04NIT11(ii)6765.pdf | Day to day mtce i/c special repairs to BSNL Admn. And Technical Buildings under the jurisdiction of BSNL Civil Sub Division-I, Chandigarh for the period 2011-2012 | 12-05-2011 15:00:00 |
12-05-2011 15:30:00 |
||||
| 04NIT11(i)6766.pdf | Day to day mtce. i/c special repairs to BSNL Staff Quarters Sector-44, Chandigarh during the period 2011-12 | 12-05-2011 15:00:00 |
12-05-2011 15:30:00 |
||||
| 01/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 016713.htm | NIT 01-11126713.doc | Partitioning work in Hall No. 5 in Central University of Punjab, Bathinda. | 11-05-2011 15:00:00 |
11-05-2011 15:30:00 |
||
| Corrigendum | Corrigendum NIT 016715.doc | Partitioning work in Hall No. 5 in Central University of Punjab, Bathinda. | 11-05-2011 15:30:00 |
||||
| 03/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 036720.htm | NIT 03-11126720.doc | Maintenance and operational jobs in the O/o The Executive Engineer (C), Civil Division, Ludhiana and O/o Sub Divisional Engineer (C) , Civil Sub Division-I, Ludhiana for the year 2011-2012. | 11-05-2011 15:00:00 |
11-05-2011 15:30:00 |
||
| 04/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 046721.htm | NIT 04-11126721.doc | Maintenance and operational jobs in the O/o The Superintending Engineer ( C) , Civil Circle, Ludhiana and O/o Sub Divisional Engineer (C), Civil Sub Division-II, Ludhiana for the year 2011-2012 | 11-05-2011 15:00:00 |
11-05-2011 15:30:00 |
||
| 05/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT-056723.htm | NIT 05-11126723.doc | A/R & M/O to BSNL buildings in Ludhiana SSA for the year 2011-12 (SH:Maintenance of lawns in Sanchar Colony, BRS Nagar, Ludhiana) | 11-05-2011 15:00:00 |
11-05-2011 15:30:00 |
||
| 06/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT-066724.htm | NIT 06-11126724.doc | A/R & M/O to BSNL buildings in Ludhiana SSA for the year 2011-12 (SH: Maintenance of lawns in BSNL Staff Quarters compounds of Sanchar Colony Khanna, and P&T Colony, Ludhiana). | 11-05-2011 15:00:00 |
11-05-2011 15:30:00 |
||
| 07/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 076725.htm | NIT 07-11126725.doc | A/R & M/O to BSNL buildings in Ludhiana SSA for the year 2011-12 (SH: Maintenance of lawns in TE compound RBN, Ludhiana & Doraha). | 11-05-2011 15:00:00 |
11-05-2011 15:30:00 |
||
| 2 / EE/BSNL/CD-II/Chd/csd/mhl/2011-12 dated : 3.5.2011 | W66758.htm | staffqyuarters6758.pdf | DAY TO DAY MAINTENENCE OF BSNL Staff quarters and Inspection quarters AT MOHALI UNDER JURISDICTION OF BSNL CIVIL SUB DIVISION S.A.S. Nagar(Mohali) upto to March 2012 | 11-05-2011 15:00:00 |
11-05-2011 15:30:00 |
||
| daytodayTE building6759.pdf | DAY TO DAY MAINTENENCE OF BSNL TE building at Mohali under jurisdiction OF BSNL CIVIL SUB DIVISION S.A.S. Nagar(Mohali) upto to March 2012 | 11-05-2011 15:00:00 |
11-05-2011 15:30:00 |
||||
| 03/2011-12/EE/BSNL/CD-I/CHD dated 30-4-2011 | 03NIT116749.htm | 03NIT116749.pdf | Day to day mtce. and special repairs to BSNL Staff Quarters at Sector-27C, Chandigarh for the period 2011-12. | 10-05-2011 15:00:00 |
10-05-2011 15:30:00 |
||
| 03NIT11(i)6750.pdf | Day to day mtce. and special repairs to BSNL Staff Quarters at Sector-30A, Chandigarh for the period 2011-12 | 10-05-2011 15:00:00 |
10-05-2011 15:30:00 |
||||
| 03NIT11(ii)6751.pdf | Day to day mtce and special repairs to Technical and Admn. Buildings under the jurisdiction of BSNL Civil Sub Division-III, Chandigarh for the period 2011-2012 | 10-05-2011 15:00:00 |
10-05-2011 15:30:00 |
||||
| 01/EE/BSNL/CD/PTA/2011-12 dated 29.04.2011 | BSNL-6nit016730.htm | 1112nit016730.pdf | Day to day maintenance to BSNL buildings at Sangrur for the Year 2011-12. | 09-05-2011 15:00:00 |
09-05-2011 15:30:00 |
||
| 03/EE/BSNL/CD/ASR/2011-12dated 29.04.2011 | NIT6728.htm | Tender Doc False flooring KSS6728.doc | Provision of False Flooring in A/C Package room in T.E Compound Katra Sher Singh Amritsar | 07-05-2011 15:00:00 |
07-05-2011 15:30:00 |
||
| APPLICATION6729.doc | Provision of False Flooring in A/C Package room in T.E Compound Katra Sher Singh Amritsar | 07-05-2011 15:00:00 |
07-05-2011 15:30:00 |
||||
| 1/EE/BSNL/CD-II/CHD/2011-2012 dated 25-04-2011 | w66700.htm | 1nit11-126700.pdf | Hiring of Vehicle for use of Executive Engineer(Civil)BSNL Civil Division-II Chandigarh for the month of May 2011 to March 2012. | 04-05-2011 15:00:00 |
04-05-2011 15:30:00 |
||
| 02/2011-12/EE/BSNL/CD/LDH | BSNL W-6 NIT 026714.htm | NIT 02-11126714.doc | Conversion of Air Box 3B into battery room at first floor in Central University at Bathinda..” | 04-05-2011 15:00:00 |
04-05-2011 15:30:00 |
||
| 1/EE/BSNL/CD-II/CHD/2011-2012 dated 25-04-2011 | Corrigendum-I6757.htm | Hiring of Vehicle for use of Executive Engineer(Civil)BSNL Civil Division-II Chandigarh for the month of May 2011 to March 2012. | 04-05-2011 15:30:00 |
||||
| 01/2011-12/EE/BSNL/CD-I/CHD dated 20-4-2011 | 01NIT116685.htm | 01NIT116685.pdf | Reconstruction of Boundary wall of CSIO , Sec-30C Chandigarh.” | 02-05-2011 15:00:00 |
02-05-2011 15:30:00 |
||
| NIT No. 02/2011-12/EE/BSNL/CD-I/CHD Dated 20-4-2011 | 02NIT116686.htm | 02NIT116686.pdf | Construction of 20 No Type-III & 8 Nos Scientist apartments at CSIO , Sec-30C , Chandigarh (Balance civil work).” | 02-05-2011 15:00:00 |
02-05-2011 15:30:00 |
||
| 01/EE/BSNL/CD/JL/NIT/2011-12 | NIT016689.htm | TENDERDOCUMENT01.doc.6689docx | Provision of Shed for CSC in BSNL Compound at Lamba Pind,Jalandhar. | 29-04-2011 15:00:00 |
29-04-2011 15:30:00 |
||
| APPLICATION01.doc.6690docx | Provision of Shed for CSC in BSNL Compound at Lamba Pind,Jalandhar | 29-04-2011 15:00:00 |
29-04-2011 15:30:00 |
||||
| Corrigendum | Corrigendum6717.doc | Provision of Shed for CSC in BSNL Compound at Lamba Pind,Jalandhar. | 29-04-2011 15:30:00 |
||||
| 90/EE/BSNL/CD/ASR/2010-11 dated 18.04.2011 | NIT bldg6675.htm | tender bldg pkt 2011-126675.doc | of “Petty works and day to day repairs to BSNL Buildings under BSNL Civil Sub Division Pathankot during the year 2011-12 | 26-04-2011 15:00:00 |
26-04-2011 15:30:00 |
||
| NIT Bldg6676.htm | APPLICATION building6676.doc | “Petty works and day to day repairs to BSNL Buildings under BSNL Civil Sub Division Pathankot during the year 2011-12 | 26-04-2011 15:00:00 |
26-04-2011 15:30:00 |
|||
| 02/EE/BSNL/CD/ASR/2011-12 dated 18.04.2011 | NIT Qtrs6677.htm | tender qtrs pkt 2011-126677.doc | “Petty works and day to day repairs to BSNL Staff Quarters under BSNL Civil Sub Division Pathankot during the year 2011-12 | 26-04-2011 15:00:00 |
26-04-2011 15:30:00 |
||
| APPLICATION qtrs6678.doc | “Petty works and day to day repairs to BSNL Staff Quarters under BSNL Civil Sub Division Pathankot during the year 2011-12 | 26-04-2011 15:00:00 |
26-04-2011 15:30:00 |
||||
| 90/EE/BSNL/CD/ASR/2010-11 dated 18.04.2011 | Corrigendum6679.htm | of “Petty works and day to day repairs to BSNL Buildings under BSNL Civil Sub Division Pathankot during the year 2011-12 | 26-04-2011 15:30:00 |
||||
| EE/BSNL/CD/JL/NIQ01/2011 -12 Dt.21.04.2011 | NIQ016693.htm | Sabzi Mandi.doc6693.doc | Provision of cash counter in rented T.E.Building, Sabzi Mandi Jalandhar. | 23-04-2011 15:00:00 |
23-04-2011 15:30:00 |
||
| 01/2011-12/EE/BSNL/CD/FZR | NIT016649.html | Tenderdocument016649.doc | A/R & M/O to BSNL buildings in Ferozepur SSA for the year 2011-12 (SH: Maintenance of lawns in RSU Building & Dusshera ground at Moga) | 20-04-2011 15:00:00 |
20-04-2011 15:30:00 |
||
| 02/2011-12/EE/BSNL/CD/FZR | NIT026650.html | Tenderdocument026650.doc | A/R & M/O to BSNL buildings in Ferozepur SSA for the year 2011-12 (SH: Maintenance & operational jobs in the O/o BSNL Civil Sub Division, Moga) | 20-04-2011 15:00:00 |
20-04-2011 15:30:00 |
||
| 92/2010-11/EE/BSNL/CD/LDH | Corrigendium 92-956668.doc | Raising of Cable duct manhole necks from Sherpur Chowk to Giaspura Chowk and Pawa village to Sahnewal, under area of DET, Dholewal, due to six laning of NH-I, G.T. road at Ludhiana. | 19-04-2011 15:30:00 |
||||
| 95/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 956647.htm | NIT 95-10116647.doc | A/R & M/O TO BSNL BUILDINGS IN BATHINDA SSA FOR THE YEAR 2011-12 (SH:DAY TO DAY MAINTENANCE FOR TE BUILDINGS IN BATHINDA). | 15-04-2011 15:00:00 |
15-04-2011 15:30:00 |
||
| 92/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 926641.htm | NIT 92-10116641.doc | Raising of Cable duct manhole necks from Sherpur Chowk to Giaspura Chowk and Pawa village to Sahnewal, under area of DET, Dholewal, due to six laning of NH-I, G.T. road at Ludhiana. | 14-04-2011 15:00:00 |
14-04-2011 15:30:00 |
||
| 93/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 936642.htm | NIT 93-10116642.doc | Raising & Levelling of OAN Manholes in Mansa City. | 14-04-2011 15:00:00 |
14-04-2011 15:30:00 |
||
| 94/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 946643.htm | NIT 94-10116643.doc | Provision of aluminium partition under false flooring & allied works in Dot soft (G.F.), E-10 B II/ OCB tax in T.E. Bldg. at Bharat Nagar, Ludhiana. | 14-04-2011 15:00:00 |
14-04-2011 15:30:00 |
||
| 89/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 896620.htm | NIT 89-10116620.doc | Conversion of Air Box 3B into battery room at first floor in Central University at Bathinda (Third Call). | 08-04-2011 15:00:00 |
08-04-2011 15:30:00 |
||
| 90/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 906621.htm | NIT 90-10116621.doc | Provision of Customer Service Centre In T.E. Building at Dugri, | 08-04-2011 15:00:00 |
08-04-2011 15:30:00 |
||
| 91/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 916622.htm | NIT 91-10116622.doc | Maintenance of Lawn & Care taking of Inspection Quarters at Dugri Ludhiana for the year 2011-12. | 08-04-2011 15:00:00 |
08-04-2011 15:30:00 |
||
| 68/EE/BSNL/CD/PTA/2010-11 dated 30.03.11 | BSNL-6nit686632.htm | 1011nit686632.pdf | Maintenance of Lawn/Trainee Parks in RTTC Complex at Rajpura from April 2011 to September 2011. | 08-04-2011 15:00:00 |
08-04-2011 15:30:00 |
||
| 69/EE/BSNL/CD/PTA/2010-11 dated : 30.03.11 | BSNL-6nit696633.htm | 1011nit696633.pdf | Maintenance of BSNL Park at Shahi Samadhan at Sangrur for the year 2011-2012. | 08-04-2011 15:00:00 |
08-04-2011 15:30:00 |
||
| 91/2010-11/EE/BSNL/CD/LDH | Corrigendum - Nit 906639.doc | Maintenance of Lawn & Care taking of Inspection Quarters at Dugri Ludhiana for the year 2011-12. | 08-04-2011 15:30:00 |
||||
| 37/2010-11/EE/BSNL/CD/FZR | NIT376614.html | Tenderdocument376614.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-12 (SH: Day to day maintenance for TE building / staff quarters under the jurisdiction of BSNL Civil Sub Division-I, Ferozepur upto 31.03 | 07-04-2011 15:00:00 |
07-04-2011 15:30:00 |
||
| 38/2010-11/EE/BSNL/CD/FZR | NIT386615.html | Tenderdocument386615.doc | /R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-12 (SH: Day to day maintenance for TE building / staff quarters under the jurisdiction of BSNL Civil Sub Division-II, Ferozepur upto 31.03 | 07-04-2011 15:00:00 |
07-04-2011 15:30:00 |
||
| 39/2010-11/EE/BSNL/CD/FZR | NIT396616.html | Tenderdocument396616.doc | /R & M/O to BSNL Buildings in Ferozepur SSA for the year 2011-12 (SH: Day to day maintenance for BSNL buildings under the jurisdiction of BSNL Civil Sub Division, Moga upto 31.03.2012). | 07-04-2011 15:00:00 |
07-04-2011 15:30:00 |
||
| 60/EE/BSNL/CD-II/CHD/2010-11Dated:22.03.2011 | corrigendum-II6634.htm | Construction of Access node building for NFS project at Chandimandir. | 04-04-2011 15:30:00 |
||||
| Corrigendum | corrigendum-II6635.htm | Construction of Back Bone node building for NFS project at Chandimandir. | 04-04-2011 15:30:00 |
||||
| 87/EE/BSNL/CD/ASR/2010-11 dated 23.03.2011 | nit6575.htm | Tender Doc Cable duct6575.doc | “Raising of Manhole Necks and Sealing of Cable duct Chambers in area under DET City-II & DET Amritsar. | 02-04-2011 15:00:00 |
02-04-2011 15:30:00 |
||
| APPLICATION6576.doc | “Raising of Manhole Necks and Sealing of Cable duct Chambers in area under DET City-II & DET Amritsar. | 02-04-2011 15:00:00 |
02-04-2011 15:30:00 |
||||
| 88/EE/BSNL/CD/ASR/2010-11dated 24.03.2011 | NIT operational6582.htm | Tender doc operational job6582.doc | “Maintenance & Operational Jobs in O/o the SDE(C), Pathankot during the year 2011-12. (April 2011 to September 2011.) | 02-04-2011 15:00:00 |
02-04-2011 15:30:00 |
||
| APPLICATION operational job6583.doc | “Maintenance & Operational Jobs in O/o the SDE(C), Pathankot during the year 2011-12. (April 2011 to September 2011.) | 02-04-2011 15:00:00 |
02-04-2011 15:30:00 |
||||
| 89/EE/BSNL/CD/ASR/2010-11 dated 24.03.2011 | NIT Horti6584.htm | Tender horti6584.doc | “Horticulture works and Upkeeping of Lawns / Plants in T.E. Building Compound Pathankot and Gurdaspur during the year 2011-12.(April 2011 to September 2011.) | 02-04-2011 15:00:00 |
02-04-2011 15:30:00 |
||
| APPLICATION horti6585.doc | “Horticulture works and Upkeeping of Lawns / Plants in T.E. Building Compound Pathankot and Gurdaspur during the year 2011-12.(April 2011 to September 2011.) | 02-04-2011 15:00:00 |
02-04-2011 15:30:00 |
||||
| 60/EE/BSNL/CD-II/CHD/2010-11Dated:22.03.2011 | corrigendum6623.htm | Construction of Access node building for NFS project at Chandimandir. | 01-04-2011 15:30:00 |
||||
| Corrigendum | corrigendum6624.htm | Construction of Back Bone node building for NFS project at Chandimandir. | 01-04-2011 15:30:00 |
||||
| 67/EE/BSNL/CD/PTA/2010-11 dated 21.03.2011 | BSNL-6nit676565.htm | 1011nit676565.pdf | Day to day maintenance to BSNL buildings in the jurisdiction of DET (Group) PTA & LOCAL BSNL buildings in Patiala for the period from April 2011 to September 2011. | 30-03-2011 15:00:00 |
30-03-2011 15:30:00 |
||
| Corrigendum to NIT No.-67/EE/BSNL/CD/PTA/2010-11 | corrinit676566.htm | corrinit676566.pdf | Day to day maintenance to BSNL buildings in the jurisdiction of DET (Group) PTA & LOCAL BSNL buildings in Patiala for the period from April 2011 to September 2011. | 30-03-2011 15:00:00 |
30-03-2011 15:30:00 |
||
| 60/EE/BSNL/CD-II/CHD/2010-11Dated:22.03.2011 | 60w66572.htm | 60NIT10-11A6572.pdf | Construction of Access node building for NFS project at Chandimandir. | 30-03-2011 15:00:00 |
30-03-2011 15:30:00 |
||
| 60NIT10-11B6573.pdf | Construction of Back Bone node building for NFS project at Chandimandir. | 30-03-2011 15:00:00 |
30-03-2011 15:30:00 |
||||
| 78/EE/BSNL/CD/ASR/2010-11 dated 18.03.2011 | NIT KSS6528.htm | TENDER DOC KSS6528.doc | “Maintenance of Horticulture works in BSNL compound at Chheharta & Katra Sher Singh Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||
| APPLICATION KSS6529.doc | “Maintenance of Horticulture works in BSNL compound at Chheharta & Katra Sher Singh Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||||
| 79/EE/BSNL/CD/ASR/2010-11 dated 18.03.2011 | NIT GOAL BAGH6530.htm | TENDER GOAL BAGH6530.doc | “Maintenance of Horticulture works in BSNL compound at P&T Colony Goal Bagh, Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||
| APPLICATION GOAL BAGH6531.doc | “Maintenance of Horticulture works in BSNL compound at P&T Colony Goal Bagh, Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||||
| 80/EE/BSNL/CD/ASR/2010-11 dated 18.03.2011 | NIT GOINDWAL SAHIB6532.htm | TENDER GOINDWAL SAHIB6532.doc | “Maintenance of Horticulture works in BSNL compound at Goindwal Sahib Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||
| APPLICATION GOINDWAL SAHIB6533.doc | “Maintenance of Horticulture works in BSNL compound at Goindwal Sahib Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||||
| 81/EE/BSNL/CD/ASR/2010-11 dated 18.03.2011 | NIT RANJIT AVENUE6534.htm | TENDER RANJIT AVENUE6534.doc | “Maintenance of Horticulture works in BSNL compound at Ranjit Avenue Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||
| APPLICATION RANJIT AVENUE6535.doc | “Maintenance of Horticulture works in BSNL compound at Ranjit Avenue Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||||
| 82/EE/BSNL/CD/ASR/2010-11 dated 18.03.2011 | NIT Operational Job6536.htm | Tender Operational jobs6536.doc | “A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2011 (SH : Maintenance & Operational jobs in O/o the EE (C) & SDE -I(C) Amritsar | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||
| APPLICATION Oppretional Job6537.doc | “A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2011 (SH : Maintenance & Operational jobs in O/o the EE (C) & SDE -I(C) Amritsar | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||||
| 83/EE/BSNL/CD/ASR/2010-11 dated 18.03.2011 | NIT Jandiala Guru6538.htm | Tender Jandiala Guru6538.doc | “Maintenance of Horticulture works in BSNL compound at Jandiala Guru Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||
| APPLICATION Jandiala Guru6539.doc | “Maintenance of Horticulture works in BSNL compound at Jandiala Guru Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||||
| 84/EE/BSNL/CD/ASR/2010-11 dated 18.03.2011 | NIT Guru Ravi Das Marg6540.htm | Tender Guru Ravi Das6540.doc | “Maintenance of Horticulture works in BSNL compound at Guru Ravi Das Marg Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||
| APPLICATION Guru Ravi Das marg6541.doc | “Maintenance of Horticulture works in BSNL compound at Guru Ravi Das Marg Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||||
| 85/EE/BSNL/CD/ASR/2010-11 dated 18.03.2011 | NIT Batala6542.htm | Tender Mall Mandi6542.doc | “Maintenance of Horticulture works in BSNL compound at Mall Mandi Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||
| APPLICATION Mall Mandi6543.doc | “Maintenance of Horticulture works in BSNL compound at Mall Mandi Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||||
| 86/EE/BSNL/CD/ASR/2010-11 dated 18.03.2011 | NIT Batala6544.htm | Tender Batala6544.doc | “Maintenance of Horticulture works in BSNL compound at Batala during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||
| APPLICATION Batala6545.doc | “Maintenance of Horticulture works in BSNL compound at Batala during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||||
| 85/EE/BSNL/CD/ASR/2010-11 dated 18.03.2011 | NIT Mall Mandi6546.htm | Tender Mall Mandi6546.doc | “Maintenance of Horticulture works in BSNL compound at Mall Mandi Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:15:00 |
||
| APPLICATION Mall Mandi6547.doc | “Maintenance of Horticulture works in BSNL compound at Mall Mandi Amritsar during the year 2011-12 | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||||
| 59/EE/BSNL/CD-II/CHD/2010-11 Dated: 22.03.2011 | 59w66571.htm | 59NIT10-116571.pdf | Construction of Tower Foundations for 1 No. 40M NBLW type tower including erection work (Based on GR/TWR-04/01) at Krishna Enclave shifted to Sawraj Enclave Kharar,of Chandigarh SSA (SH : ERECTION | 29-03-2011 15:00:00 |
29-03-2011 15:30:00 |
||
| 76/EE/BSNL/CD/ASR/2010-11 dated 17.03.2011 | NIT6523.htm | Tender AMC6523.doc | “Annual maintenance of Automatic bacteriological Treatment Plant including supply and Filling of Chemical in Treatment Plant installed in BSNL compound at Pathankot(2011-12)” | 28-03-2011 15:00:00 |
28-03-2011 15:30:00 |
||
| APPLICATION6524.doc | “Annual maintenance of Automatic bacteriological Treatment Plant including supply and Filling of Chemical in Treatment Plant installed in BSNL compound at Pathankot(2011-12)” | 28-03-2011 15:00:00 |
28-03-2011 15:30:00 |
||||
| 77/EE/BSNL/CD/ASR/2010-11 dated 17.03.2011 | NIT6525.htm | Tender doc6525.doc | “Petty works and day to day repairs to BSNL buildings and staff quarters under BSNL Civil Sub Division Pathankot during the year 2011-12” | 28-03-2011 15:00:00 |
28-03-2011 15:30:00 |
||
| APPLICATION6526.doc | “Petty works and day to day repairs to BSNL buildings and staff quarters under BSNL Civil Sub Division Pathankot during the year 2011-12” | 28-03-2011 15:00:00 |
28-03-2011 15:30:00 |
||||
| Corrigendum | Corri6581.doc | “Petty works and day to day repairs to BSNL buildings and staff quarters under BSNL Civil Sub Division Pathankot during the year 2011-12” | 28-03-2011 15:30:00 |
||||
| 27/EE/BSNL/CD-I/CHD/2010-2011 dated 17-3-2011 | 27NIT106527.htm | 27NIT106527.pdf | Construction of Advance Center for Protein Informatics, Science, Engineering and Technology in IMTECH, Sector-39 A, Chandigarh ( SH : Polycarbonate sheet and PU Paint ). | 25-03-2011 15:00:00 |
25-03-2011 15:30:00 |
||
| 87/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 876553.htm | NIT 87-10116553.doc | Conversion of Air Box 3B into battery room at first floor in Central University at Bathinda (Second Call). | 25-03-2011 15:00:00 |
25-03-2011 15:30:00 |
||
| 88/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 886554.htm | NIT 88-10116554.doc | Provision of aluminium partition in Tissue Culture Lab in Central University of Punjab at Bathinda (Second Call). | 25-03-2011 15:00:00 |
25-03-2011 15:30:00 |
||
| 75/EE/BSNL/CD/ASR/2010-11 dated 15.03.2011 | NIT6512.htm | Tender document6512.doc | “Provision of PVC Flooring, Painting of AC Plant room and Other allied works for EWSD switch at T.E building Katra Sher Singh Amritsar | 24-03-2011 15:00:00 |
24-03-2011 15:30:00 |
||
| APPLICATION6513.doc | “Provision of PVC Flooring, Painting of AC Plant room and Other allied works for EWSD switch at T.E building Katra Sher Singh Amritsar | 24-03-2011 15:00:00 |
24-03-2011 15:30:00 |
||||
| 26/2010-11/EE/BSNL/CD-I/CHD dated 9-3-2011 | corrigendum Bwall6564.htm | Reconstruction of Boundary wall of CSIO, Sector-30C, Chandigarh | 24-03-2011 15:30:00 |
||||
| 58/EE/BSNL/CD-II/CHD/2010-11 Dated: 11.03.2011 | 58 w66503.htm | 58NIT10-11a6503.pdf | Construction of Access node building for NFS project at Chandimandir. | 22-03-2011 15:00:00 |
22-03-2011 15:30:00 |
||
| 58NIT10-11b6504.pdf | Construction of Back Bone node building for NFS project at Chandimandir. | 22-03-2011 15:00:00 |
22-03-2011 15:30:00 |
||||
| 35/2010-11/EE/BSNL/CD/FZR | NIT356442.html | Tenderdocument356442.doc | Infrastructure for defence project (NFS)- Civil works for ascon node at Nathewala (Faridkot)-2nd call | 21-03-2011 15:00:00 |
21-03-2011 15:30:00 |
||
| 36/2010-11/EE/BSNL/CD/FZR | NIT366443.html | Tenderdocument366443.doc | Infrastructure for defence project (NFS)- Civil works for access node at Abohar-2nd call | 21-03-2011 15:00:00 |
21-03-2011 15:30:00 |
||
| 26/2010-11/EE/BSNL/CD-I/CHD dated 9-3-2011 | 26NIT106488.htm | 26NIT106488.pdf | Reconstruction of Boundary wall of CSIO, Sector-30C, Chandigarh | 21-03-2011 15:00:00 |
21-03-2011 15:30:00 |
||
| 83/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 836451.htm | NIT 83-10116451.doc | Miscellaneous Civil Work in Unutilized Hall No. 6 in Central University of Punjab, Bathinda | 18-03-2011 15:00:00 |
18-03-2011 15:30:00 |
||
| Corrigendum | CORRIGENDUM for NIT-836453.doc | Miscellaneous Civil Work in Unutilized Hall No. 6 in Central University of Punjab, Bathinda | 18-03-2011 15:30:00 |
||||
| Corrigendum | CORRIGENDUM for NIT-836454.doc | Miscellaneous Civil Work in Unutilized Hall No. 6 in Central University of Punjab, Bathinda | 18-03-2011 15:30:00 |
||||
| 84/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 846481.htm | NIT 84-10116481.doc | Converson of Air Box 3B into battery room at first floor in Central University at Bathinda | 18-03-2011 15:00:00 |
18-03-2011 15:30:00 |
||
| 85/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 856482.htm | NIT 85-10116482.doc | Provision of aluminium partition in Tissue Culture Lab in Central University of Punjab at Bathinda | 18-03-2011 15:00:00 |
18-03-2011 15:30:00 |
||
| 57/EE/BSNL/CD/CHD-II/2010-201 1 Dated : 10-03-2011 | 57w66499.htm | 57NIT10-116499.pdf | Supply of Computers with Peripherial for use of Planning & Accounts Section of Supply of Computers with Peripherial for use of Planning & Accounts Section of | 17-03-2011 15:00:00 |
17-03-2011 15:30:00 |
||
| 82/2010-11/EE/BSNL/CD/LDH | BSNL W-6 NIT 826450.htm | NIT 82-10116450.doc | A/R & M/O to BSNL Buildings in Bathinda SSA for the year 2011-12 (SH: Day to day Maintenance of P & T colony at Bathinda). | 15-03-2011 15:00:00 |
15-03-2011 15:30:00 |
||
| 80/2010-11/EE/BSNL/CD/LDH Dated 28-02-2011 | CORRIGENDIUM FOR NIT-80 & NIT-816472.doc | Raising of Cable duct manhole necks from CMC TE to Cheema Chowk via Kidwai Nagar, Issa Puli and from Cheema Chowk to CMC Hospital via Hargobind Nagar (RE-CALL) | 15-03-2011 15:30:00 |
||||
| 81/2010-11/EE/BSNL/CD/LDH Dated 28-02-2011 | CORRIGENDIUM FOR NIT-80 & NIT-816473.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to day Maintenance of all BSNL Buildings falling under local area of the Sub Division-I) (RE-CALL) | 15-03-2011 15:30:00 |
||||
| 86/2010-11/EE/BSNL/CD/LDH Dated:-08-03-2011 | BSNL W-6 NIT 866484.htm | NIT 86-10116484.doc | Shifting of existing cable duct & cable duct chambers in front of Katcheri chowk due to Construction of Sub way path in front of Katcheri Chowk , by Municipal Corporation Ludhiana. | 15-03-2011 15:00:00 |
15-03-2011 15:30:00 |
||
| QUOTATION NOTICE dated 10.03.2011 | quotation6498.htm | schdule6498.pdf | Construction of Foundation & Erection of 40 Metre TCS Type tower at Saidpur in Amritsar SSA(SH:- Shifting of Tower Material from Chandigarh SSA Store, Mohali to T.E. Compound, Rayya / BSNL Store, Amr | 14-03-2011 15:00:00 |
14-03-2011 15:30:00 |
||
| 80/2010-11/EE/BSNL/CD/LDH Dated 28-02-2011 | BSNL W-6 NIT 806426.htm | NIT 80-10116426.doc | Raising of Cable duct manhole necks from CMC TE to Cheema Chowk via Kidwai Nagar, Issa Puli and from Cheema Chowk to CMC Hospital via Hargobind Nagar (RE-CALL) | 11-03-2011 15:00:00 |
11-03-2011 15:30:00 |
||
| 81/2010-11/EE/BSNL/CD/LDH Dated 28-02-2011 | BSNL W-6 NIT 816427.htm | NIT 81-10116427.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to day Maintenance of all BSNL Buildings falling under local area of the Sub Division-I) (RE-CALL) | 11-03-2011 15:00:00 |
11-03-2011 15:30:00 |
||
| 73 / EE/BSNL/CD/ASR/2010-11 Dated:-01.03.2011 | NIT vehicle6433.htm | vehicle asr6433.doc | Hiring of 01 No. of Non Air Conditioned Light Commercial Vehicle for 1600 Kms. Per month. | 11-03-2011 15:00:00 |
11-03-2011 15:30:00 |
||
| 74/EE/BSNL/CD/ASR/2010-11 dated 01.03.2011 | Nit Sign Pkt6434.htm | tender sign Pathankot6434.doc | Provision of Sign Boards for ground base and Roof Top Towers in SSA Pathankot | 11-03-2011 15:00:00 |
11-03-2011 15:30:00 |
||
| APPLICATION6435.doc | Provision of Sign Boards for ground base and Roof Top Towers in SSA Pathankot | 11-03-2011 15:00:00 |
11-03-2011 15:30:00 |
||||
| 70/EE/BSNL/CD/ASR/2010-11 dated 09.02.2011 | NIT6366.htm | Tender Saidpur Fdn6366.pdf | “Construction of Foundation & Erection of 40 Metre TCS type Tower at Saidpur in Amritsar SSA (SH:- Foundation)” | 21-02-2011 15:00:00 |
21-02-2011 15:30:00 |
||
| APPLICATION6367.doc | “Construction of Foundation & Erection of 40 Metre TCS type Tower at Saidpur in Amritsar SSA (SH:- Foundation)” | 21-02-2011 15:00:00 |
21-02-2011 15:30:00 |
||||
| 72/EE/BSNL/CD/ASR/10-11 Dated:- 09.02.2011 | NIT6370.htm | NIT NFS PKT_6370.pdf | “Infrastructure for Defence Project (NFS) - “Civil works for Composite Node C-1 Type at Pathankot, Dist. Gurdaspur (Punjab).” | 21-02-2011 15:00:00 |
21-02-2011 15:30:00 |
||
| APPLICATION6371.pdf | “Infrastructure for Defence Project (NFS) - “Civil works for Composite Node C-1 Type at Pathankot, Dist. Gurdaspur (Punjab).” | 21-02-2011 15:00:00 |
21-02-2011 15:30:00 |
||||
| 79/2010-11/EE/BSNL/CD/LDH Dated 08-02-2011 | BSNL W-6 NIT 796355.htm | NIT 79-10116355.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to day Maintenance of all BSNL Buildings falling under local area of the Sub Division-I)- RE CALL | 18-02-2011 15:00:00 |
18-02-2011 15:30:00 |
||
| 71/EE/BSNL/CD/ASR/2010-11dated 09.02.2011 | NIT6368.htm | Tender Cleaning6368.doc | of “A/R and M/O to BSNL Buildings and Staff Quarters in SSA Pathankot during the year 2010-2011 (SH:- Cleaning of water storage tanks and repair to rolling shutters at Chakki Bank colony and | 18-02-2011 15:00:00 |
18-02-2011 15:30:00 |
||
| APPLICATION6369.doc | of “A/R and M/O to BSNL Buildings and Staff Quarters in SSA Pathankot during the year 2010-2011 (SH:- Cleaning of water storage tanks and repair to rolling shutters at Chakki Bank colony and | 18-02-2011 15:00:00 |
18-02-2011 15:30:00 |
||||
| 69/EE/BSNL/CD/ASR/2010-11 dated 07.02.2011 | NIT6348.htm | Tender doc6348.pdf | Provision of Aluminium partition for CSC in TE Building Krishna Square, Amritsar | 17-02-2011 15:00:00 |
17-02-2011 15:30:00 |
||
| APPLICATION6349.pdf | Provision of Aluminium partition for CSC in TE Building Krishna Square, Amritsar | 17-02-2011 15:00:00 |
17-02-2011 15:30:00 |
||||
| 66/EE/BSNL/CD/PTA/2010-11 dated : 07.02.11 | BSNL-6nit666351.htm | 1011nit666351.pdf | Construction of fibre sheet roof toilet with provision of underground soak pit chamber in rented T.E. building at Jakhwali. | 17-02-2011 15:00:00 |
17-02-2011 15:30:00 |
||
| 67/EE/BSNL/CD/JL/NIT/2010-11 dated 21/01/2011 | APPLICATION67.doc6262.doc | Miscellaneous civil works in BSNL Compound at MTS Nagar Jalandhar. | 03-02-2011 15:00:00 |
15-02-2011 15:30:00 |
|||
| 78/2010-11/EE/BSNL/CD/LDH Dated 03-02-2011 | BSNL W-6 NIT 786336.htm | NIT 78-10116336.doc | Conversion of Machine Room into store room and miscellaneous civil works in Unutilized Hall No. 1 in Central University of Punjab, Bathinda | 15-02-2011 15:00:00 |
15-02-2011 15:30:00 |
||
| 76/2010-11/EE/BSNL/CD/LDH Dated 28-01-2011 | Corrigendum_NIT 766347.doc | Raising of Cable duct manhole necks from CMC TE to Cheema Chowk via Kidwai Nagar, Issa Puli and from Cheema Chowk to CMC Hospital via Hargobind Nagar. (RE-CALL) | 15-02-2011 15:30:00 |
||||
| 69/EE/BSNL/CD/JL/NIT/2010-11 dated 05/02/2011 | NIT696344.htm | TENDERDOCUMENT696344.doc | Miscellaneous repairs and painting works in BSNL Quarters on change of occupancy under BSNL Civil Sub Division-II,jalandhar. | 14-02-2011 15:00:00 |
14-02-2011 15:30:00 |
||
| APPLICATION696345.doc | Miscellaneous repairs and painting works in BSNL Quarters on change of occupancy under BSNL Civil Sub Division-II,Jalandhar. | 14-02-2011 15:00:00 |
14-02-2011 15:30:00 |
||||
| 63/EE/BSNL/CD/ASR/10-11 Dated:- 27.01.2011 | NIT 2nd6291.htm | CSD-I_NIT 2 nd 6291.pdf | “Maintenance of Mobile Towers in SSA Amritsar under Civil Sub Division-I for the year 2010-11.” | 11-02-2011 15:00:00 |
11-02-2011 15:30:00 |
||
| 63/EE/BSNL/CD/ASR/10-11 Dated:- 27.01.2011 | NIT 2nd6292.htm | APPLICATION6292.pdf | “Maintenance of Mobile Towers in SSA Amritsar under Civil Sub Division-I for the year 2010-11.” | 11-02-2011 15:00:00 |
11-02-2011 15:30:00 |
||
| 64/EE/BSNL/CD/ASR/10-11 Dated:- 27.01.2011 | NIT 2nd6293.htm | CSD-II_NIT 2 nd 6293.pdf | “Maintenance of Mobile Towers in SSA Amritsar under Civil Sub Division-II for the year 2010-11.” | 11-02-2011 15:00:00 |
11-02-2011 15:30:00 |
||
| 64/EE/BSNL/CD/ASR/10-11 Dated:- 27.01.2011 | NIT 2nd6294.htm | APPLICATION6294.pdf | “Maintenance of Mobile Towers in SSA Amritsar under Civil Sub Division-II for the year 2010-11.” | 11-02-2011 15:00:00 |
11-02-2011 15:30:00 |
||
| 65/EE/BSNL/CD/ASR/2010-11 dated 29.01.2011 | NIT ASR6307.htm | Tender ASR6307.pdf | Infrastructure for Defence Project (NFS) - “Civil works consisting of Generator Plinth, Aluminum Partition ,False Ceiling etc. for Ascon Node at Amritsar (Punjab).” | 10-02-2011 15:00:00 |
10-02-2011 15:30:00 |
||
| APPLICATION Amritsar6308.pdf | Infrastructure for Defence Project (NFS) - “Civil works consisting of Generator Plinth, Aluminum Partition ,False Ceiling etc. for Ascon Node at Amritsar (Punjab).” | 10-02-2011 15:00:00 |
10-02-2011 15:30:00 |
||||
| 66/EE/BSNL/CD/ASR/2010-11 dated 29.01.2011 | NIT Beas6309.htm | Tender Beas6309.pdf | Infrastructure for Defence Project (NFS) - “Civil works consisting of Generator Plinth, Aluminum Partition ,False Ceiling etc. for Ascon Node at Beas (Punjab).” | 10-02-2011 15:00:00 |
10-02-2011 15:30:00 |
||
| APPLICATION Beas6310.pdf | Infrastructure for Defence Project (NFS) - “Civil works consisting of Generator Plinth, Aluminum Partition ,False Ceiling etc. for Ascon Node at Beas (Punjab).” | 10-02-2011 15:00:00 |
10-02-2011 15:30:00 |
||||
| 67/EE/BSNL/CD/ASR/2010-11 dated 29.01.2011 | NIT Tibri6311.htm | Tender Tibri6311.pdf | Infrastructure for Defence Project (NFS) - “Civil works consisting of Generator Plinth, Aluminum Partition ,False Ceiling etc. for Back Bone Node at Tibri (Punjab).” | 10-02-2011 15:00:00 |
10-02-2011 15:30:00 |
||
| APPLICATION Tibri6312.pdf | Infrastructure for Defence Project (NFS) - “Civil works consisting of Generator Plinth, Aluminum Partition ,False Ceiling etc. for Back Bone Node at Tibri (Punjab).” | 10-02-2011 15:00:00 |
10-02-2011 15:30:00 |
||||
| 68/EE/BSNL/CD/ASR/2010-11 dated 31.01.2011 | NIT6317.htm | Tender doc6317.pdf | Provision of Sign Boards for ground base and Roof Top Towers in SSA Amritsar | 10-02-2011 15:00:00 |
10-02-2011 15:30:00 |
||
| APPLICATION6318.pdf | Provision of Sign Boards for ground base and Roof Top Towers in SSA Amritsar | 10-02-2011 15:00:00 |
10-02-2011 15:30:00 |
||||
| 56/EE/BSNL/CD-II/CHD/2010-11 Dated: -02.02.2011 | 56w66332.htm | 56NIT6332.pdf | A/R & M/O to Type-VI staff quarter in Co-axial compound at Ropar. | 09-02-2011 15:00:00 |
09-02-2011 15:30:00 |
||
| 76/2010-11/EE/BSNL/CD/LDH Dated 28-01-2011 | BSNL W-6 NIT 766300.htm | NIT 76-10116300.doc | Raising of Cable duct manhole necks from CMC TE to Cheema Chowk via Kidwai Nagar, Issa Puli and from Cheema Chowk to CMC Hospital via Hargobind Nagar. (RE-CALL) | 08-02-2011 15:00:00 |
08-02-2011 15:30:00 |
||
| 55/EE/BSNL/CD/CHD-II/2010-201 1 Dated : 31-01-2011 | 55w66327.htm | 55NIT6327.pdf | Supply of Laptop for use in the % S.E.(C),BSNL,Civil Circle-II,Chandigarh. | 08-02-2011 15:00:00 |
08-02-2011 15:30:00 |
||
| 77/2010-11/EE/BSNL/CD/LDH Dated 28-01-2011 | BSNL W-6 NIT 776301.htm | NIT 77-10116301.doc | Miscellaneous Civil work in Unutilized Hall No 6 in Central University of Punjab Bathinda (SH:- Civil work in Auditorium) | 04-02-2011 15:00:00 |
04-02-2011 15:30:00 |
||
| 67/EE/BSNL/CD/JL/NIT/2010-11 dated 21/01/2011 | NIT676261.htm | TENDERDOCUMENT67.doc6261.doc | Miscellaneous civil works in BSNL Compound at MTS Nagar Jalandhar. | 03-02-2011 15:00:00 |
03-02-2011 15:30:00 |
||
| 68/EE/BSNL/CD/JL/NIT/2010-11 dated 21/01/2011 | NIT686263.htm | TENDERDOCUMENT686263.doc | Shifting of existing aluminium partition for installation of GPON equipment and provision of cash counter in rented T.E.building at Urban Estate,Phase-I,Jalandhar. | 03-02-2011 15:00:00 |
03-02-2011 15:30:00 |
||
| APPLICATION686264.doc | Shifting of existing aluminium partition for installation of GPON equipment and provision of cash counter in rented T.E.building at Urban Estate,Phase-I,Jalandhar. | 03-02-2011 15:00:00 |
03-02-2011 15:30:00 |
||||
| 65/EE/BSNL/CD/PTA/2010-11 dated : 24.01.2011 (2nd Call) | BSNL-6nit656278.htm | 1011nit656278.pdf | Construction of fibre sheet roof toilet with provision of underground soak pit chamber in rented T.E. building at Jakhwali. | 03-02-2011 15:00:00 |
03-02-2011 15:30:00 |
||
| 74/2010-11/EE/BSNL/CD/LDH Dated 22-01-2011 | BSNL W-6 NIT 746265.htm | NIT 74-10116265.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2011-12 (SH: Day to day Maintenance of all BSNL Buildings falling under local area of the Sub Division-I) | 01-02-2011 15:00:00 |
01-02-2011 15:30:00 |
||
| 75/2010-11/EE/BSNL/CD/LDH Dated 22-01-2011 | BSNL W-6 NIT 756266.htm | NIT 75-10116266.doc | Raising of Cable duct manhole necks from CMC TE to Cheema Chowk via Kidwai Nagar, Issa Puli and from Cheema Chowk to CMC Hospital via Hargobind Nagar | 01-02-2011 15:00:00 |
01-02-2011 15:30:00 |
||
| Corrigendum | Corrigendum_NIT 756272.doc | Raising of Cable duct manhole necks from CMC TE to Cheema Chowk via Kidwai Nagar, Issa Puli and from Cheema Chowk to CMC Hospital via Hargobind Nagar | 01-02-2011 15:30:00 |
||||
| 66/EE/BSNL/CD/JL/NIT/2010-11 dated 13/01/2011 | NIT666228.htm | TENDERDOCUMENT666228.doc | Annual Maintenance of Ground Based & Roof Top Towers in Jalandhar SSA, under BSNL Civil Sub-Division-II,Jalandhar (3rd Call). | 31-01-2011 15:00:00 |
31-01-2011 15:30:00 |
||
| APPLICATION666229.doc | Annual Maintenance of Ground Based & Roof Top Towers in Jalandhar SSA, under BSNL Civil Sub-Division-II,Jalandhar (3rd Call). | 31-01-2011 15:00:00 |
31-01-2011 15:30:00 |
||||
| 64/EE/BSNL/CD/PTA/2010-11 dated 22.01.2011 | BSNL-6nit646271.htm | 1011nit646271.pdf | Maintenance of water purifier ION EXCHANGE RO system of 5Lt. capacity from February 2011 to January 2012 installed in Staff Quarters/Inspection quarters in RTTC at Rajpura. | 31-01-2011 15:00:00 |
31-01-2011 15:30:00 |
||
| Corrigendum to NIT-64/EE/BSNL/CD/PTA/2010-11 dated 24.01.11 | corrinit646273.htm | corrinit646273.pdf | Maintenance of water purifier ION EXCHANGE RO system of 5Lt. capacity from February 2011 to January 2012 installed in Staff Quarters/Inspection quarters in RTTC at Rajpura | 31-01-2011 15:00:00 |
31-01-2011 15:30:00 |
||
| 63/EE/BSNL/CD/PTA/2010-11 dated 20.01.2011 | BSNL-6nit636259.htm | 1011nit636259.pdf | Provision of wall mounted wooden tables (with drawers) and Rubbing of the existing floor in proposed Product Demonstration lab (Room No. 218). in Admn. & Acadmic Block in RTTC at Rajpura. | 28-01-2011 15:00:00 |
28-01-2011 15:30:00 |
||
| 25/2010-11/EE/BSNL/CD-I/CHD Dated 19-1-2011 | 25NIT106258.htm | 25NIT106258.pdf | Hiring of vehicle for O/o Executive Engineer(C), BSNL Civil Division-I, Chandigarh. | 27-01-2011 15:00:00 |
27-01-2011 15:30:00 |
||
| 24/2010-11/EE/BSNL/CD-I/CHD dated 15-1-2011 | 24NIT106246.htm | 24NIT106246.pdf | Provision of additional chairs in conference hall O/o CGMT Building, Sector-34, Chandigarh. | 24-01-2011 15:00:00 |
24-01-2011 15:30:00 |
||
| 62/EE/BSNL/CD/PTA/2010-11 dated 14.01.2011 | BSNL-6nit626240.htm | 1011nit626240.pdf | Construction of fibre sheet roof toilet with provision of underground soak pit chamber in rented T.E. building at Jakhwali. | 22-01-2011 15:00:00 |
22-01-2011 15:30:00 |
||
| 63/EE/BSNL/CD/JL/NIT/2010-11 dated 11/01/2011 | NIT636215.htm | TENDERDOCUMENT636215.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under BSNL Civil Sub Division-I, Jalandhar (2nd Call). | 21-01-2011 15:00:00 |
21-01-2011 15:30:00 |
||
| APPLICATION636216.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under BSNL Civil Sub Division-I, Jalandhar (2nd Call). | 21-01-2011 15:00:00 |
21-01-2011 15:30:00 |
||||
| 64/EE/BSNL/CD/JL/NIT/2010-11 dated 11/01/2011 | NIT646217.htm | TENDERDOCUMENT646217.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under BSNL Civil Sub Division-II, Jalandhar. | 21-01-2011 15:00:00 |
21-01-2011 15:30:00 |
||
| APPLICATION646218.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under BSNL Civil Sub Division-II, Jalandhar. | 21-01-2011 15:00:00 |
21-01-2011 15:30:00 |
||||
| 65/EE/BSNL/CD/JL/NIT/2010-11 dated 11/01/2011 | NIT656219.htm | TENDERDOCUMENT656219.doc | Re-arrangement and providing and fixing of aluminium partitions at first floor & second floor and re-arrangement of wooden counters at first floor in Admn.Building at GTB Nagar, Jalandhar. | 21-01-2011 15:00:00 |
21-01-2011 15:30:00 |
||
| APPLICATION656220.doc | Re-arrangement and providing and fixing of aluminium partitions at first floor & second floor and re-arrangement of wooden counters at first floor in Admn.Building at GTB Nagar, Jalandhar. | 21-01-2011 15:00:00 |
21-01-2011 15:30:00 |
||||
| Q-No.15/EE/BSNL/CD/PTA/2010-11 dated 14.01.2011 | Q-156241.htm | Schedule of Quantity Q-156241.pdf | Provision of dry brick flooring in open verandah of rented TE building at Gharam.(2nd Call) | 19-01-2011 15:00:00 |
19-01-2011 15:30:00 |
||
| 73/2010-11/EE/BSNL/CD/LDH Dated 07-01-2011 | BSNL W-6 NIT 736205.htm | NIT 73-10116205.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2010-11 (SH: Day to day Maintenance for TE Buildings/Staff Quarters, Local Area under the Jurisdiction of BSNL Civil Sub Division-II, Ludhiana | 18-01-2011 15:00:00 |
18-01-2011 15:30:00 |
||
| 62/EE/BSNL/CD/ASR/20010-11 dated 07.01.2011 | NIT6206.htm | Tender CSC Albert6206.doc | Raising the floor level in front of Custmer Service Centre Albert Road, Amritsar | 17-01-2011 15:00:00 |
17-01-2011 15:30:00 |
||
| APPLICATIO16207.doc | Raising the floor level in front of Custmer Service Centre Albert Road, Amritsar | 17-01-2011 15:00:00 |
17-01-2011 15:30:00 |
||||
| 71/2010-11/EE/BSNL/CD/LDH Dated 04-01-2011 | BSNL W-6 NIT 716199.htm | NIT 71-10116199.doc | Repair and painting of rear side and front side wall of academic block and provision of glazed tile in canteen in Central University Bathinda | 15-01-2011 15:00:00 |
15-01-2011 15:30:00 |
||
| 72/2010-11/EE/BSNL/CD/LDH Dated 04-01-2011 | BSNL W-6 NIT 726200.htm | NIT 72-10116200.doc | Provision of steel gates and toughened Glass door in Central University of Punjab Bathinda | 15-01-2011 15:00:00 |
15-01-2011 15:30:00 |
||
| 70/2010-11/EE/BSNL/CD/LDH Dated 30-12-2010 | BSNL W-6 NIT 706177.htm | NIT 70-10116177.doc | “Miscellaneous Civil work in Labs/Rooms, Toilets and Corridors in front of Unutilized Hall No. 6 in Central University of Punjab Bathinda” | 12-01-2011 15:00:00 |
12-01-2011 15:30:00 |
||
| 54/EE/BSNL/CD-II/CHD/2010-11 dated 30.12.2010 | 54W66179.htm | 54nit10-116179.pdf | Construction of Access node building for NFS project at Chandimandir. | 12-01-2011 15:00:00 |
12-01-2011 15:30:00 |
||
| 70/2010-11/EE/BSNL/CD/LDH Dated 30-12-2010 | BSNL W-6 NIT 706180.htm | NIT 70-10116180.doc | Miscellaneous Civil work in Labs/Rooms, Toilets and Corridors in front of Unutilized Hall No. 6 in Central University of Punjab Bathinda | 12-01-2011 15:00:00 |
12-01-2011 15:30:00 |
||
| 31/2010-11/EE/BSNL/CD/FZR | NIT316164.html | Tenderdocument316164.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2010-2011 (SH- AMC of chlorination plant with supply of chemical in P&T colony at Ferozepur Cantt) | 06-01-2011 15:00:00 |
06-01-2011 15:30:00 |
||
| 32/2010-11/EE/BSNL/CD/FZR | NIT326165.html | Tenderdocument326165.doc | A/R & M/O to BSNL buildings in Ferozepur SSA for the year 2010-11 (SH: Maintenance and operational jobs in the O/o Executive Engineer (C), BSNL Civil Division, Ferozepur & O/o BSNL Civil Sub Division- | 06-01-2011 15:00:00 |
06-01-2011 15:30:00 |
||
| 33/2010-11/EE/BSNL/CD/FZR | NIT336166.html | Tenderdocument336166.doc | Maintenance of lawns in P&T colony Ferozepur Cantt, TE building & staff quarters Faridkot & staff colony Kotkapura during 2010-11 (Phase-II) | 06-01-2011 15:00:00 |
06-01-2011 15:30:00 |
||
| 34/2010-11/EE/BSNL/CD/FZR | NIT346167.html | Tenderdocument346167.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2010-2011 (SH- Maintenance of lawns in GMT Complex and Inspection Quarters at Ferozepur Cantt)-2nd call | 06-01-2011 15:00:00 |
06-01-2011 15:30:00 |
||
| 31/2010-11/EE/BSNL/CD/FZR | corrigendum6198.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2010-2011 (SH- AMC of chlorination plant with supply of chemical in P&T colony at Ferozepur Cantt) | 06-01-2011 15:30:00 |
||||
| 61/EE/BSNL/CD/JL/NIT/JL/2010-11 dated 22/12/2010. | NIT616145.htm | TENDERDOCUMENT616145.doc | Infrastructure for Defence Project (NFS):-“Civil works for Ascon Node at Jalandhar.” | 04-01-2011 15:00:00 |
04-01-2011 15:30:00 |
||
| APPLICATION616146.doc | Infrastructure for Defence Project (NFS):-“Civil works for Ascon Node at Jalandhar.” | 04-01-2011 15:00:00 |
04-01-2011 15:30:00 |
||||
| 29/2010-11/EE/BSNL/CD/FZR | NIT296150.html | Tenderdocument296150.doc | Infrastructure for defence project (NFS) – “Civil works for access node at Faridkot-2nd call” | 04-01-2011 15:00:00 |
04-01-2011 15:30:00 |
||
| 30/2010-11/EE/BSNL/CD/FZR | NIT306151.html | Tenderdocument306151.doc | Infrastructure for defence project (NFS) – “Civil works for ascon node at Abohar-2nd call.” | 04-01-2011 15:00:00 |
04-01-2011 15:30:00 |
||
| 53/EE/BSNL/CD-II/CHD/2010-11 Dated:23.12.2010 | 53 W66152.htm | 53NIT10-116152.pdf | Construction of tower foundation for 40M NBLW type tower (Based on GR/TWR-04/01) at Krishna Enclave,Kharar,Distt. Mohali of Chandigarh SSA. | 01-01-2011 15:00:00 |
01-01-2011 15:30:00 |
||
| 62/EE/BSNL/CD/JL/NIT/2010-11 dated 22/12/2010 | NIT626147.htm | TENDERDOCUMENT626147.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under BSNL Civil Sub Division-I, Jalandhar. ” | 31-12-2010 15:00:00 |
31-12-2010 15:30:00 |
||
| APPLICATION626148.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under BSNL Civil Sub Division-I, Jalandhar. ” | 31-12-2010 15:00:00 |
31-12-2010 15:30:00 |
||||
| 60/EE/BSNL/CD/PTA/2010-11 dated 16.12.2010 | BSNL-6nit606112.htm | 1011nit606112.pdf | Construction of composite Type Node (C1) for N.F.S. (Under Project Kranti ) at Nabha. | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||
| 61/EE/BSNL/CD/PTA/2010-11 dated 16.12.2010 | BSNL-6nit616113.htm | 1011nit616113.pdf | Construction of Back Bone Node Type-2 building NFS Project at Sangrur. | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||
| 54/EE/BSNL/CD/ASR/201011 dated 20.12.2010 | NIT Goindwal6122.htm | Tender Goindwal6122.doc | Maintenance of Horticulture works in BSNL compound at Goindwal Sahib during the year 2010-11(Phase-II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||
| APPLICATION Goindwal doc6123.doc | Maintenance of Horticulture works in BSNL compound at Goindwal Sahib during the year 2010-11(Phase-II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||||
| 55/EE/BSNL/CD/ASR/201011 dated 20.12.2010 | NIT KSS6124.htm | Tender kSS & Chherta6124.doc | Maintenance of Horticulture works in BSNL compound at Chheharta & Katra Sher Singh Amritsar during the year 2010-11(Phase-II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||
| APPLICATION KSS doc6125.doc | Maintenance of Horticulture works in BSNL compound at Chheharta & Katra Sher Singh Amritsar during the year 2010-11(Phase-II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||||
| 56/EE/BSNL/CD/ASR/201011 dated 20.12.2010 | NIT Ranjit6126.htm | Tender Ranjit Avnnue6126.doc | Maintenance of Horticulture works in BSNL compound at Ranjit Avenue Amritsar during the year 2010-11(Phase-II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||
| APPLICATION Ranjit doc6127.doc | Maintenance of Horticulture works in BSNL compound at Ranjit Avenue Amritsar during the year 2010-11(Phase-II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||||
| 57/EE/BSNL/CD/ASR/201011 dated 20.12.2010 | NIT Goal Bagh6128.htm | Tender Goal Bagh6128.doc | Maintenance of Horticulture works in BSNL compound at P&T colony Goal Bagh Amritsar during the year 2010-11(Phase-II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||
| APPLICATION Goal doc6129.doc | Maintenance of Horticulture works in BSNL compound at P&T colony Goal Bagh Amritsar during the year 2010-11(Phase-II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||||
| 58/EE/BSNL/CD/ASR/201011 dated 20.12.2010 | NIT Batala6130.htm | Tender Batala6130.doc | -Maintenance of Horticulture works in B.S.N.L. Compound at Batala during theYear 2010-11 (Phase -II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||
| APPLICATIONBatala6131.doc | -Maintenance of Horticulture works in B.S.N.L. Compound at Batala during theYear 2010-11 (Phase -II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||||
| 59/EE/BSNL/CD/ASR/201011 dated 20.12.2010 | NIT GRDM6132.htm | Tender GRDM6132.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg, Amritsar during theYear 2010-11 (Phase -II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||
| APPLICATION GRDM6133.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg, Amritsar during theYear 2010-11 (Phase -II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||||
| 60/EE/BSNL/CD/ASR/201011 dated 20.12.2010 | NITJandiala6134.htm | Tender Jandiala6134.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Jandiala Guru , (Amritsar) during theYear 2010-11 (Phase -II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||
| APPLICATION Jandiala6135.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Jandiala Guru , (Amritsar) during theYear 2010-11 (Phase -II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||||
| 61/EE/BSNL/CD/ASR/201011 dated 20.12.2010 | NIT Mall6137.htm | Tender Mall Mandi6137.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Mall Mandi, Amritsar during theYear 2010-11 (Phase -II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||
| APPLICATION Mall6138.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Mall Mandi, Amritsar during theYear 2010-11 (Phase -II). | 30-12-2010 15:00:00 |
30-12-2010 15:30:00 |
||||
| 64/2010-11/EE/BSNL/CD/LDH Dated 13-12-2010 | BSNL W-6 NIT 646087.htm | NIT 64-10116087.doc | Infrastructure for Defence Project (NFS) - “Civil works for Access Node at Bathinda Cantt.” | 28-12-2010 15:00:00 |
28-12-2010 15:30:00 |
||
| 65/2010-11/EE/BSNL/CD/LDH Dated 13-12-2010 | BSNL W-6 NIT 656088.htm | NIT 65-10116088.doc | Infrastructure for Defence Project (NFS) - “Civil works for Ascon Node at Bathinda Cantt.” | 28-12-2010 15:00:00 |
28-12-2010 15:30:00 |
||
| 62/2010-11/EE/BSNL/ | BSNL W-6 NIT 626072.htm | NIT 62-10116072.doc | Annual Maintenance of Ground Based and Roof top Towers in Ludhiana SSA under Civil Sub Division –II, Ludhiana for the year | 27-12-2010 15:00:00 |
27-12-2010 15:30:00 |
||
| 63/2010-11/EE/BSNL | BSNL W6-NIT636074.htm | NIT 63-10116074.doc | Annual Maintenance of Ground Based and Roof top Towers in Ludhiana SSA under Civil sub Division-I for the year 2010-11 | 27-12-2010 15:00:00 |
27-12-2010 15:30:00 |
||
| 52/EE/BSNL/CD-II/CHD/2010-11 dated:-15.12.2010 | 52W-66096.htm | 52NIT10-11A6096.pdf | Construction of Access node building for NFS project at Chandimandir. | 27-12-2010 15:00:00 |
27-12-2010 15:30:00 |
||
| 52NIT10-11B6097.pdf | Painting, tightening of nuts and bolts, providing aviation lights etc existing towers in Ropar SSA. | 27-12-2010 15:00:00 |
27-12-2010 15:30:00 |
||||
| 66/2010-11/EE/BSNL/CD/LDH Dated 16-12-2010 | BSNL W-6 NIT 666106.htm | NIT 66-10116106.doc | Providing water proof treatment to the roof of library and computer lab in Central University of Punjab Bathinda (RE-CALL) | 23-12-2010 15:00:00 |
23-12-2010 15:30:00 |
||
| 67/2010-11/EE/BSNL/CD/LDH Dated 16-12-2010 | BSNL W-6 NIT 676107.htm | NIT 67-10116107.doc | Provision of aluminium partition in Molecular biological lab and provision for ventilators in corridors in Central University of Punjab Bathinda (RE-CALL) | 23-12-2010 15:00:00 |
23-12-2010 15:30:00 |
||
| 68/2010-11/EE/BSNL/CD/LDH Dated 16-12-2010 | BSNL W-6 NIT 686108.htm | NIT 68-10116108.doc | Provision of Separation Panel for Library, Computer Lab and Hall No. 5 in Central University of Punjab Bathinda (RE-CALL) | 23-12-2010 15:00:00 |
23-12-2010 15:30:00 |
||
| 69/2010-11/EE/BSNL/CD/LDH Dated 16-12-2010 | BSNL W-6 NIT 696109.htm | NIT 69-10116109.doc | Addition/Alteration for proposed Internet Data Centre (IDC) at Third floor in T.E. Bldg. at Transport Nagar, Ludhiana | 23-12-2010 15:00:00 |
23-12-2010 15:30:00 |
||
| 24/2010-11/EE/BSNL/CD/FZR | NIT246046.html | Tenderdocument246046.doc | Infrastructure for defence project (NFS) - "Civil works for access node at Faridkot." | 22-12-2010 15:00:00 |
22-12-2010 15:30:00 |
||
| 25/2010-11/EE/BSNL/CD/FZR | NIT256047.html | Tenderdocument256047.doc | Infrastructure for defence project (NFS) - "Civil works for access node at Ferozepur Cantt." | 22-12-2010 15:00:00 |
22-12-2010 15:30:00 |
||
| 26/2010-11/EE/BSNL/CD/FZR | NIT266048.html | Tenderdocument266048.doc | Infrastructure for defence project (NFS) - "Civil works for access node at Abohar." | 22-12-2010 15:00:00 |
22-12-2010 15:30:00 |
||
| 27/2010-11/EE/BSNL/CD/FZR | NIT276049.html | Tenderdocument276049.doc | Infrastructure for defence project (NFS) - "Civil works for ascon node at Ferozepur Cantt." | 22-12-2010 15:00:00 |
22-12-2010 15:30:00 |
||
| 28/2010-11/EE/BSNL/CD/FZR | NIT286065.html | Tenderdocument286065.doc | A/R & M/O to BSNL Buildings in Ferozepur SSA for the year 2010-2011 (SH- Maintenance of lawns in GMT Complex and Inspection Quarters at Ferozepur Cantt). | 22-12-2010 15:00:00 |
22-12-2010 15:30:00 |
||
| 48/EE/BSNL/CD/CHD_II/2010-2011 Dated:-02.12.2010 | 48NIT10-11B6019.pdf | Construction of Back Bone Node building for NFS Project at Chandimandir | 21-12-2010 15:00:00 |
21-12-2010 15:30:00 |
|||
| 51/EE/BSNL/CD-II/CHD/2010-2011 dated 13.12.2010 | 51w66084.htm | 51NIT10-116084.pdf | Painting, tightening of nuts and bolts, providing aviation lights etc existing towers in Ropar SSA. | 21-12-2010 15:00:00 |
21-12-2010 15:30:00 |
||
| Corrigendum | Corrigendum Nit516089.htm | Painting, tightening of nuts and bolts, providing aviation lights etc existing towers in Ropar SSA. | 21-12-2010 15:30:00 |
||||
| 59/EE/BSNL/CD/JL/NIT/2010-11 dated 02/12/2010 | NIT596008.htm | TENDERDOCUMENT596008.doc | Annual Maintenance of Ground Based & Roof Top Towers in Jalandhar SSA, under BSNL Civil Sub-Division-I,Jalandhar (2nd Call). | 20-12-2010 15:00:00 |
20-12-2010 15:30:00 |
||
| APPLICATION596009.doc | Annual Maintenance of Ground Based & Roof Top Towers in Jalandhar SSA, under BSNL Civil Sub-Division-I,Jalandhar (2nd Call). | 20-12-2010 15:00:00 |
20-12-2010 15:30:00 |
||||
| 60/EE/BSNL/CD/JL/NIT/2010-11 dated 02/12/2010 | NIT606010.htm | TENDERDOCUMENT606010.doc | Annual Maintenance of Ground Based & Roof Top Towers in Jalandhar SSA, under BSNL Civil Sub-Division-II,Jalandhar (2nd Call). | 20-12-2010 15:00:00 |
20-12-2010 15:30:00 |
||
| APPLICATION606011.doc | Annual Maintenance of Ground Based & Roof Top Towers in Jalandhar SSA, under BSNL Civil Sub-Division-II,Jalandhar (2nd Call). | 20-12-2010 15:00:00 |
20-12-2010 15:30:00 |
||||
| 59/EE/BSNL/CD/PTA/2010-11 dated 07.12.2010 | BSNL-6nit596061.htm | 1011nit596061.pdf | Construction of composite Type Node (C1) for N.F.S. with part new construction & part addition/alteration in existing Signalcentre at Mall road Patiala. | 20-12-2010 15:00:00 |
20-12-2010 15:30:00 |
||
| Corrigendum to nit59/EE/BSNL/CD/PTA/2010-11 dated 07.12.2010 | Corrinit596105.htm | corrinit596105.pdf | Construction of composite Type Node (C1) for N.F.S. with part new construction & part addition/alteration in existing Signal centre at Mall road Patiala. | 20-12-2010 15:00:00 |
20-12-2010 15:30:00 |
||
| NIT No: 54/EE/BSNL/CD/ASR/10-11 Dated:- 04.12.2010 | NIT6035.htm | CSD-I_NIT6035.pdf | Maintenance of Mobile Towers in SSA Amritsar under Civil Sub Division-I for the year 2010-11. | 16-12-2010 15:00:00 |
16-12-2010 15:30:00 |
||
| APPLICATION6036.pdf | Maintenance of Mobile Towers in SSA Amritsar under Civil Sub Division-I for the year 2010-11. | 16-12-2010 15:00:00 |
16-12-2010 15:30:00 |
||||
| 55/EE/BSNL/CD/ASR/10-11 Dated:- 04.12.2010 | BSNL W6037.htm | CSD-II_NIT6037.pdf | Maintenance of Mobile Towers in SSA Amritsar under Civil Sub Division-II for the year 2010-11.” | 16-12-2010 15:00:00 |
16-12-2010 15:30:00 |
||
| APPLICATION6038.pdf | Maintenance of Mobile Towers in SSA Amritsar under Civil Sub Division-II for the year 2010-11.” | 16-12-2010 15:00:00 |
16-12-2010 15:30:00 |
||||
| 56/EE/BSNL/CD/PTA/2010-11 dated 06.12.2010. | BSNL-6nit566039.htm | 1011nit566039.pdf | A/R & M/o to R.L.U Building at Jhaloor (Internal Portion) SSA Sangrur. | 16-12-2010 15:00:00 |
16-12-2010 15:30:00 |
||
| 57/EE/BSNL/CD/PTA/2010-11 dated 06.12.2010 | BSNL-6nit576040.htm | 1011nit576040.pdf | A/R & M/o to R.L.U Building at Sekha (Internal Portion) SSA Sangrur. | 16-12-2010 15:00:00 |
16-12-2010 15:30:00 |
||
| 58/EE/BSNL/CD/PTA/2010-11 dated 06.12.2010 | BSNL-6nit586041.htm | 1011nit586041.pdf | A/R & M/o to R.L.U Building at Gehal (Internal Portion) SSA Sangrur. | 16-12-2010 15:00:00 |
16-12-2010 15:30:00 |
||
| 52/EE/BSNL/CD/ASR/2010-11dated 02.12.2010 | NIT6015.htm | Tender doc6015.doc | Construction of damaged boundary wall at Co-axial quarter Gurdaspur | 10-12-2010 15:00:00 |
15-12-2010 15:30:00 |
||
| 232010-11/EE/BSNL/CD/FZR | NIT236031.html | Tenderdocument236031.doc | Renovation of room No. 108 & 109 at Ist floor in old GMT building (TRA section) at Ferozepur Cantt. | 15-12-2010 15:00:00 |
15-12-2010 15:30:00 |
||
| 50/EE/BSNL/CD-II/CHD/CSD-PKL/2010-11 dated 06.12.2010 | 50w66042.htm | 50NIT10-116042.pdf | Construction of tower foundations for 4 Nos. 40M TCS type tower including erection works(Based on GR/TWR-12/01)(TCS type) in Chandigarh SSA (SH: Restoration work for dwarf wall, rain water chambers an | 15-12-2010 15:00:00 |
15-12-2010 15:30:00 |
||
| 59/2010-11/EE/BSNL/CD/LDH Dated 07-12-2010 | BSNL W-6 NIT 596058.htm | NIT 59-10116058.doc | Providing water proof treatment to the roof of library and computer lab in Central University of Punjab Bathinda (RE-CALL) | 15-12-2010 15:00:00 |
15-12-2010 15:30:00 |
||
| 60/2010-11/EE/BSNL/CD/LDH Dated 07-12-2010 | BSNL W-6 NIT 606059.htm | NIT 60-10116059.doc | Provision of aluminium partition in Molecular biological lab and provision for ventilators in corridors in Central University of Punjab Bathinda (RE-CALL) | 15-12-2010 15:00:00 |
15-12-2010 15:30:00 |
||
| 61/2010-11/EE/BSNL/CD/LDH Dated 07-12-2010 | BSNL W-6 NIT 616060.htm | NIT 61-10116060.doc | Provision of Separation Panel for Library, Computer Lab and Hall No. 5 in Central University of Punjab Bathinda(RE-CALL) | 15-12-2010 15:00:00 |
15-12-2010 15:30:00 |
||
| 48/EE/BSNL/CD/CHD_II/2010-2011 Dated:-02.12.2010 | 48W66018.htm | 48NIT10-11A6018.pdf | Construction of Access node building for NFS project at Chandimandir. | 14-12-2010 15:00:00 |
14-12-2010 15:30:00 |
||
| 49/EE/BSNL/CD-II/CHD/2010-11 Dated:-04.12.2010 | 49W66034.htm | 49NIT10-116034.pdf | Maintenance of Horticulture work in Telephone Exchange Compound at Phase-IV,I/Area Phase-VIII,Sector-53 and Sector-70 at Mohali from 01.01.2011 to 31.12.2011. | 14-12-2010 15:00:00 |
14-12-2010 15:30:00 |
||
| Q-14/EE/BSNL/CD/PTA/2010-11 dated: 08.12.2010 | Q-146064.htm | Schedule of Quantity Q-146064.pdf | Provision of dry brick flooring in open verandah of rented TE building at Gharam. | 14-12-2010 15:00:00 |
14-12-2010 15:30:00 |
||
| 47/EE/BSNL/CD/ASR/10-11 | Corrigendum NFS6078.doc | Infrastructure for Defence Project (NFS) —“Civil works for Composite Node C-1 Type at Pathankot (Punjab).” | 14-12-2010 15:30:00 |
||||
| NIT PKT5986.htm | NIT NFS PKT_5986.pdf | Infrastructure for Defence Project (NFS) —“Civil works for Composite Node C-1 Type at Pathankot (Punjab).” | 13-12-2010 15:00:00 |
13-12-2010 15:30:00 |
|||
| APPLICATION5987.pdf | Infrastructure for Defence Project (NFS) — “Civil works for Composite Node C-1 Type at Pathankot (Punjab).” | 13-12-2010 15:00:00 |
13-12-2010 15:30:00 |
||||
| 48/EE/BSNL/CD/ASR/10-11 Dated:- 27.11.2010 | NIT ASR-A-15988.htm | NIT Access Node-Asr_5988.pdf | Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-1 Type at Amritsar (Punjab).” | 13-12-2010 15:00:00 |
13-12-2010 15:30:00 |
||
| 48/EE/BSNL/CD/ASR/10-11 Dated:- 27.11.2010 | APPLICATION5989.pdf | Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-1 Type at Amritsar (Punjab).” | 13-12-2010 15:00:00 |
13-12-2010 15:30:00 |
|||
| 49/EE/BSNL/CD/ASR/10-11 Dated:- 27.11.2010 | NIT Beas5990.htm | NITBeas_5990.pdf | “Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-2 Type at Beas (Punjab).” | 13-12-2010 15:00:00 |
13-12-2010 15:30:00 |
||
| 49/EE/BSNL/CD/ASR/10-11 Dated:- 27.11.2010 | APPLICATION5991.pdf | “Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-2 Type at Beas (Punjab).” | 13-12-2010 15:00:00 |
13-12-2010 15:30:00 |
|||
| 50/EE/BSNL/CD/ASR/10-11 Dated:- 27.11.2010 | BSNL W5992.htm | NIT Access Node-Tibri_5992.pdf | Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-2 Type at Tibri, Dist. Gurdaspur (Punjab).” | 13-12-2010 15:00:00 |
13-12-2010 15:30:00 |
||
| 50/EE/BSNL/CD/ASR/10-11 Dated:- 27.11.2010 | APPLICATION5993.pdf | Infrastructure for Defence Project (NFS) - “Civil works for Access Node A-2 Type at Tibri, Dist. Gurdaspur (Punjab).” | 13-12-2010 15:00:00 |
13-12-2010 15:30:00 |
|||
| 51/EE/BSNL/CD/ASR/10-11 Dated:- 27.11.2010 | NIT Khasa5994.htm | NIT Bacbone Khasa_5994.pdf | Infrastructure for Defence Project (NFS) - “Civil works for Back Bone Node TYPE-2 at Khasa, Dist. Amritsar.” | 13-12-2010 15:00:00 |
13-12-2010 15:30:00 |
||
| 51/EE/BSNL/CD/ASR/10-11 Dated:- 27.11.2010 | APPLICATION5995.pdf | Infrastructure for Defence Project (NFS) - “Civil works for Back Bone Node TYPE-2 at Khasa, Dist. Amritsar.” | 13-12-2010 15:00:00 |
13-12-2010 15:30:00 |
|||
| 47/EE/BSNL/CD/ASR/10-11 | Corrigendum NFS6080.doc | Infrastructure for Defence Project (NFS) —“Civil works for Composite Node C-1 Type at Pathankot (Punjab).” | 13-12-2010 15:30:00 |
||||
| Corrigendum | Corrigendum NFS6081.doc | Infrastructure for Defence Project (NFS) —“Civil works for Composite Node C-1 Type at Pathankot (Punjab).” | 13-12-2010 15:30:00 |
||||
| 54/EE/BSNL/Cd/PTA/2010-11 dated 30.11.2010 | BSNL-6nit546000.htm | 1011nit546000.pdf | A/R & M/O to R.L.U. building and compound wall at Tripuri Patiala | 10-12-2010 15:00:00 |
10-12-2010 15:30:00 |
||
| 55/EE/BSNL/CD/PTA/2010-11 dated 30.11.2010. | BSNL-6nit556001.htm | 1011nit556001.pdf | A/R & M/O to T.E. building and compound wall at Urban Estate Phase-II Patiala. | 10-12-2010 15:00:00 |
10-12-2010 15:30:00 |
||
| 52/EE/BSNL/CD/ASR/2010-11dated 02.12.2010 | APPLICATION6016.doc | Construction of damaged boundary wall at Co-axial quarter Gurdaspur | 10-12-2010 15:00:00 |
10-12-2010 15:30:00 |
|||
| NIT6017.htm | Corri6017.doc | Construction of damaged boundary wall at Co-axial quarter Gurdaspur | 10-12-2010 15:00:00 |
10-12-2010 15:30:00 |
|||
| 53/EE/BSNL/CD/ASR/2010-11 dated 03.12.2010 | NIT6029.htm | Tender Doc6029.doc | Sealing of Cable entry points of Cable duct Chambers in the area under DET Batala” | 10-12-2010 15:00:00 |
10-12-2010 15:30:00 |
||
| APPLICATION6030.doc | Sealing of Cable entry points of Cable duct Chambers in the area under DET Batala” | 10-12-2010 15:00:00 |
10-12-2010 15:30:00 |
||||
| 57/EE/BSNL/CD/JAL/NIT/2010-11 dated 26.11.2010 | NIT575970.htm | TENDERDOCUMENT575970.doc | Infrastructure for Defence Project (NFS):-“Civil works for Access Node A1 Type at Jalandhar." | 09-12-2010 15:00:00 |
09-12-2010 15:30:00 |
||
| 57/EE/BSNL/CD/JL/NIT/2010-11 dated 26.11.2010 | NIT575971.htm | TENDERDOCUMENT575971.doc | Infrastructure for Defence Project (NFS):-“Civil works for Access Node A1 Type at Jalandhar.” | 09-12-2010 15:00:00 |
09-12-2010 15:30:00 |
||
| 57/EE/BSNL/CD/JL/NIT/2010-11 dated 26.11.2010 | NIT575972.htm | APPLICATION575972.doc | Infrastructure for Defence Project (NFS):-“Civil works for Access Node A1 Type at Jalandhar.” | 09-12-2010 15:00:00 |
09-12-2010 15:30:00 |
||
| 58/EE/BSNL/CD/JL/NIT/2010-11 dated 26.11.2010 | NIT585973.htm | TENDERDOCUMENT585973.doc | Infrastructure for Defence Project (NFS):-“Civil works for Composite Node Type-2 at Kapurthala.” | 09-12-2010 15:00:00 |
09-12-2010 15:30:00 |
||
| 58/EE/BSNL/CD/JL/NIT/2010-11 dated 26.11.2010 | NIT585974.htm | APPLICATION585974.doc | Infrastructure for Defence Project (NFS):-“Civil works for Composite Node Type-2 at Kapurthala.” | 09-12-2010 15:00:00 |
09-12-2010 15:30:00 |
||
| 19/2010-11/EE/BSNL/CD/FZR | NIT195939.html | Tenderdocument195939.doc | Infrastructure for defence project (NFS)–“Civil works for ascon node at Nathewala (Faridkot)” | 08-12-2010 15:00:00 |
08-12-2010 15:30:00 |
||
| 20/2010-11/EE/BSNL/CD/FZR | NIT205940.html | Tenderdocument205940.doc | Infrastructure for defence project (NFS) – “Civil works for access node at Fazilka” | 08-12-2010 15:00:00 |
08-12-2010 15:30:00 |
||
| 21/2010-11/EE/BSNL/CD/FZR | NIT215941.html | Tenderdocument215941.doc | Infrastructure for defence project (NFS) – “Civil works for ascon node at Abohar.” | 08-12-2010 15:00:00 |
08-12-2010 15:30:00 |
||
| 22/2010-11/EE/BSNL/CD/FZR | NIT225942.html | Tenderdocument225942.doc | Infrastructure for defence project (NFS) – “Civil works for ascon node at Mukatsar.” | 08-12-2010 15:00:00 |
08-12-2010 15:30:00 |
||
| No.47/EE/BSNL/CD-II/Chd/2010-2011 Dated: 26.11.2010 | 47nitw65983.htm | 47NIT10-115983.pdf | NIT for Day to day maintenance in the area under the jurisdiction of SDE(C) CSD Panchkula for the period Dec 2010 to June 2011. | 06-12-2010 15:00:00 |
06-12-2010 15:30:00 |
||
| 53/EE/BSNL/CD/PTA/2010-2011 Dated: 22.11.2010 | BSNL-6nit535936.htm | 1011nit535936.pdf | A/R & M/O to RLU building and compound wall at Dhablan. | 30-11-2010 15:00:00 |
30-11-2010 15:30:00 |
||
| 57/2010-11/EE/BSNL/CD/LDH Dated 20-11-2010 | BSNL W-6 NIT 575929.htm | NIT 57-10115929.doc | Repair and renovation of 40 No rooms for convert into Hostel in Central university of Punjab Bathinda. (SH: Painting of central university Camp Office compound wall and Qtr No D- 13 Civil Station Bat | 29-11-2010 15:00:00 |
29-11-2010 15:30:00 |
||
| 56/EE/BSNL/CD/JL/NIT/2010-11 dated 18/11/2010 | NIT565906.htm | TENDERDOCUMENT565906.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under Hoshiarpur SSA (Recall). | 26-11-2010 15:00:00 |
26-11-2010 15:30:00 |
||
| APPLICATION565907.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under Hoshiarpur SSA (Recall). | 26-11-2010 15:00:00 |
26-11-2010 15:30:00 |
||||
| 56/2010-11/EE/BSNL/CD/LDH Dated: 10-11-2010 | BSNL W-6 NIT 565886.htm | NIT 56-10115886.doc | Infrastructure for Defence Project (NFS) - “Civil works for Composite Node (C-I) at Ludhiana | 25-11-2010 15:00:00 |
25-11-2010 15:30:00 |
||
| 51/EE/BSNL/CD/PTA/2010-11 DATED : 10.11.2010. | BSNL6nit515887.htm | 1011nit515887.pdf | Erection and Painting work of 40M TCS type tower (Based on GR/TWR-12/01) at Arey Mill Compound, Amloh Road, Mandi Gobindgarh in Patiala SSA. | 24-11-2010 15:00:00 |
24-11-2010 15:30:00 |
||
| 52/EE/BSNL/CD/PTA/2010-11 DATED: 10.11.2010. | BSNL-6nit525888.htm | 1011nit525888.pdf | A/R & M/O to SBS Hostel in RTTC at Rajpura. | 24-11-2010 15:00:00 |
24-11-2010 15:30:00 |
||
| 46/EE/BSNL/CD/ASR/20010-11 dated 12.11.2010 | Nit5895.htm | Tender Doc5895.pdf | Provision of Antistatic Flooring in the Switch Room of Krishna Square,Verka & Majitha Road Exchange at Amritsar. | 22-11-2010 15:00:00 |
22-11-2010 15:30:00 |
||
| APPLICATION5896.pdf | Provision of Antistatic Flooring in the Switch Room of Krishna Square,Verka & Majitha Road Exchange at Amritsar. | 22-11-2010 15:00:00 |
22-11-2010 15:30:00 |
||||
| 49/EE/BSNL/CD/PTA/2010-2011 Dated : - 08.11.2010. | BSNL6nit495868.htm | 1011nit495868.pdf | A/R & M/O to T.E building at Lalru in SDCA Zirakpur | 20-11-2010 15:00:00 |
20-11-2010 15:30:00 |
||
| 50/EE/BSNL/CD/PTA/2010-2011 Dated : - 08.11.2010. | BSNL6nit505870.htm | 1011nit505870.pdf | A/R & M/O to T.E building at Banur in SDCA Rajpura. | 20-11-2010 15:00:00 |
20-11-2010 15:30:00 |
||
| 48/EE/BSNL/CD/PTA/2010-11 dated: 04.11.2010. | BSNL-6nit485853.htm | 1011nit485853.pdf | A/R & M/O to T.E building at Derra Bassi in SDCA Zirakpur. | 18-11-2010 15:00:00 |
18-11-2010 15:30:00 |
||
| 43/EE/BSNL/CD/ASR/2010-11 dated 06.11.2010 | NIT5861.htm | Tender Document Rayya5861.pdf | Provision of Antistatic flooring at NTR Room, OFC Station ,Rayya . | 18-11-2010 15:00:00 |
18-11-2010 15:30:00 |
||
| APPLICATION Rayya5862.pdf | Provision of Antistatic flooring at NTR Room, OFC Station ,Rayya . | 18-11-2010 15:00:00 |
18-11-2010 15:30:00 |
||||
| 44/EE/BSNL/CD/ASR/2010-11 dated 06.11.2010 | NIt Goindwal5863.htm | Tender Doc Goindwal5863.pdf | Provision of antistatic flooring in NTR equipment room at T.E. building Goindwal and Bhikhiwind. | 18-11-2010 15:00:00 |
18-11-2010 15:30:00 |
||
| APPLICATION Goindwal5864.pdf | Provision of antistatic flooring in NTR equipment room at T.E. building Goindwal and Bhikhiwind. | 18-11-2010 15:00:00 |
18-11-2010 15:30:00 |
||||
| 45/EE/BSNL/CD/ASR/2010-11 dated 06.11.2010 | NIT Batala5865.htm | Tender Doc Batala5865.pdf | ARMO to BSNL Buildings and staff Quarters in SSA Pathankot during the year 2010-11. (SH: Cleaning of terraces,water storage tanks & Jungle cutting in the BSNL compounds under SDCA Batala). | 18-11-2010 15:00:00 |
18-11-2010 15:30:00 |
||
| APPLICATION Batala5866.pdf | ARMO to BSNL Buildings and staff Quarters in SSA Pathankot during the year 2010-11. (SH: Cleaning of terraces,water storage tanks & Jungle cutting in the BSNL compounds under SDCA Batala). | 18-11-2010 15:00:00 |
18-11-2010 15:30:00 |
||||
| 55/EE/BSNL/CD/JL/NIT/2010-11 dated 10/11/2010 | NIT555880.htm | TENDERDOCUMENT555880.doc | Construction of roof top tower base and erection of 15 M high MAAR Mast tower at JCT Chouhal (Hoshiarpur). | 18-11-2010 15:00:00 |
18-11-2010 15:30:00 |
||
| APPLICATION555881.doc | Construction of roof top tower base and erection of 15 M high MAAR Mast tower at JCT Chouhal (Hoshiarpur). | 18-11-2010 15:00:00 |
18-11-2010 15:30:00 |
||||
| 42/EE/BSNL/CD/ASR/2010-11 dated 06.11.2010 | CORRI5902.doc | Provision of New Tube Well at BSNL Compound Guru Ravi Das Marg, Amritsar | 18-11-2010 15:30:00 |
||||
| NIT5859.htm | Tender doc5859.pdf | Provision of New Tube Well at BSNL Compound Guru Ravi Das Marg, Amritsar | 16-11-2010 15:00:00 |
16-11-2010 15:30:00 |
|||
| Application5860.pdf | Provision of New Tube Well at BSNL Compound Guru Ravi Das Marg, Amritsar | 16-11-2010 15:00:00 |
16-11-2010 15:30:00 |
||||
| 47/EE/BSNL/CD/PTA/2010-11 dated : 03.11.2010. | BSNL-6nit475846.htm | 1011nit475846.pdf | A/R & M/O to T.E building at Rajpura.( S.H:- Maintaining of BSNL Civil Sub Division Rajpura from December 2010 to May 2011) | 15-11-2010 15:00:00 |
15-11-2010 15:30:00 |
||
| 46/EE/BSNL/CD/PTA/2010-11 dated 02.11.2010. | BSNL-6nit465844.htm | 1011nit465844.pdf | A/R & M/O to T.E building, Rajpura in SSA Patiala. | 12-11-2010 15:00:00 |
12-11-2010 15:30:00 |
||
| Q.No.12/EE/BSNL/CD/PTA/2010-11 Dated: 10.11.2010. | Q-125889.htm | Schedule of Quantity Q-125889.pdf | Provision of replacement of old Venetian blinds at the windows in the chamber of DGM(CFA) & D.G.M. (CM) at 4th floor in TE bldg. Leela Bhawan Patiala. | 12-11-2010 15:00:00 |
12-11-2010 15:30:00 |
||
| Q.No.13/EE/BSNL/CD/PTA/2010-11 Dated: 10.11.2010 | Q-135890.htm | Schedule of Quantity Q-135890.pdf | Provision of shifting of old aluminium partition in switch room in TE building at Nabha. | 12-11-2010 15:00:00 |
12-11-2010 15:30:00 |
||
| 45/EE/BSNL/CD/PTA/2010-11 dated : 23.10.2010. | BSNL-6nit455793.htm | 1011nit455793.pdf | Erection and Painting work of 40M TCS type tower (Based on GR/TWR-12/01) at Arey Mill Compound, Amloh Road, Mandi Gobindgarh in Patiala SSA. | 10-11-2010 15:00:00 |
10-11-2010 15:30:00 |
||
| 45/EE/BSNL/CD-II/CHD/CSD-PKL/2010-2011 dated: - 29.10.10 | w6 455828.htm | 45NIT10-115828.pdf | Repair & maintenance of cable chambers/cable duct chambers and sealing of pipes near TE sector-5, Panchkula. (Three number manholes only) | 10-11-2010 15:00:00 |
10-11-2010 15:30:00 |
||
| 46 / EE/BSNL/CD-II/Chd/csd/mhl/2010-11 dated : 01.11.2010 | NIT465835.htm | Misc civil works in Mohali5835.pdf | Miscellaneous civil works of BSNL buildings under the jurisdiction of BSNL civil sub division. S.A.S.Nagar (Mohali.) | 10-11-2010 15:00:00 |
10-11-2010 15:30:00 |
||
| 54/EE/BSNL/CD/JL/NIT/2010-11 dated 27/10/2010 | NIT545810.htm | TENDER-DOCUMENT545810.doc | Provision of Customer Shed for CSC in T.E. Compound at Goraya. | 08-11-2010 15:00:00 |
08-11-2010 15:30:00 |
||
| APPLICATION545811.doc | Provision of Customer Shed for CSC in T.E. Compound at Goraya. | 08-11-2010 15:00:00 |
08-11-2010 15:30:00 |
||||
| 53/2010-11/EE/BSNL/CD/LDH Dated 26-10-2010 | Corrigendum_NIT 535841.doc | Sealing of Cable entry points in Cable Duct Chambers from Telephone Exchange Jugiana to Pawa village (under area of DET Dholewal, Ludhiana) | 08-11-2010 15:30:00 |
||||
| 54/2010-11/EE/BSNL/CD/LDH Dated 26-10-2010 | Corrigendum_NIT 545842.doc | Development of portion back side of Inspection quarter and front side of front compound wall in BSNL Compound at Dugri. Ludhiana | 08-11-2010 15:30:00 |
||||
| 44-2/EE/BSNL/CD/PTA/2010-11 dated 30.10.2010. | 1011corrnit445833.htm | 1011corrnit44-25833.pdf | A/R & M/O to T.E building, Rajpura in SSA Patiala. | 05-11-2010 15:00:00 |
05-11-2010 15:30:00 |
||
| NIT No. 44 /EE/BSNL/CD-II/CHD/2010-11 Dated: 26-10-2010 | NIT445803.htm | 44NIT10-115803.pdf | Additions/Alterations in TE building Sector 53, S.A.S. Nagar (Mohali). | 04-11-2010 15:00:00 |
04-11-2010 15:30:00 |
||
| NIT No. : 43/EE/BSNL/CD-II//Chd/2010-2011 Dated: 25.10.2010 | 43NITA5795.htm | 43A5795.pdf | Provision of furniture items for DGM(IN) and DGM (finance) in the office of GM(CMTS) in RLU building phase-IV Mohali | 03-11-2010 15:00:00 |
03-11-2010 15:30:00 |
||
| 43B5796.pdf | Construction of Tower Foundation for 1 Nos. 40M NBLW type tower including erection work (Based on GR/TWR-04/01) at Gurudwara Dera Sahib Bakerpur,Mohali of Chandigarh SSA (SH : ERECTION WORK ). | 03-11-2010 15:00:00 |
03-11-2010 15:30:00 |
||||
| 53/2010-11/EE/BSNL/CD/LDH Dated 26-10-2010 | BSNL W-6 NIT 535806.htm | NIT 53-10115806.doc | Sealing of Cable entry points in Cable Duct Chambers from Telephone Exchange Jugiana to Pawa village (under area of DET Dholewal, Ludhiana) | 03-11-2010 15:00:00 |
03-11-2010 15:30:00 |
||
| 54/2010-11/EE/BSNL/CD/LDH Dated 26-10-2010 | BSNL W-6 NIT 545807.htm | NIT 54-10115807.doc | Development of portion back side of Inspection quarter and front side of front compound wall in BSNL Compound at Dugri. Ludhiana | 03-11-2010 15:00:00 |
03-11-2010 15:30:00 |
||
| 44/EE/BSNL/CD/PTA/2010-11 dated 30.10.2010 | 1011corrnit445834.htm | 1011corrnit44-25834.pdf | A/R & M/O to T.E building, Rajpura in SSA Patiala. | 02-11-2010 15:00:00 |
02-11-2010 15:30:00 |
||
| 44/EE/BSNL/CD/PTA/2010-11 dated : 21.10.2010. | BSNL-6nit445772.htm | 1011nit44-25772.pdf | A/R & M/O to SBS Hostel in RTTC at Rajpura. | 01-11-2010 15:00:00 |
01-11-2010 15:30:00 |
||
| 1011nit44-25773.pdf | A/R & M/O to T.E building, Rajpura in SSA Patiala. | 01-11-2010 15:00:00 |
01-11-2010 15:30:00 |
||||
| 53/EE/BSNL/CD/JL/NIT/2010-11 dated 22/10/2010 | NIT535775.htm | TENDERDOCUMENT535775.doc | Construction of foundation and erection of 5 Nos NBLW Type Towers in Jalandhar SSA (SH: Foundation at balance 4 Nos sites). | 01-11-2010 15:00:00 |
01-11-2010 15:30:00 |
||
| APPLICATION535776.doc | Construction of foundation and erection of 5 Nos NBLW Type Towers in Jalandhar SSA (SH: Foundation at balance 4 Nos sites). | 01-11-2010 15:00:00 |
01-11-2010 15:30:00 |
||||
| 40/EE/BSNL/CD/ASR/2010-11 dated 22.10.2010 | NIT Job5777.htm | Tender doc jobs5777.doc | A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2010-11 (SH : Maintenance & Operational jobs in O/o the EE (C) & SDE -I(C) Asr , PH-II. | 01-11-2010 15:00:00 |
01-11-2010 15:30:00 |
||
| APPLICATIONdoc job5778.doc | A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2010-11 (SH : Maintenance & Operational jobs in O/o the EE (C) & SDE -I(C) Asr , PH-II. | 01-11-2010 15:00:00 |
01-11-2010 15:30:00 |
||||
| 41/EE/BSNL/CD/ASR/2010-11 dated 22.10.2010 | NIT5780.htm | Tender doc5780.pdf | Provision of Tubewell in T.E Compound Albert Road,Amritsar” | 01-11-2010 15:00:00 |
01-11-2010 15:30:00 |
||
| Application5781.pdf | Provision of Tubewell in T.E Compound Albert Road,Amritsar” | 01-11-2010 15:00:00 |
01-11-2010 15:30:00 |
||||
| 42 / EE/BSNL/CD-II/Chd/csd/mhl/2010-11 dated : 20.10.2010 | w65762.htm | CSD_Rapairs5762.pdf | Petty civil works at CTSD (PB) Industrial area phase-VIII Mohali | 30-10-2010 15:00:00 |
30-10-2010 15:30:00 |
||
| 55/2010-11/EE/BSNL/CD/LDH Dated 26-10-2010 | BSNL W-6 NIT 555808.htm | NIT 55-10115808.doc | Provision of Modular Design to CMTS Exploitation room at 2nd Floor of T.E. building Bharat Nagar Ludhiana.(Providing and placing furniture for CMTS exploitation room ) | 30-10-2010 15:00:00 |
30-10-2010 15:30:00 |
||
| 39/EE/BSNL/CD/ASR/2010-11 dated 18.10.2010 | NIT5750.htm | Tender Day5750.doc | ARMO to BSNL Buildings and staff Quarters in SSA Pathankot during the year 2010-11.( SH: Miscellaneous Civil works in T.E. Building & Staff quarters Compound at Batala.) Phase-II | 28-10-2010 15:00:00 |
28-10-2010 15:30:00 |
||
| APPLICATION5751.doc | ARMO to BSNL Buildings and staff Quarters in SSA Pathankot during the year 2010-11.( SH: Miscellaneous Civil works in T.E. Building & Staff quarters Compound at Batala.) Phase-II | 28-10-2010 15:00:00 |
28-10-2010 15:30:00 |
||||
| 43/EE/BSNL/CD/PTA/2010-11 dated 16.10.2010 | BSNL-6 nit435738.htm | 1011nit435738.pdf | A/R & M/O to T.E. building at Patiala (SH: Maintaining of BSNL Civil Division, BSNL Civil Sub Division, Patiala from 01.11.2010 to 28.02.2011. | 27-10-2010 15:00:00 |
27-10-2010 15:30:00 |
||
| 50/EE/BSNL/CD/JL/NIT/2010-11 dated 18/10/2010 | NIT505744.htm | TENDERDOCUMENT505744.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under Hoshiarpur SSA. | 27-10-2010 15:00:00 |
27-10-2010 15:30:00 |
||
| APPLICATION505745.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under Hoshiarpur SSA. | 27-10-2010 15:00:00 |
27-10-2010 15:30:00 |
||||
| 51/EE/BSNL/CD/JL/NIT/2010-11 dated 18/10/2010 | NIT515746.htm | TENDERDOCUMENT515746.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under BSNL Civil Sub Division-II Jalandhar. | 27-10-2010 15:00:00 |
27-10-2010 15:30:00 |
||
| APPLICATION515747.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under BSNL Civil Sub Division-II Jalandhar. | 27-10-2010 15:00:00 |
27-10-2010 15:30:00 |
||||
| 52/EE/BSNL/CD/JL/NIT/2010-11 dated 18/10/2010 | NIT525748.htm | TENDERDOCUMENT525748.doc | Miscellaneous repairs and painting operations on change of occupancy in BSNL Staff Quarters under BSNL Civil Sub Division-II, Jalandhar. | 27-10-2010 15:00:00 |
27-10-2010 15:30:00 |
||
| APPLICATION525749.doc | Miscellaneous repairs and painting operations on change of occupancy in BSNL Staff Quarters under BSNL Civil Sub Division-II, Jalandhar. | 27-10-2010 15:00:00 |
27-10-2010 15:30:00 |
||||
| 52/2010-11/EE/BSNL/CD/LDH Dated 18-10-2010 | BSNL W-6 NIT 525753.htm | NIT 52-10115753.doc | Repair and Renovation of Multi-utility sports hall at the rear of Parking Area in Central University Bathinda | 27-10-2010 15:00:00 |
27-10-2010 15:30:00 |
||
| NIT No. 41 /EE/BSNL/CD-II/CHD/2010-11 Dated: 13-10-2010 | NIT 415725.htm | NIT41s535725.pdf | Additions/Alterations in TE building Sector 53,S.A.S. Nagar (Mohali). | 25-10-2010 15:00:00 |
25-10-2010 15:30:00 |
||
| NIT NO : 38/EE/BSNL/CD/ASR/2010-11 dated 15.10.2010 | NIT5729.htm | Tender document5729.doc | Provision of 03 Nos Ground Base Hoarding and Flex to existing Hoardings at different locations under Jurisdiction of BSNL Civil Sub Division Pathankot. | 25-10-2010 15:00:00 |
25-10-2010 15:30:00 |
||
| Blank application5730.doc | Provision of 03 Nos Ground Base Hoarding and Flex to existing Hoardings at different locations under Jurisdiction of BSNL Civil Sub Division Pathankot. | 25-10-2010 15:00:00 |
25-10-2010 15:30:00 |
||||
| 41/EE/BSNL/CD/PTA/2010-11 daded : 11.10.2010. | BSNL-6 nit415717.htm | 1011nit415717.pdf | Civil works in front of BSNL Compound Kaula Park at Sangrur. | 22-10-2010 15:00:00 |
22-10-2010 15:30:00 |
||
| Q-11/EE/BSNL/CD/PTA/2010-11 dated 19.10.2011 | Q-115756.htm | Schedule of Quantity Q-115756.pdf | A/R & M/O to TE building Leela Bhawan Patiala (SH: Cleaning of rain water harvesting tank and silting chambers along withalteration to MS covers in TE bldg Leela Bhawan Patiala | 21-10-2010 15:00:00 |
21-10-2010 15:30:00 |
||
| 42/EE/BSNL/CD/PTA/2010-11 dated 12.10.2010. | BSNL-6 nit425722.htm | 1011NIT425722.pdf | Provision of 100mm dia PVC pipe in bore for disposal of water from Cable duct manhole near main gate of T.E. building & GPO compound at Leela Bhawan Patiala. | 20-10-2010 15:00:00 |
20-10-2010 15:30:00 |
||
| 51/2010-11/EE/BSNL/CD/LDH Dated 16-10-2010 | BSNL W-6 NIT 515732.htm | NIT 51-10115732.doc | A/R & M/O to re-allotted quarters in Sanchar Colony, BRS Nagar, Ludhiana | 20-10-2010 15:00:00 |
20-10-2010 15:30:00 |
||
| 35/EE/BSNL/CD/ASR/2010-11 dated 06.10.2010 | NIT5684.htm | Tender document5684.pdf | Provision of Antistatic flooring in Transmission room/Switch room at Sri Hargobindpur. | 18-10-2010 15:00:00 |
18-10-2010 15:30:00 |
||
| Application5685.pdf | Provision of Antistatic flooring in Transmission room/Switch room at Sri Hargobindpur | 18-10-2010 15:00:00 |
18-10-2010 15:30:00 |
||||
| 36/EE/BSNL/CD/ASR/2010-11 dated 06.10.2010 | NIT5688.htm | Tender document5688.pdf | Horticulture works and Upkeeping of Lawns / Plants in T.E. Building Compound Pathankot and Gurdaspur during the year 2010-11.(October 2010 to March 2011.) | 18-10-2010 15:00:00 |
18-10-2010 15:30:00 |
||
| Application5689.pdf | Horticulture works and Upkeeping of Lawns / Plants in T.E. Building Compound Pathankot and Gurdaspur during the year 2010-11.(October 2010 to March 2011.) | 18-10-2010 15:00:00 |
18-10-2010 15:30:00 |
||||
| 37/EE/BSNL/CD/ASR/2010-11 dated 06.10.2010 | NIT5691.htm | Tender document5691.pdf | Maintenance & Operational Jobs in O/o the SDE(C), Pathankot during the year 2010-11.(October 2010 to March 2011.) | 18-10-2010 15:00:00 |
18-10-2010 15:30:00 |
||
| Application5692.pdf | Maintenance & Operational Jobs in O/o the SDE(C), Pathankot during the year 2010-11.(October 2010 to March 2011.) | 18-10-2010 15:00:00 |
18-10-2010 15:30:00 |
||||
| 50/2010-11/EE/BSNL/CD/LDH Dated 13-10-2010 | BSNL W-6 NIT 505726.htm | NIT 50-10115726.doc | A/R & M/O to BSNL Buildings in Ludhiana SSA for the year 2010-11 (SH: Provision of Miscellaneous Civil Works in Inspection Quarter, Dugri) | 18-10-2010 15:00:00 |
18-10-2010 15:30:00 |
||
| 23/2010-11/EE/BSNL/CD-I/CHD dated 8-10-2010 | 23NIT105706.htm | 23NIT105706.pdf | Maintenance of horticulture woks in the compound of TE Building, Sector-37, Chandigarh for the period 2010-11 | 16-10-2010 15:00:00 |
16-10-2010 15:30:00 |
||
| 23NIT10(i)5707.pdf | Maintenance of horticulture woks in the compound of TE Building, Sector-49, Chandigarh for the period 2010-11 | 16-10-2010 15:00:00 |
16-10-2010 15:30:00 |
||||
| 23NIT10(ii)5708.pdf | Maintenance of horticulture woks in TE Building, Manimajra, Chandigarh for the period 2010-11 | 16-10-2010 15:00:00 |
16-10-2010 15:30:00 |
||||
| 49/2010-11/EE/BSNL/CD/LDH Dated 07-10-2010 | BSNL W-6 NIT 495694.htm | NIT 49-10115694.doc | Sealing of Cable entry points in Cable Duct Chambers from Telephone Exchange Jugiana to Pawa village (under area of DET Dholewal, Ludhiana) | 15-10-2010 15:00:00 |
15-10-2010 15:30:00 |
||
| 40/EE/BSNL/CD-II/Chd/2010-2011 Dated: 07.10. 2010 | 40nit5699.htm | 40nit10-11a5699.pdf | Post Constructional anti-termite treatment to the Type-VI staff quarter at GZS Nagar, Ropar. | 15-10-2010 15:00:00 |
15-10-2010 15:30:00 |
||
| 40nit10-11b5700.pdf | A/R & M/O to staff quarters in Co-axial building compound at Naya Nangal. | 15-10-2010 15:00:00 |
15-10-2010 15:30:00 |
||||
| 49/2010-11/EE/BSNL/CD/LDH Dated 07-10-2010 | Corrigendum_NIT 495712.doc | Sealing of Cable entry points in Cable Duct Chambers from Telephone Exchange Jugiana to Pawa village (under area of DET Dholewal, Ludhiana) | 15-10-2010 15:30:00 |
||||
| Q-9/EE/BSNL/CD/PTA/2010-11 dated : 11.10.2010 | Q-95715.htm | Schedule of Quantity Q-95715.pdf | Construction of tower foundations for 11 Nos. TCS type towers including erection works (Based on GR/TWR-12/01) in Patiala SSA (SH: Laying dry brick pitching around tower at Jhungian) (3rd Call) | 14-10-2010 15:00:00 |
14-10-2010 15:30:00 |
||
| Q-10/EE/BSNL/CD/PTA/2010-11 dated : 11.10.2010 | Q-105716.htm | Schedule of Quantity Q-105716.pdf | Provision of window grills & glass panes in AC openings in TRA section Chhoti Baradari Patiala | 14-10-2010 15:00:00 |
14-10-2010 15:30:00 |
||
| 48/EE/BSNL/CD/JL/NIT/2010-11 dated 04/10/2010 | NIT485672.htm | TENDERDOCUMENT485672.doc | Provision of Drawer in the Kitchen of Quarter No-D1,JP Nagar Jalandhar. | 12-10-2010 15:00:00 |
12-10-2010 15:30:00 |
||
| APPLICATION485673.doc | Provision of Drawer in the Kitchen of Quarter No-D1,JP Nagar Jalandhar. ” | 12-10-2010 15:00:00 |
12-10-2010 15:30:00 |
||||
| 49/EE/BSNL/CD/JL/NIT/2010-11 dated 04/10/2010 | NIT495674.htm | TENDERDOCUMENT495674.doc | Shifting of water cooler at ground floor in CTO complex, Jalandhar. | 12-10-2010 15:00:00 |
12-10-2010 15:30:00 |
||
| APPLICATION495675.doc | Shifting of water cooler at ground floor in CTO complex, Jalandhar. | 12-10-2010 15:00:00 |
12-10-2010 15:30:00 |
||||
| 34/EE/BSNL/CD/ASR/2010-11dated 01.10.2010 | NIT5661.htm | Tender doc5661.doc | Provision of floor tile in the O/o D.E(vigilance), Pathankot | 11-10-2010 15:00:00 |
11-10-2010 15:30:00 |
||
| APPLICATION5662.doc | Provision of floor tile in the O/o D.E(vigilance), Pathankot | 11-10-2010 15:00:00 |
11-10-2010 15:30:00 |
||||
| 47/EE/BSNL/CD/JL/NIT/2010-11 dated 28/09/2010 | NIT475634.htm | TENDERDOCUMENT475634.doc | Hiring of vehicle for O/o Executive Engineer(C), BSNL Civil Division, Jalandhar. | 08-10-2010 15:00:00 |
08-10-2010 15:30:00 |
||
| Application475635.doc | Hiring of vehicle for O/o Executive Engineer(C), BSNL Civil Division, Jalandhar. | 08-10-2010 15:00:00 |
08-10-2010 15:30:00 |
||||
| 18/2010-11/EE/BSNL/CD/FZR | NIT185638.html | Tender document185638.doc | Making platform for overhead tank in SSA Store at Ferozepur Cantt-2nd call | 07-10-2010 15:00:00 |
07-10-2010 15:30:00 |
||
| 22/2010-11/EE/BSNL/CD-I/CHD/ dated 29-9-2010 | 22NIT105639.htm | 22NIT105639.pdf | Renovation of damaged cupboards in inspection Quarter, Sector 44A, Chandigarh | 07-10-2010 15:00:00 |
07-10-2010 15:30:00 |
||
| 21/2010-11/EE/BSNL/CD-I/CHD dated 28-9-2010 | 21NIT105636.htm | 21NIT105636.pdf | C/o New Boundary wall in IMTECH, Sector-39A, Chandigarh (SH:Provision of M.S. Sliding Entrance Gates) | 06-10-2010 15:00:00 |
06-10-2010 15:30:00 |
||
| 46/EE/BSNL/CD/JL/NIT/2010-11 dated 23/09/2010 | NIT465606.htm | TENDERDOCUMENT465606.doc | Provision of PVC water storage tanks of 500 litres capacity in lieu of damaged RCC water tanks in P&T colony, Shashtri Market,Jalandhar (2nd Call). | 05-10-2010 15:00:00 |
05-10-2010 15:30:00 |
||
| APPLICATION465607.doc | Provision of PVC water storage tanks of 500 litres capacity in lieu of damaged RCC water tanks in P&T colony, Shashtri Market,Jalandhar (2nd Call). | 05-10-2010 15:00:00 |
05-10-2010 15:30:00 |
||||
| 37/EE/BSNL/CD/PTA/2010-11 DATED : 23.09.2010 | BSNL-6nit375608.htm | 1011nit375608.pdf | Rate contract for Day to day maintenance of all T.E buildings and Staff Quarters under jurisdiction of BSNL Civil Sub-Division, Rajpura (Except RTTC), Distt. Patiala. | 05-10-2010 15:00:00 |
05-10-2010 15:30:00 |
||
| 38/EE/BSNL/CD/PTA/2010-11 dated 23.09.2010 | BSNL-6nit385609.htm | 1011nit385609.pdf | A/R & M/O to BSNL staff quarters (Internal Portion) in SBS colony at Rajpura in SSA Patiala. | 05-10-2010 15:00:00 |
05-10-2010 15:30:00 |
||
| 39/EE/BSNL/CD/PTA/2010-11 dated : 23.09.2010 | BSNL-6nit395610.htm | 1011nit395610.pdf | Construction of tower foundation for 40M TCS type tower (Based on GR/TWR-12/01)at Arey Mill Compounds, Amloh road, Mandi Gobindgarh in Patiala SSA. | 05-10-2010 15:00:00 |
05-10-2010 15:30:00 |
||
| 40/EE/BSNL/CD/PTA/2010-11 dated : 23.09.2010 | BSNL-6nit405611.htm | 1011NIT405611.pdf | Day To Day Maintenance of BSNL Buildings in the jurisdiction of DET MGG, DET Nabha, DET Samana, DET Fatehgarh Sahib/ Sirhind under Patiala SSA. | 05-10-2010 15:00:00 |
05-10-2010 15:30:00 |
||
| 46/2010-11/EE/BSNL/CD/LDH/ Dated: 25-09-2010 | BSNL W-6 NIT 465619.htm | NIT 46-10115619.doc | Provision of Tube Well in TE Building Compound at Kohara (RE-CALL) | 04-10-2010 15:00:00 |
04-10-2010 15:30:00 |
||
| 47/2010-11/EE/BSNL/CD/LDH Dated: 25-09-2010 | BSNL W-6 NIT 475620.htm | NIT 47-10115620.doc | A/R & M/O to BSNL Buildings & Staff Quarters in Bathinda SSA during the year 2010-11. (SH: Painting and minor repair on new occupancy) (RE-CALL) | 04-10-2010 15:00:00 |
04-10-2010 15:30:00 |
||
| BSNL W-6 NIT 475621.htm | NIT 47-10115621.doc | A/R & M/O to BSNL Buildings & Staff Quarters in Bathinda SSA during the year 2010-11. (SH: Painting and minor repair on new occupancy) (RE-CALL) | 04-10-2010 15:00:00 |
04-10-2010 15:30:00 |
|||
| BSNL W-6 NIT 475622.htm | NIT 47-10115622.doc | A/R & M/O to BSNL Buildings & Staff Quarters in Bathinda SSA during the year 2010-11. (SH: Painting and minor repair on new occupancy) (RE-CALL) | 04-10-2010 15:00:00 |
04-10-2010 15:30:00 |
|||
| BSNL W-6 NIT 475623.htm | NIT 47-10115623.doc | A/R & M/O to BSNL Buildings & Staff Quarters in Bathinda SSA during the year 2010-11. (SH: Painting and minor repair on new occupancy) (RE-CALL) | 04-10-2010 15:00:00 |
04-10-2010 15:30:00 |
|||
| BSNL W-6 NIT 475624.htm | NIT 47-10115624.doc | A/R & M/O to BSNL Buildings & Staff Quarters in Bathinda SSA during the year 2010-11. (SH: Painting and minor repair on new occupancy) (RE-CALL) | 04-10-2010 15:00:00 |
04-10-2010 15:30:00 |
|||
| 48/2010-11/EE/BSNL/CD/LDH Dated: 25-09-2010 | BSNL W-6 NIT 485625.htm | NIT 48-10115625.doc | Closing of window for new equipment to prevent sun heat & other Miscellaneous civil work in room No 111 in tax Building Bathinda (RE-CALL) | 04-10-2010 15:00:00 |
04-10-2010 15:30:00 |
||
| 33/EE/BSNL/CD/ASR/2010-11 dated 22.09.2010 | NIT5600.htm | Tender Chogawan5600.doc | Repair to the effected houses due to fallen of 30 metre Microwave tower at Chogawan , Amritsar | 01-10-2010 15:00:00 |
01-10-2010 15:30:00 |
||
| Application5601.doc | Repair to the effected houses due to fallen of 30 metre Microwave tower at Chogawan , Amritsar | 01-10-2010 15:00:00 |
01-10-2010 15:30:00 |
||||
| NIT No. : 38/EE/BSNL/CD-II/Chd/2010-11 Dated : 22-09-2010. | W65602.htm | 38nit10-115602.pdf | Construction of tower foundations for 40M NBLW tower (Based on GR/TWR-04/01) at Gurudwara Dera Sahib, Bakerpur, Mohali , in Chandigarh SSA | 01-10-2010 15:00:00 |
01-10-2010 15:30:00 |
||
| 39/ EE/BSNL/CD-II/Chd/csd/mhl/2010-11 Dated : 22.9.2010. | W65604.htm | 38nit10-115604.pdf | Renovation of Toilet in Micro wave Building 1st floor sector 53 Mohali | 01-10-2010 15:00:00 |
01-10-2010 15:30:00 |
||
| NIT no: 39/ EE/BSNL/CD-II/Chd/csd/mhl/2010-11 Dated : 22.9.2010 | 395605.htm | MW-Toilet5605.pdf | Renovation of Toilet in Micro wave Building 1st floor sector 53 S.A.S.NAgar( Mohali) | 01-10-2010 15:00:00 |
01-10-2010 15:30:00 |
||
| 43/EE/BSNL/CD/JL/NIT/2010-11 dated 16/09/2010 | NIT435567.htm | TENDERDOCUMENT435567.doc | Annual Maintenance of Ground Based & Roof Top Towers in Jalandhar SSA, under BSNL Civil Sub-Division-I,Jalandhar. | 30-09-2010 15:00:00 |
30-09-2010 15:30:00 |
||
| APPLICATION435568.doc | Annual Maintenance of Ground Based & Roof Top Towers in Jalandhar SSA, under BSNL Civil Sub-Division-I,Jalandhar. | 30-09-2010 15:00:00 |
30-09-2010 15:30:00 |
||||
| 44/EE/BSNL/CD/JL/NIT/2010-11 dated 16/09/2010 | NIT445569.htm | TENDERDOCUMENT445569.doc | Annual Maintenance of Ground Based & Roof Top Towers in Jalandhar SSA, under BSNL Civil Sub-Division-II,Jalandhar. | 30-09-2010 15:00:00 |
30-09-2010 15:30:00 |
||
| APPLICATION445570.doc | Annual Maintenance of Ground Based & Roof Top Towers in Jalandhar SSA, under BSNL Civil Sub-Division-II,Jalandhar. | 30-09-2010 15:00:00 |
30-09-2010 15:30:00 |
||||
| 45/BSNL/CD/JL/NIT/2010-11 dated 17/09/2010 | NIT455578.htm | TENDERDOCUMENT455578.doc | Raising of necks of Cable Duct manholes and handholes at Garshshankar. | 28-09-2010 15:00:00 |
28-09-2010 15:30:00 |
||
| APPLICATION455579.doc | Raising of necks of Cable Duct manholes and handholes at Garshshankar. | 28-09-2010 15:00:00 |
28-09-2010 15:30:00 |
||||
| 18/2010-11/EE/BSNL/CD-I/CHD dated 20-9-2010 | 18NIT5589.htm | 18NIT105589.pdf | C/o New Boundary wall in IMTECH, Sector-39A, Chandigarh (SH: Provision ofM.S, Sliding Entrance Gates) | 28-09-2010 15:00:00 |
28-09-2010 15:30:00 |
||
| 19/2010-11/EE/BSNL/CD-I/CHD dated 20-9-2010 | 19NIT5591.htm | 19NIT105591.pdf | Development and Maintenance of horticulture works in the compound of Telephone Exchange Building, Sector-34,Chandigarh. | 28-09-2010 15:00:00 |
28-09-2010 15:30:00 |
||
| 20/2010-11/EE/BSNL/CD-I/CHD dated 20-9-2010 | 20NIT5592.htm | 20NIT105592.pdf | Tender for providing and supplying Computer System and peripherals. | 28-09-2010 15:00:00 |
28-09-2010 15:30:00 |
||
| 35/EE/BSNL/CD/PTA/2010-11 Dated 15.09.2010 | BSNL-6nit355561.htm | 1011nit355561.pdf | Provision of additional chairs for conference hall at Ist floor in Administrative and Academic Block in RTTC at Rajpura. | 27-09-2010 15:00:00 |
27-09-2010 15:30:00 |
||
| NIT No.:37/EE/BSNL/CD-II/Chd/2010-2011 Dated: 18-9-2010. | 37nit10-115583.htm | 37nit10-11a5583.pdf | P/o PVC water storage tanks and reconstruction of damaged boundary wall at Singh Bhagwantpur TE Building under SSA Ropar. | 27-09-2010 15:00:00 |
27-09-2010 15:30:00 |
||
| 37nit10-11b5584.pdf | P/o working platform and glazed tiles in kitchens of P&T colony TRA complex at Roopnagar. | 27-09-2010 15:00:00 |
27-09-2010 15:30:00 |
||||
| 37nit10-11c5585.pdf | Provision of RCC Poles and barbed wire fencing and front compound wall and gate at BSNL Plot Morinda.(IIIrd call) | 27-09-2010 15:00:00 |
27-09-2010 15:30:00 |
||||
| 17/2010-11/EE/BSNL/CD/FZR | NIT175586.html | Tender document175586.doc | Making platform for overhead tank in SSA store at Ferozepur Cantt. | 27-09-2010 15:00:00 |
27-09-2010 15:30:00 |
||
| 36/EE/BSNL/CD/PTA/2010-11 dated 18.09.2010 | BSNL-6 nit365587.htm | 1011nit365587.pdf | Construction of tower foundation for 40M NBLW type tower (Based on GR/TWR-04/01) at Bhootgarh in Patiala SSA. | 27-09-2010 15:00:00 |
27-09-2010 15:30:00 |
||
| 44/2010-11/EE/BSNL/CD/LDH Dated 17-09-2010 | BSNL W-6 NIT 445573.htm | NIT 44-10115573.doc | A/R & M/O to BSNL Buildings & Staff Quarters in Bathinda SSA during the year 2010-11. (SH: Painting and minor repair on new occupancy). | 24-09-2010 15:00:00 |
24-09-2010 15:30:00 |
||
| 45/2010-11/EE/BSNL/CD/LDH Dated 17-09-2010 | BSNL W-6 NIT 455574.htm | NIT 45-10115574.doc | Closing of window for new equipment to prevent sun heat & other Miscellaneous civil work in room No 111 in tax Building Bathinda. | 24-09-2010 15:00:00 |
24-09-2010 15:30:00 |
||
| 43/2010-11/EE/BSNL/CD/LDH Dated 14-09-2010 | BSNL W-6 NIT 435553.htm | NIT 43-10115553.doc | Provision of Tube Well in TE Building Compound at Kohara (Re-Call) | 22-09-2010 15:00:00 |
22-09-2010 15:30:00 |
||
| 34/EE/BSNL/CD/PTA/2010-11 Dated 09.09.2010 (2nd Call) | BSNL-6nit345537.htm | 1011nit345537.pdf | Construction of room for E/A at rented BTS site at village Kuranwala in SDCA Zirakpur. | 21-09-2010 15:00:00 |
21-09-2010 15:30:00 |
||
| 39/EE/BSNL/CD/JL/NIT/2010-11 dated 13/09/2010 | NIT395543.htm | TENDERDOCUMENT395543.doc | 1.0 Miscellaneous repairs and painting works on change of occupancy in Quarter No.D4,JP Nagar Jalandhar. | 21-09-2010 15:00:00 |
21-09-2010 15:30:00 |
||
| APPLICATION395544.doc | 1.0 Miscellaneous repairs and painting works on change of occupancy in Quarter No.D4,JP Nagar Jalandhar. | 21-09-2010 15:00:00 |
21-09-2010 15:30:00 |
||||
| EE/BSNL/CD/JL/NIT/2010-11 dated 13/09/2010 | NIT405546.htm | TENDERDOCUMENT405546.doc | Provision of Cupboard in Quarter No.D2,JP Nagar Jalandhar (2nd Call). | 21-09-2010 15:00:00 |
21-09-2010 15:30:00 |
||
| APPLICATION405547.doc | Provision of Cupboard in Quarter No.D2,JP Nagar Jalandhar (2nd Call). | 21-09-2010 15:00:00 |
21-09-2010 15:30:00 |
||||
| 41/EE/BSNL/CD/JL/NIT/2010-11 dated 13/09/2010 | NIT415548.htm | TENDERDOCUMENT415548.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under BSNL Civil Sub Division-I, Jalandhar. | 21-09-2010 15:00:00 |
21-09-2010 15:30:00 |
||
| APPLICATION415549.doc | Day to day petty repairs and maintenance operations in BSNL Buildings under BSNL Civil Sub Division-I, Jalandhar. | 21-09-2010 15:00:00 |
21-09-2010 15:30:00 |
||||
| 42/EE/BSNL/CD/JL/NIT/2010-11 dated 13/09/2010 | NIT425550.htm | TENDERDOCUMENT425550.doc | Miscellaneous repairs and painting works on change of occupancy in BSNL Staff Quarters under Hoshiarpur SSA. | 21-09-2010 15:00:00 |
21-09-2010 15:30:00 |
||
| APPLICATION425551.doc | Miscellaneous repairs and painting works on change of occupancy in BSNL Staff Quarters under Hoshiarpur SSA. | 21-09-2010 15:00:00 |
21-09-2010 15:30:00 |
||||
| 38/EE/BSNL/CD/JL/NIT/2010-11 dated 03/09/2010 | NIT385488.htm | TENDERDOCUMENT385488.doc | Provision of PVC water storage tanks of 500 litres capacity in lieu of damaged RCC water tanks in P&T colony, Shashtri Market,Jalandhar (Recall). | 20-09-2010 15:00:00 |
20-09-2010 15:30:00 |
||
| APPLICATION385489.doc | Provision of PVC water storage tanks of 500 litres capacity in lieu of damaged RCC water tanks in P&T colony, Shashtri Market,Jalandhar (Recall). | 20-09-2010 15:00:00 |
20-09-2010 15:30:00 |
||||
| 36/BSNL/CD/JL/NIT/JL/2010-11 | APPLICATION365479.doc | Tower maintenance of 2 Nos Microwave towers in MTS Nagar Telephone Exchange compound at Jalandhar (2nd Call). | 18-09-2010 15:00:00 |
18-09-2010 15:30:00 |
|||
| NIT365478.htm | TENDERDOCUMENT365478.doc | Tower maintenance of 2 Nos Microwave towers in MTS Nagar Telephone Exchange compound at Jalandhar (2nd Call). | 18-09-2010 15:00:00 |
18-09-2010 15:30:00 |
|||
| 33/EE/BSNL/CD/PTA/2010-11 Dated 07.09.2010 | BSNL6-nit335524.htm | 1011nit335524.pdf | Construction of tower foundation for 40M NBLW type tower (Based on GR/TWR-04/01) at Bhootgarh in Patiala SSA. | 18-09-2010 15:00:00 |
18-09-2010 15:30:00 |
||
| 33/EE/BSNL/CD/ASR/2010-11 dated:-08.09.2010 | NIT final5535.htm | Comp_Tender_Asr5535.doc | Procurement of Desktop Computer Systems and peripherals including Printer ” | 18-09-2010 15:00:00 |
18-09-2010 15:30:00 |
||
| Q-7/EE/BSNL/CD/PTA/10-11 dated 15.09.2010 | Q75571.htm | Schedule of Quantity Q75571.pdf | Post Constructional Anti termite Treatment of Wood Work in Qtr No. Type-V-1 staff quarter in P&T colony 22 no. Phatak, Patiala | 18-09-2010 15:00:00 |
18-09-2010 15:30:00 |
||
| Q-8/EE/BSNL/CD/PTA/10-11 dated 15.09.2010 | Q-85572.htm | Schedule of Quantity Q-85572.pdf | Construction of tower foundations for 11 Nos. TCS type towers including erection works (Based on GR/TWR-12/01) in Patiala SSA(SH: Laying dry brick pitching around tower at Jhungian) | 18-09-2010 15:00:00 |
18-09-2010 15:30:00 |
||
| 31/EE/BSNL/CD/ASR/2010-11 dated 07.09.2010 | NIT5525.htm | TENDER5525.doc | Provision of Partition in the office of GMT at Ist Floor of Telephone Bhawan Ranjit Avenue Amritsar | 17-09-2010 15:00:00 |
17-09-2010 15:30:00 |
||
| APPLICATION5526.doc | Provision of Partition in the office of GMT at Ist Floor of Telephone Bhawan Ranjit Avenue Amritsar | 17-09-2010 15:00:00 |
17-09-2010 15:30:00 |
||||
| 32/EE/BSNL/CD/ASR/2010-11 dated 07.09.2010 | NIT5527.htm | AC Sheet5527.doc | Replacement of old damaged A.C sheet roofing of shed at Focal Point Pathankot (2nd Call)” | 17-09-2010 15:00:00 |
17-09-2010 15:30:00 |
||
| APPLICATION5528.doc | Replacement of old damaged A.C sheet roofing of shed at Focal Point Pathankot (2nd Call)” | 17-09-2010 15:00:00 |
17-09-2010 15:30:00 |
||||
| 37/EE/BSNL/CD/JL/NIT/2010-11 dated 03/09/2010 | NIT375486.htm | TENDERDOCUMENT375486.doc | Repair and cleaning of underground and over head water storage tanks in BSNL Buildings under BSNL Civil Sub Division-I, Jalandhar. | 15-09-2010 15:00:00 |
15-09-2010 15:30:00 |
||
| APPLICATION375487.doc | Repair and cleaning of underground and over head water storage tanks in BSNL Buildings under BSNL Civil Sub Division-I, Jalandhar. | 15-09-2010 15:00:00 |
15-09-2010 15:30:00 |
||||
| 36/EE/BSNL/CD-II/CHD/CSD-PKL/2010-2011 Dated: - 06.09.2010 | 36nit10-115514.htm | 36nit10-115514.pdf | Construction of telephone exchange cum admn building at Sector-20, Panchkula. (SH: Provision of ramps in porch and koba treatment above lift well, provision of partitions for O/o SDE(E) & JTO(E), BSNL | 10-09-2010 16:00:00 |
15-09-2010 15:30:00 |
||
| 42/2010-11/EE/BSNL/CD/LDH Dated 08-09-2010 | BSNL W-6 NIT 425530.htm | NIT 42-10115530.doc | Provision of vitrified floor tiles in dinning hall and other miscellaneous civil works in Inspection Quarter in Dugri, Ludhiana | 15-09-2010 15:00:00 |
15-09-2010 15:30:00 |
||
| 28/EE/BSNL/CD/ASR/2010-11 dated 30.08.2010 | NIT5432.htm | Tender Doc5432.doc | ARMO to BSNL building and Staff Quarters at old trunk Exchange Compound Amritsar during the year 2010-11 | 13-09-2010 15:00:00 |
13-09-2010 15:30:00 |
||
| APPLICATION5433.doc | ARMO to BSNL building and Staff Quarters at old trunk Exchange Compound Amritsar during the year 2010-11 | 13-09-2010 15:00:00 |
13-09-2010 15:30:00 |
||||
| 33/EE/BSNL/CD/JL/NIT/2010-11 dated 31/08/2010 | NIT335451.htm | TENDERDOCUMENT335451.doc | Caretaking/Housekeeping of Inspection Quarter in CTO Compound, Jalandhar.” | 13-09-2010 15:00:00 |
13-09-2010 15:30:00 |
||
| APPLICATION335452.doc | Caretaking/Housekeeping of Inspection Quarter in CTO Compound, Jalandhar.” | 13-09-2010 15:00:00 |
13-09-2010 15:30:00 |
||||
| 34/EE/BSNL/CD/JL/NIT/2010-11 dated 31/08/2010 | NIT345455.htm | TENDERDOCUMENT345455.doc | Addition & alteration in Inspection Quarter (Lal Kothi) in Sanchar Colony,Hoshiarpur (2nd Call). | 13-09-2010 15:00:00 |
13-09-2010 15:30:00 |
||
| APPLICATION345456.doc | Addition & alteration in Inspection Quarter (Lal Kothi) in Sanchar Colony,Hoshiarpur (2nd Call). | 13-09-2010 15:00:00 |
13-09-2010 15:30:00 |
||||
| 32/EE/BSNL/CD/PTA/2010-11 dated 03.09.2010 | BSNL-6 nit325485.htm | 1011nit325485.pdf | A/R & M/O to BSNL staff quarters (Internal Portion) in BSNL colony at SST Nagar Patiala. | 13-09-2010 15:00:00 |
13-09-2010 15:30:00 |
||
| 31/EE/BSNL/CD/JL/NIT/2010-11 dated 31.08.2010 | NIT315443.htm | TENDERDOCUMENT315443.doc | Dismantling of existing tower at Sugar Mill Mukerian and Construction and erection of tower at Chak Ala Baksh (SH:Dismantling and Erection) (Recall). | 10-09-2010 15:00:00 |
10-09-2010 15:30:00 |
||
| APPLICATION315444.doc | Dismantling of existing tower at Sugar Mill Mukerian and Construction and erection of tower at Chak Ala Baksh (SH:Dismantling and Erection) (Recall). | 10-09-2010 15:00:00 |
10-09-2010 15:30:00 |
||||
| 31/EE/BSNL/CD/JL/NIT/2010-11 | NIT315442.htm | TENDERDOCUMENT315442.doc | Dismantling of existing tower at Oswal Sugar Mill Mukerian and Construction & erection of tower at Chak Ala Baksh (SH:Dismantling and Erection) (Recall). | 10-09-2010 15:00:00 |
10-09-2010 15:30:00 |
||
| NIT No. : 35/EE/BSNL/CD-II/Chd/csd/mhl/2010-11 Dated : 02.9.2010 | NIT355480.htm | LaknaurNIT5480.pdf | Provision of Antistatic flooring at new rented TE site at BSF complex Lakhnaur | 10-09-2010 15:00:00 |
10-09-2010 15:30:00 |
||
| Sunny_NIT5481.pdf | Provision of Antistatic flooring at new rented TE site at sunny enclave Kharar | 10-09-2010 15:00:00 |
10-09-2010 15:30:00 |
||||
| 32/EE/BSNL/CD/JL/NIT/2010-11 dated 31/08/2010 | NIT325446.htm | TENDERDOCUMENT325446.doc | Reconstruction of damaged portion of boundary wall in T.E.Compound at Shahkot. | 10-09-2010 15:00:00 |
10-09-2010 15:30:00 |
||
| APPLICATION325447.doc | Reconstruction of damaged portion of boundary wall in T.E. Compound at Shahkot. | 10-09-2010 15:00:00 |
10-09-2010 15:30:00 |
||||
| 35/EE/BSNL/CD/JL/NIT/2010-11 dated 31/08/2010 | NIT355459.htm | TENDERDOCUMENT355459.doc | Miscellaneous Civil works in BSNL Compound at Phagwara. | 10-09-2010 15:00:00 |
10-09-2010 15:30:00 |
||
| APPLICATION355460.doc | Miscellaneous Civil works in BSNL Compound at Phagwara. | 10-09-2010 15:00:00 |
10-09-2010 15:30:00 |
||||
| 41/2010-11/EE/BSNL/CD/LDH Dated 06-09-2010 | BSNL W-6 NIT 415506.htm | NIT 41-10115506.doc | Repair of Fibre Glass Sheet roofing in front of billing section, GMT Office, Bharat Nagar, Ludhiana | 10-09-2010 15:00:00 |
10-09-2010 15:30:00 |
||
| 29/EE/BSNL/CD/ASR/2010-11 dated 01.09.2010 | NIT cup5464.htm | Tender doc Cup5464.doc | Repairs to floors and cupboards to T-VI quarter at old trunk exchange Amritsar | 09-09-2010 15:00:00 |
09-09-2010 15:30:00 |
||
| 16/2010-11/EE/BSNL/CD/FZR | NIT165463.html | 16eefrz5463.doc | A/R & M/O to 2 Nos. Type-V, 10 Nos. T-IV, 10 Nos. T-III & 7 Nos. T-II New multi-storeyed staff quarters at P&T colony at Ferozepur Cantt during 2010-11 | 09-09-2010 15:00:00 |
09-09-2010 15:30:00 |
||
| 29/EE/BSNL/CD/ASR/2010-11 dated 01.09.2010 | APPLICATION cup5465.doc | Repairs to floors and cupboards to T-VI quarter at old trunk exchange Amritsar | 09-09-2010 15:00:00 |
09-09-2010 15:30:00 |
|||
| 30/EE/BSNL/CD/ASR/2010-11 dated 01.09.2010 | NIT Repair Cable5466.htm | Tender doc Repair cable5466.doc | Repairs to cable duct near Petrol Pump Batala road Amritsar | 09-09-2010 15:00:00 |
09-09-2010 15:30:00 |
||
| APPLICATION repair5467.doc | Repairs to cable duct near Petrol Pump Batala road Amritsar | 09-09-2010 15:00:00 |
09-09-2010 15:30:00 |
||||
| 29/EE/BSNL/CD/ASR/2010-11 dated 01.09.2010 | Corrigendum5483.doc | Repairs to floors and cupboards to T-VI quarter at old trunk exchange Amritsar | 09-09-2010 15:30:00 |
||||
| 36/2010-11/EE/BSNL/CD/LDH Dated: 31-08-2010 | Corrigendum_NIT 365471.doc | Raising & Leveling of OAN Manholes and Provision for shifting of One No OAN Manhole in Bathinda City | 08-09-2010 15:30:00 |
||||
| 37/2010-11/EE/BSNL/CD/LDH Dated: 31-08-2010 | Corrigendum_NIT 375472.doc | Raising & Leveling of Cable Duct Manhole Necks in Bathinda City | 08-09-2010 15:30:00 |
||||
| NIT NO:30/EE/BSNL/CD/JL/NIT/2010-11 dated 30.08.2010 | NIT305428.htm | TENDERDOCUMENT305428.doc | Miscellaneous repairs and painting works on change of occupancy in Type-VI Quarter in BSNL Officer Colony at Hoshiarpur (Recall). | 08-09-2010 15:00:00 |
08-09-2010 15:30:00 |
||
| 30/EE/BSNL/CD/JL/NIT/2010-11 dated 30/08/2010 | NIT305430.htm | TENDERDOCUMENT305430.doc | Miscellaneous repairs and painting works on change of occupancy in Type-VI Quarter in BSNL Officer Colony at Hoshiarpur (Recall). | 08-09-2010 15:00:00 |
08-09-2010 15:30:00 |
||
| NIT305434.htm | APPLICATION305434.doc | Miscellaneous repairs and painting works on change of occupancy in Type-VI Quarter in BSNL Officer Colony at Hoshiarpur (Recall).” | 08-09-2010 15:00:00 |
08-09-2010 15:30:00 |
|||
| 30/EE/BSNL/CD/JL/NIT/2010-11 | NIT305438.htm | TENDERDOCUMENT305438.doc | Miscellaneous repairs and painting works on change of occupancy in Type-VI Quarter in BSNL Officer Colony at Hoshiarpur (Recall). | 08-09-2010 15:00:00 |
08-09-2010 15:30:00 |
||
| NIT305439.htm | APPLICATION30doc5439.doc | Miscellaneous repairs and painting works on change of occupancy in Type-VI Quarter in BSNL Officer colony at Hoshiarpur (Recall). | 08-09-2010 15:00:00 |
08-09-2010 15:30:00 |
|||
| 30/EE/BSNL/CD/JL/NIT/2010-11 dated 30-08-2010 | NIT305440.htm | TENDERDOCUMENT305440.doc | Miscellaneous repairs and painting works on change of occupancy in Type-VI Quarter in BSNL Officer Colony at Hoshiarpur (Recall). | 08-09-2010 15:00:00 |
08-09-2010 15:30:00 |
||
| APPLICATION30doc5441.doc | Miscellaneous repairs and painting works on change of occupancy in Type-VI Quarter in BSNL Officer Colony at Hoshiarpur (Recall). | 08-09-2010 15:00:00 |
08-09-2010 15:30:00 |
||||
| 36/2010-11/EE/BSNL/CD/LDH Dated: 31-08-2010 | BSNL W-6 NIT 365448.htm | NIT 36-10115448.doc | Raising & Leveling of OAN Manholes and Provision for shifting of One No OAN Manhole in Bathinda City | 08-09-2010 15:00:00 |
08-09-2010 15:30:00 |
||
| 37/2010-11/EE/BSNL/CD/LDH Dated: 31-08-2010 | BSNL W-6 NIT 375449.htm | NIT 37-10115449.doc | Raising & Leveling of Cable Duct Manhole Necks in Bathinda City | 08-09-2010 15:00:00 |
08-09-2010 15:30:00 |
||
| 38/2010-11/EE/BSNL/CD/LDH Dated 31-08-2010 | BSNL W-6 NIT 385450.htm | NIT 38-1011 (MODIFIED_5450.doc | Raising of Cable duct manhole necks falling within service roads of Six laning of NH-I, G.T. Road at Khanna. | 08-09-2010 15:00:00 |
08-09-2010 15:30:00 |
||
| 36/2010-11/EE/BSNL/CD/LDH Dated: 31-08-2010 | Corrigendum_NIT 36 (Modified)5492.doc | Raising & Leveling of OAN Manholes and Provision for shifting of One No OAN Manhole in Bathinda City | 08-09-2010 15:30:00 |
||||
| 37/2010-11/EE/BSNL/CD/LDH Dated: 31-08-2010 | Corrigendum_NIT 37 (Modified)5493.doc | Raising & Leveling of Cable Duct Manhole Necks in Bathinda City | 08-09-2010 15:30:00 |
||||
| 31/EE?BSNL/CD/PTA/2010-11 dated 27.08.2010 | 1011Annexure-A-nit315415.htm | 1011nit315415.pdf | Construction of room for E/A at rented BTS site at village Kuranwala in SDCA Zirakpur. | 07-09-2010 03:00:00 |
07-09-2010 03:30:00 |
||
| 34/2010-11/EE/BSNL/CD/LDH Dated: 30-08-2010 | BSNL W-6 NIT 345426.htm | NIT 34-10115426.doc | Miscellaneous Civil work in Unutilized Hall No 5, Wind Mill Hall & provision of Temporary Toilet in Parking Area in Central University Bathinda | 07-09-2010 15:00:00 |
07-09-2010 15:30:00 |
||
| 35/2010-11/EE/BSNL/CD/LDH Dated 30-08-2010 | BSNL W-6 NIT 355427.htm | NIT 35-10115427.doc | Miscellaneous Civil Work in Unutilized 2 No. Labs in Hall No. 5 in Central University Bathinda | 07-09-2010 15:00:00 |
07-09-2010 15:30:00 |
||
| Corrigendum | Corrigendum_NIT 355429.doc | Miscellaneous Civil Work in Unutilized 2 No. Labs in Hall No. 5 in Central University Bathinda | 07-09-2010 15:30:00 |
||||
| 39/2010-11/EE/BSNL/CD/LDH Dated: 31-08-2010 | BSNL W-6 NIT 395453.htm | NIT 39-10115453.doc | Provision of M.S. grill and barbed wire fencing on compound wall for security purpose at BTS site Barewal | 06-09-2010 15:00:00 |
06-09-2010 15:30:00 |
||
| 40/2010-11/EE/BSNL/CD/LDH Dated 31-08-2010 | BSNL W-6 NIT 405454.htm | NIT 40-10115454.doc | Repairing of damaged floor in power plant room in RLU bldg. at Gujjarwal | 06-09-2010 15:00:00 |
06-09-2010 15:30:00 |
||
| 34 /EE/BSNL/CD-II/Chd/csd/mhl/2010-11 Dated : 27.8.2010. | NIT345411.htm | BlindNIT5411.pdf | Vertical extension to RLU Building Phase-IV Mohali(Modular and non modular partitions systems)SH: Provision of vertical blinds for 2nd floor of GM CMTS(NC) | 04-09-2010 15:00:00 |
04-09-2010 15:30:00 |
||
| 30/EE/BSNL/CD/PTA/2010-11 | 1011nit305392.htm | Tender Documentnit305392.doc | Provision of aluminium racks, dismantling & miscellaneous civil works in old T-III quarter at 3rd floor, old aluminium partition rearrangement in Vigilance Section in T.E. bldg Leela Bhawan Patiala | 03-09-2010 03:00:00 |
03-09-2010 03:30:00 |
||
| Renovation of CSC in RLU Building at phase –IV, Mohali | Nit325396.htm | 32NIT2010-115396.pdf | Renovation of CSC in RLU Building at phase –IV, Mohali | 03-09-2010 15:00:00 |
03-09-2010 15:30:00 |
||
| 31/EE/BSNL/CD-II//Chd/2010-2011 Dated: 26-8-2010. | NIT315397.htm | 31nit10-11a5397.pdf | A/R & M/O to 3 nos Type-II, 3 nos Type-III,3 nos Type-IV staff quarters in OCB compound Giani Zail singh Nagar Ropar, | 03-09-2010 16:00:00 |
03-09-2010 16:30:00 |
||
| 31nit10-11b5398.pdf | A/R & M/O to T.E Bldg at Naya Nangal . | 03-09-2010 15:00:00 |
03-09-2010 15:30:00 |
||||
| 31nit10-11c5399.pdf | Provision of RCC Poles and barbed wire fencing and front compound wall and gate at BSNL Plot Morinda. | 03-09-2010 15:00:00 |
03-09-2010 15:30:00 |
||||
| 33/2010-11/EE/BSNL/CD-II/CSD-PKL/CHD Dated: - 26.08.2010 | 33NIT5400.htm | 33NIT5400.pdf | Provision of partitions for O/o SDE(E) & JTO(E), BSNL Electrical Sub Division, Panchkula and other misc. civil works in TE compound at Sector-20, Panchkula.(Old available aluminium section to be used | 03-09-2010 15:00:00 |
03-09-2010 15:30:00 |
||
| Quotation no-6 dated 27.08.2010 | Q-65410.htm | Schedule of qnty Q-65410.pdf | Construction of tower foundations for 11 Nos. TCS type towers including erection works (Based on GR/TWR-12/01) in Patiala SSA | 03-09-2010 03:00:00 |
03-09-2010 03:30:00 |
||
| 33/2010-11/EE/BSNL/CD/LDH Dated 28-08-2010 | BSNL W - 65423.htm | NIT 33-10115423.doc | Provision of Tube Well in TE Building Compound at Kohara | 01-09-2010 15:00:00 |
03-09-2010 16:00:00 |
||
| 33/2010-11/EE/BSNL/CD/LDH Dated: 28-08-2010 | BSNL W - 65424.htm | NIT 33-10115424.doc | Provision of Tube Well in TE Compound at Kohara | 01-09-2010 15:00:00 |
03-09-2010 15:00:00 |
||
| BSNL W - 65425.htm | NIT 33-1011(MODIFIED)5425.doc | Provision of Tube Well in TE Compound at Kohara --- (MODIFIED) | 03-09-2010 15:00:00 |
03-09-2010 15:30:00 |
|||
| NIT No.29/EE/BSNL/CD/PTA/2010-11 | Document will be available after date Jul 07,10 | Civil Works in BSNL Park at Shahi Samadhan at Sangrur. (SH: Renovation of walking track). | 31-08-2010 03:00:00 |
31-08-2010 03:30:00 |
|||
| Corrigendum | 1011corrnit295380.htm | Civil Works in BSNL Park at Shahi Samadhan at Sangrur. (SH: Renovation of walking track). | 31-08-2010 03:30:00 |
||||
| 1011A295377.htm | nit295377.pdf | 1.Maintenance of BSNL Park at Shahi Samadhan at Sangrur from September 2010 to March 2011. | 31-08-2010 03:00:00 |
31-08-2010 03:30:00 |
|||
| Document will be available after date Jul 07,10 | Maintenance of BSNL Park at Shahi Samadhan at Sangrur from September 2010 to March 2011 | 31-08-2010 03:00:00 |
31-08-2010 03:30:00 |
||||
| 1011A295381.htm | Document will be available after date Jul 07,10 | Maintenance of BSNL Park at Shahi Samadhan at Sangrur from September 2010 to March 2011. | 31-08-2010 03:00:00 |
31-08-2010 03:30:00 |
|||
| 1011A295382.htm | Document will be available after date Jul 07,10 | Civil Works in BSNL Park at Shahi Samadhan at Sangrur. (SH: Renovation of walking track). | 31-08-2010 03:00:00 |
31-08-2010 03:30:00 |
|||
| 29/EE/BSNL/CD/PTA/2010-11 | A295405.htm | nit295405.pdf | Maintenance of BSNL Park at Shahi Samadhan at Sangrur from September 2010 to March 2011. | 31-08-2010 03:00:00 |
31-08-2010 03:30:00 |
||
| NIT29/EE/BSNL/CD/PTA/2010-11 | A295406.htm | 1011nit29-25406.pdf | Civil Works in BSNL Park at Shahi Samadhan at Sangrur. (SH: Renovation of walking track). | 31-08-2010 03:00:00 |
31-08-2010 03:30:00 |
||
| Corrigendum | 1011corrnit295407.htm | Civil Works in BSNL Park at Shahi Samadhan at Sangrur. (SH: Renovation of walking track). | 31-08-2010 03:30:00 |
||||
| 29/EE/BSNL/CD/PTA/2010-11 | 1011corrnit295408.htm | Maintenance of BSNL Park at Shahi Samadhan at Sangrur from September 2010 to March 2011. | 31-08-2010 03:30:00 |
||||
| 27/EE/BSNL/CD/ASR/2010-11 dated 16.08.2010 | Corrigendum raising5394.doc | Raising of Manhole necks, replacement of damaged Manhole covers and cleaning of blocked (Near Ptale Chowk) ducts in cable ducts networking at Pathankot. | 30-08-2010 15:30:00 |
||||
| NIT NO:28/EE/BSNL/ CD/JL/NIT/2010-11 Dated 18.08.2010 | tsecjal5419.htm | TENDERDOCUMENT285419.DOC | Miscellaneous repairs and painting works on change of occupancy in Type-VI Quarter in BSNL Officer Colony at Hoshiarpur | 30-08-2010 15:00:00 |
30-08-2010 15:30:00 |
||
| 28/EE/BSNL/CD/JL/NIT/2010-11 dated 18/08/2010 | NOTICEINVITINGTENDER285420.htm | TENDERDOCUMENT285420.doc | Miscellaneous repairs and painting works on change of occupancy in Type-VI Quarter in BSNL Officer Colony at | 30-08-2010 15:00:00 |
30-08-2010 15:30:00 |
||
| 33/EE/BSNL/CD-II/Chandigarh/2010-11 | Test civil div15389.htm | 33nit10-115389.pdf | Provision of partitions for O/o SDE(E) & JTO(E), BSNL Electrical Sub Division, Panchkula and other misc. civil works in TE compound at Sector- 20, Panchkula.(Old available aluminium section to be used | 29-08-2010 15:00:00 |
29-08-2010 15:30:00 |
||
| 27/EE/BSNL/CD/ASR/2010-11 dated 16.08.2010 | nit pkt manhole5354.htm | Tender doc Raisaing of Manhole Pathankot5354.doc | Raising of Manhole necks, replacement of damaged Manhole covers and cleaning of blocked (Near Ptale Chowk) ducts in cable ducts networking at Pathankot. | 28-08-2010 15:00:00 |
28-08-2010 15:30:00 |
||
| APPLICATION pkt manhole5355.doc | Raising of Manhole necks, replacement of damaged Manhole covers and cleaning of blocked (Near Ptale Chowk) ducts in cable ducts networking at Pathankot. | 28-08-2010 15:00:00 |
28-08-2010 15:30:00 |
||||
| nit pkt manhole5354.htm | Tender doc Raisaing of Manhole Pathankot5354.doc | Raising of Manhole necks, replacement of damaged Manhole covers and cleaning of blocked (Near Ptale Chowk) ducts in cable ducts networking at Pathankot. | 28-08-2010 15:00:00 |
28-08-2010 15:30:00 |
|||
| APPLICATION pkt manhole5355.doc | Raising of Manhole necks, replacement of damaged Manhole covers and cleaning of blocked (Near Ptale Chowk) ducts in cable ducts networking at Pathankot. | 28-08-2010 15:00:00 |
28-08-2010 15:30:00 |
||||
| Q No.05/EE/BSNL/CD/PTA/2010-11 | Q55395.htm | Schedule of Quantity Q55395.pdf | Post Constructional Anti termite Treatment of Wood Work in Qtr No. Type-V-1 staff quarters in P&T colony 22 no. phatak Patiala | 28-08-2010 03:00:00 |
28-08-2010 03:30:00 |
||
| 28/EE/BSNL/CD/ASR/2010-11 dated 19.08.2010 | APPLICATION Kitch5365.doc | Special repairs to kitchen of T-VI quarter old trunk exchange compound Amritsar. | 27-08-2010 15:00:00 |
27-08-2010 15:30:00 |
|||
| NIT Kitch5364.htm | Tender doc kitchen5364.doc | Special repairs to kitchen of T-VI quarter old trunk exchange compound Amritsar. | 27-08-2010 15:00:00 |
27-08-2010 15:30:00 |
|||
| 29/EE/BSNL/CD/ASR/2010-11 dated 19.08.2010 | NIT Toilet5367.htm | Tender Doc Toilet5367.doc | Repairs to existing toilets for costumer service centre at old trunk exchange compound Amritsar. | 27-08-2010 15:00:00 |
27-08-2010 15:30:00 |
||
| APPLICATION Toilet5368.doc | Repairs to existing toilets for costumer service centre at old trunk exchange compound Amritsar. | 27-08-2010 15:00:00 |
27-08-2010 15:30:00 |
||||
| 28/EE/BSNL/CD/ASR/2010-11 dated 19.08.2010 | APPLICATION Kitch5365.doc | Special repairs to kitchen of T-VI quarter old trunk exchange compound Amritsar. | 27-08-2010 15:00:00 |
27-08-2010 15:30:00 |
|||
| NIT Kitch5364.htm | Tender doc kitchen5364.doc | Special repairs to kitchen of T-VI quarter old trunk exchange compound Amritsar. | 27-08-2010 15:00:00 |
27-08-2010 15:30:00 |
|||
| 29/EE/BSNL/CD/ASR/2010-11 dated 19.08.2010 | NIT Toilet5367.htm | Tender Doc Toilet5367.doc | Repairs to existing toilets for costumer service centre at old trunk exchange compound Amritsar. | 27-08-2010 15:00:00 |
27-08-2010 15:30:00 |
||
| APPLICATION Toilet5368.doc | Repairs to existing toilets for costumer service centre at old trunk exchange compound Amritsar. | 27-08-2010 15:00:00 |
27-08-2010 15:30:00 |
||||
| 32/EE/BSNL/CD-II/Chandigarh/2010-11 | Doc1civil5388.htm | 32nit10-115388.pdf | Renovation of CSC in RLU Building at phase –IV, Mohali | 27-08-2010 15:00:00 |
27-08-2010 15:30:00 |
||
| BSNL W 7 &8 | BSNL_W7&85393.htm | BSNLW 8 General Terms and conditions5393.pdf | BSNLW 8 General Terms and conditions | 27-08-2010 16:00:00 |
27-08-2010 16:30:00 |
||
| 23/EE/BSNL/CD/ASR/2010-11 dated 04.08.2010 | NIT Alum5310.htm | Teder aluminum5310.doc | Provision of Fixed Aluminium Windows at OFC Station Tarantaran | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||
| APPLICATION Aluminum5311.doc | Provision of Fixed Aluminium Windows at OFC Station Tarantaran | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||||
| 24/EE/BSNL/CD/ASR/2010-11 dated 04.08.2010 | Nit Painting5312.htm | Tender Doc Painting 035312.doc | A/R & M/O to BSNL buildings and staff quarters under BSNL Civil Sub Division-II, Amritsar during the year 2010-11(SH:-Painting of Type-VI quarter in CTO Compound Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||
| APPLICATION Painting 035313.doc | A/R & M/O to BSNL buildings and staff quarters under BSNL Civil Sub Division-II, Amritsar during the year 2010-11(SH:-Painting of Type-VI quarter in CTO Compound Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||||
| 25/EE/BSNL/CD/ASR/2010-11 dated 04.08.2010 | Nit Cleaning5314.htm | Tender doc Cleaning 035314.doc | Cleaning of terraces of BSNL buildings and staff qtrs during the year 2010-11 for area under BSNLCivil Sub Division-II Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||
| APPLICATION Cleaning 035315.doc | Cleaning of terraces of BSNL buildings and staff qtrs during the year 2010-11 for area under BSNLCivil Sub Division-II Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||||
| 26/EE/BSNL/CD/ASR/2010-11 dated 04.08.2010 | Nit Anti5316.htm | Tender Antitrmite5316.doc | Post constructional anti-termite treatment at GMT residence Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||
| APPLICATION antitrmite5317.doc | Post constructional anti-termite treatment at GMT residence Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||||
| 23/EE/BSNL/CD/ASR/2010-11 dated 04.08.2010 | NIT Alum5310.htm | Teder aluminum5310.doc | Provision of Fixed Aluminium Windows at OFC Station Tarantaran | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||
| APPLICATION Aluminum5311.doc | Provision of Fixed Aluminium Windows at OFC Station Tarantaran | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||||
| 24/EE/BSNL/CD/ASR/2010-11 dated 04.08.2010 | Nit Painting5312.htm | Tender Doc Painting 035312.doc | A/R & M/O to BSNL buildings and staff quarters under BSNL Civil Sub Division-II, Amritsar during the year 2010-11(SH:-Painting of Type-VI quarter in CTO Compound Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||
| APPLICATION Painting 035313.doc | A/R & M/O to BSNL buildings and staff quarters under BSNL Civil Sub Division-II, Amritsar during the year 2010-11(SH:-Painting of Type-VI quarter in CTO Compound Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||||
| 25/EE/BSNL/CD/ASR/2010-11 dated 04.08.2010 | Nit Cleaning5314.htm | Tender doc Cleaning 035314.doc | Cleaning of terraces of BSNL buildings and staff qtrs during the year 2010-11 for area under BSNLCivil Sub Division-II Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||
| APPLICATION Cleaning 035315.doc | Cleaning of terraces of BSNL buildings and staff qtrs during the year 2010-11 for area under BSNLCivil Sub Division-II Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||||
| 26/EE/BSNL/CD/ASR/2010-11 dated 04.08.2010 | Nit Anti5316.htm | Tender Antitrmite5316.doc | Post constructional anti-termite treatment at GMT residence Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||
| APPLICATION antitrmite5317.doc | Post constructional anti-termite treatment at GMT residence Amritsar | 12-08-2010 15:00:00 |
12-08-2010 15:30:00 |
||||
| 21/EE/BSNL/CD/ASR/20010-11 dated 28.07.2010 | NIT5291.htm | Tender doc5291.doc | Provision of New Tubewell in P & T colony, Goal Bagh, Amritsar” | 07-08-2010 15:00:00 |
07-08-2010 15:30:00 |
||
| Application5293.doc | Provision of New Tubewell in P & T colony, Goal Bagh, Amritsar” | 07-08-2010 15:00:00 |
07-08-2010 15:30:00 |
||||
| 22/EE/BSNL/CD/ASR/2010-11 dated 28.07.2010 | Nit5294.htm | Tender Doc5294.doc | Raising of Manhole necks in area under Bhagtanwala Exchange Amritsar” | 07-08-2010 15:00:00 |
07-08-2010 15:30:00 |
||
| Application5295.doc | Raising of Manhole necks in area under Bhagtanwala Exchange Amritsar” | 07-08-2010 15:00:00 |
07-08-2010 15:30:00 |
||||
| 21/EE/BSNL/CD/ASR/20010-11 dated 28.07.2010 | NIT5291.htm | Tender doc5291.doc | Provision of New Tubewell in P & T colony, Goal Bagh, Amritsar” | 07-08-2010 15:00:00 |
07-08-2010 15:30:00 |
||
| Application5293.doc | Provision of New Tubewell in P & T colony, Goal Bagh, Amritsar” | 07-08-2010 15:00:00 |
07-08-2010 15:30:00 |
||||
| 22/EE/BSNL/CD/ASR/2010-11 dated 28.07.2010 | Nit5294.htm | Tender Doc5294.doc | Raising of Manhole necks in area under Bhagtanwala Exchange Amritsar” | 07-08-2010 15:00:00 |
07-08-2010 15:30:00 |
||
| Application5295.doc | Raising of Manhole necks in area under Bhagtanwala Exchange Amritsar” | 07-08-2010 15:00:00 |
07-08-2010 15:30:00 |
||||
| NIT NO : 18/EE/BSNL/CD/ASR/2010-11 dated 20.07.2010 | NIT Terrace5256.htm | tender document terrace5256.doc | ARMO to buildings under SDCA Rayya ,Ajnala & Amritsar local buildings under BSNL Civil Sub Division-I Amritsar in the year 2010-11 (SH:- Cleaning of terraces & water storage tank) | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||
| APPLICATION terrace5257.doc | ARMO to buildings under SDCA Rayya ,Ajnala & Amritsar local buildings under BSNL Civil Sub Division-I Amritsar in the year 2010-11 (SH:- Cleaning of terraces & water storage tank) | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||||
| 19/EE/BSNL/CD/ASR/2010-11 dated 20.07.2010 | NIT Cable5258.htm | tender document cable5258.doc | Sealing the Cable Trench from sewerage water in T.E. Compound at Majitha | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||
| APPLICATION cable5259.doc | Sealing the Cable Trench from sewerage water in T.E. Compound at Majitha | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||||
| 20/EE/BSNL/CD/ASR/2010-11 dated 20.07.2010 | NIT Batala5260.htm | tender document batala5260.doc | ARMO to buildings and quarters in SSA during the year 2010-11 (SH:_ Miscellaneous Civil works in T.E building & Staff quarters Compound at Batala) | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||
| APPLICATION batla5261.doc | ARMO to buildings and quarters in SSA during the year 2010-11 (SH:_ Miscellaneous Civil works in T.E building & Staff quarters Compound at Batala) | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||||
| NIT NO : 18/EE/BSNL/CD/ASR/2010-11 dated 20.07.2010 | NIT Terrace5256.htm | tender document terrace5256.doc | ARMO to buildings under SDCA Rayya ,Ajnala & Amritsar local buildings under BSNL Civil Sub Division-I Amritsar in the year 2010-11 (SH:- Cleaning of terraces & water storage tank) | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||
| APPLICATION terrace5257.doc | ARMO to buildings under SDCA Rayya ,Ajnala & Amritsar local buildings under BSNL Civil Sub Division-I Amritsar in the year 2010-11 (SH:- Cleaning of terraces & water storage tank) | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||||
| 19/EE/BSNL/CD/ASR/2010-11 dated 20.07.2010 | NIT Cable5258.htm | tender document cable5258.doc | Sealing the Cable Trench from sewerage water in T.E. Compound at Majitha | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||
| APPLICATION cable5259.doc | Sealing the Cable Trench from sewerage water in T.E. Compound at Majitha | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||||
| 20/EE/BSNL/CD/ASR/2010-11 dated 20.07.2010 | NIT Batala5260.htm | tender document batala5260.doc | ARMO to buildings and quarters in SSA during the year 2010-11 (SH:_ Miscellaneous Civil works in T.E building & Staff quarters Compound at Batala) | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||
| APPLICATION batla5261.doc | ARMO to buildings and quarters in SSA during the year 2010-11 (SH:_ Miscellaneous Civil works in T.E building & Staff quarters Compound at Batala) | 29-07-2010 15:00:00 |
29-07-2010 15:30:00 |
||||
| 17/EE/BSNL/CD/ASR/20010-11 dated 08.07.2010 | Corrigendum pkt5246.htm | Replacement of old damaged A.C sheet roofing of shed at Focal Point Pathankot | 20-07-2010 15:30:00 |
||||
| Corrigendum | Corrigendum pkt5246.htm | Replacement of old damaged A.C sheet roofing of shed at Focal Point Pathankot | 20-07-2010 15:30:00 |
||||
| NIT5221.htm | Tender Doc AC Sheet5221.doc | Replacement of old damaged A.C sheet roofing of shed at Focal Point Pathankot | 19-07-2010 15:00:00 |
19-07-2010 15:30:00 |
|||
| APPLICATION5222.doc | Replacement of old damaged A.C sheet roofing of shed at Focal Point Pathankot | 19-07-2010 15:00:00 |
19-07-2010 15:30:00 |
||||
| NIT5221.htm | Tender Doc AC Sheet5221.doc | Replacement of old damaged A.C sheet roofing of shed at Focal Point Pathankot | 19-07-2010 15:00:00 |
19-07-2010 15:30:00 |
|||
| APPLICATION5222.doc | Replacement of old damaged A.C sheet roofing of shed at Focal Point Pathankot | 19-07-2010 15:00:00 |
19-07-2010 15:30:00 |
||||
| 15/EE/BSNL/CD/ASR/2010-11dated 03.07.2010 | Nit5199.htm | Tender Doc IQW5199.doc | PROVISION OF ALUMINIUM WINDOWS TO BALCONIES OF INSPECTION QUARTER AT 2ND FLOOR IN E-10B BUILDING PATHANKOT. | 12-07-2010 15:00:00 |
12-07-2010 15:30:00 |
||
| APPLICATION5200.doc | PROVISION OF ALUMINIUM WINDOWS TO BALCONIES OF INSPECTION QUARTER AT 2ND FLOOR IN E-10B BUILDING PATHANKOT. | 12-07-2010 15:00:00 |
12-07-2010 15:30:00 |
||||
| 16/EE/BSNL/CD/ASR/2010-11dated 03.07.2010 | NIT5201.htm | Tende rdoc5201.doc | Provision of open racks in Balconies of Inspection Quarter at 2nd floor in T.E Building Pathankot. | 12-07-2010 15:00:00 |
12-07-2010 15:30:00 |
||
| APPLICATION5202.doc | Provision of open racks in Balconies of Inspection Quarter at 2nd floor in T.E Building Pathankot. | 12-07-2010 15:00:00 |
12-07-2010 15:30:00 |
||||
| 15/EE/BSNL/CD/ASR/2010-11dated 03.07.2010 | Nit5199.htm | Tender Doc IQW5199.doc | PROVISION OF ALUMINIUM WINDOWS TO BALCONIES OF INSPECTION QUARTER AT 2ND FLOOR IN E-10B BUILDING PATHANKOT. | 12-07-2010 15:00:00 |
12-07-2010 15:30:00 |
||
| APPLICATION5200.doc | PROVISION OF ALUMINIUM WINDOWS TO BALCONIES OF INSPECTION QUARTER AT 2ND FLOOR IN E-10B BUILDING PATHANKOT. | 12-07-2010 15:00:00 |
12-07-2010 15:30:00 |
||||
| 16/EE/BSNL/CD/ASR/2010-11dated 03.07.2010 | NIT5201.htm | Tende rdoc5201.doc | Provision of open racks in Balconies of Inspection Quarter at 2nd floor in T.E Building Pathankot. | 12-07-2010 15:00:00 |
12-07-2010 15:30:00 |
||
| APPLICATION5202.doc | Provision of open racks in Balconies of Inspection Quarter at 2nd floor in T.E Building Pathankot. | 12-07-2010 15:00:00 |
12-07-2010 15:30:00 |
||||
| 4/EE/BSNL/CD/ASR/20010-11 dated 24.06.2010 | 14_OPNL_JOB_ NIT5181.htm | 14_OPNL_JOB_ tender document5181.doc | A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2010-11 ( SH : Maintenance &Operational jobs in O/O the EE (C) & SDE -1(C) Asr , PH-1. | 02-07-2010 15:00:00 |
04-07-2010 15:30:00 |
||
| 14_OPNL_JOB_ NIT5181.htm | 14_OPNL_JOB_ tender document5181.doc | A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2010-11 ( SH : Maintenance &Operational jobs in O/O the EE (C) & SDE -1(C) Asr , PH-1. | 02-07-2010 15:00:00 |
04-07-2010 15:30:00 |
|||
| 13/EE/BSNL/CD/ASR/20010-11 dated 23.06.2010 | 13_HORT_GRDM_ tender document5178.htm | 13_HORT_GRDM_ blank application5178.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg, Amritsar during theYear 2010-11 (Phase -I). | 02-07-2010 15:00:00 |
02-07-2010 15:30:00 |
||
| 4/EE/BSNL/CD/ASR/20010-11 dated 24.06.2010 | 14_OPN_JOB_ blank application5182.doc | A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2010-11 ( SH : Maintenance &Operational jobs in O/O the EE (C) & SDE -1(C) Asr , PH-1. | 02-07-2010 15:00:00 |
02-07-2010 15:30:00 |
|||
| 13/EE/BSNL/CD/ASR/20010-11 dated 23.06.2010 | 13_HORT_GRDM_ tender document5178.htm | 13_HORT_GRDM_ blank application5178.doc | Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg, Amritsar during theYear 2010-11 (Phase -I). | 02-07-2010 15:00:00 |
02-07-2010 15:30:00 |
||
| 4/EE/BSNL/CD/ASR/20010-11 dated 24.06.2010 | 14_OPN_JOB_ blank application5182.doc | A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2010-11 ( SH : Maintenance &Operational jobs in O/O the EE (C) & SDE -1(C) Asr , PH-1. | 02-07-2010 15:00:00 |
02-07-2010 15:30:00 |
|||
| 12/EE/BSNL/CD/ASR/2010-11 dated 16..06.2010 | Nit5135.htm | Tender Document SDE-I5135.doc | Day to day Maintenance of BSNL Buildings and Staff quarters of area under BSNL Civil Subdivision-I (Except SDCA Batala), Amritsar during the year 2010-11 | 28-06-2010 15:00:00 |
28-06-2010 15:30:00 |
||
| APPLICATION5136.doc | Day to day Maintenance of BSNL Buildings and Staff quarters of area under BSNL Civil Subdivision-I (Except SDCA Batala), Amritsar during the year 2010-11 | 28-06-2010 15:00:00 |
28-06-2010 15:30:00 |
||||
| Nit5135.htm | Tender Document SDE-I5135.doc | Day to day Maintenance of BSNL Buildings and Staff quarters of area under BSNL Civil Subdivision-I (Except SDCA Batala), Amritsar during the year 2010-11 | 28-06-2010 15:00:00 |
28-06-2010 15:30:00 |
|||
| APPLICATION5136.doc | Day to day Maintenance of BSNL Buildings and Staff quarters of area under BSNL Civil Subdivision-I (Except SDCA Batala), Amritsar during the year 2010-11 | 28-06-2010 15:00:00 |
28-06-2010 15:30:00 |
||||
| 11/EE/BSNL/CD/ASR/2010-11 dated 09.06.2010 | NIT Duct5095.htm | Tender Duct doc Final5095.doc | Repairs to cable duct near Gumtala Chowk Bye-Pass Amritsar. | 17-06-2010 15:00:00 |
17-06-2010 15:30:00 |
||
| APPLICATION Duct5096.doc | Repairs to cable duct near Gumtala Chowk Bye-Pass Amritsar. | 17-06-2010 15:00:00 |
17-06-2010 15:30:00 |
||||
| NIT Duct5095.htm | Tender Duct doc Final5095.doc | Repairs to cable duct near Gumtala Chowk Bye-Pass Amritsar. | 17-06-2010 15:00:00 |
17-06-2010 15:30:00 |
|||
| APPLICATION Duct5096.doc | Repairs to cable duct near Gumtala Chowk Bye-Pass Amritsar. | 17-06-2010 15:00:00 |
17-06-2010 15:30:00 |
||||
| 05/EE/BSNL/CD/ASR/2010-11 dated 02.06.201 | Nit Ranjit Avenue5040.htm | TenderRanjit avenue5040.doc | Maintenance of Horticulture works in BSNL Compound, Ranjit Avenue Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| application Ranjit5041.doc | Maintenance of Horticulture works in BSNL Compound, Ranjit Avenue Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 04/EE/BSNL/CD/ASR/2010-11 dated 02.06.2010 | NIT Goal5055.htm | Tender Goal B5055.doc | Maintenance of Horticulture works in BSNL compound at P&T colony, Goal Bagh, Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| NIT Goal5056.htm | APPLICATION Goal B5056.doc | Maintenance of Horticulture works in BSNL compound at P&T colony, Goal Bagh, Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
|||
| 06/EE/BSNL/CD/ASR/2010-11 dated 02.06.2010 | Goindwal5057.htm | Tender Goindwall5057.doc | Maintenance of Horticulture works in BSNL Compound, Goindwal Sahib Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| Application Goinidwall5058.doc | Maintenance of Horticulture works in BSNL Compound, Goindwal Sahib Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 07/EE/BSNL/CD/ASR/2010-11 dated 02.06.2010 | NIT KSS5059.htm | Tender KSS5059.doc | Maintenance of Horticulture works in BSNL Compound, at Chheharta and Katra Sher Singh Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| Application KSS5061.doc | Maintenance of Horticulture works in BSNL Compound, at Chheharta and Katra Sher Singh Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 08/EE/BSNL/CD/ASR/2010-11 dated 07.06.2010 | NIT Mall5083.htm | Tender Mall Mandi5083.doc | Maintenance of Horticulture works in BSNL Compound, at Mall mandi Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| APPLICATION Mall Mandi5084.doc | Maintenance of Horticulture works in BSNL Compound, at Mall mandi Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 09/EE/BSNL/CD/ASR/2010-11 dated 07.06.2010 | NIT Batala5085.htm | Tender Batala5085.doc | Maintenance of Horticulture works in BSNL Compound, at Batala during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| APPLICATION Batala5086.doc | Maintenance of Horticulture works in BSNL Compound, at Batala during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 10/EE/BSNL/CD/ASR/2010-11 dated 07.06.201 | NIT Jandiala5087.htm | Tender Jandiala Guru5087.doc | Maintenance of Horticulture works in BSNL Compound, at Jandiala Guru Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| APPLICATION Jandiala Guru5088.doc | Maintenance of Horticulture works in BSNL Compound, at Jandiala Guru Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 05/EE/BSNL/CD/ASR/2010-11 dated 02.06.201 | Nit Ranjit Avenue5040.htm | TenderRanjit avenue5040.doc | Maintenance of Horticulture works in BSNL Compound, Ranjit Avenue Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| application Ranjit5041.doc | Maintenance of Horticulture works in BSNL Compound, Ranjit Avenue Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 04/EE/BSNL/CD/ASR/2010-11 dated 02.06.2010 | NIT Goal5055.htm | Tender Goal B5055.doc | Maintenance of Horticulture works in BSNL compound at P&T colony, Goal Bagh, Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| NIT Goal5056.htm | APPLICATION Goal B5056.doc | Maintenance of Horticulture works in BSNL compound at P&T colony, Goal Bagh, Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
|||
| 06/EE/BSNL/CD/ASR/2010-11 dated 02.06.2010 | Goindwal5057.htm | Tender Goindwall5057.doc | Maintenance of Horticulture works in BSNL Compound, Goindwal Sahib Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| Application Goinidwall5058.doc | Maintenance of Horticulture works in BSNL Compound, Goindwal Sahib Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 07/EE/BSNL/CD/ASR/2010-11 dated 02.06.2010 | NIT KSS5059.htm | Tender KSS5059.doc | Maintenance of Horticulture works in BSNL Compound, at Chheharta and Katra Sher Singh Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| Application KSS5061.doc | Maintenance of Horticulture works in BSNL Compound, at Chheharta and Katra Sher Singh Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 08/EE/BSNL/CD/ASR/2010-11 dated 07.06.2010 | NIT Mall5083.htm | Tender Mall Mandi5083.doc | Maintenance of Horticulture works in BSNL Compound, at Mall mandi Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| APPLICATION Mall Mandi5084.doc | Maintenance of Horticulture works in BSNL Compound, at Mall mandi Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 09/EE/BSNL/CD/ASR/2010-11 dated 07.06.2010 | NIT Batala5085.htm | Tender Batala5085.doc | Maintenance of Horticulture works in BSNL Compound, at Batala during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| APPLICATION Batala5086.doc | Maintenance of Horticulture works in BSNL Compound, at Batala during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 10/EE/BSNL/CD/ASR/2010-11 dated 07.06.201 | NIT Jandiala5087.htm | Tender Jandiala Guru5087.doc | Maintenance of Horticulture works in BSNL Compound, at Jandiala Guru Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||
| APPLICATION Jandiala Guru5088.doc | Maintenance of Horticulture works in BSNL Compound, at Jandiala Guru Amritsar during the year 2010-11(Phase-I) | 14-06-2010 15:00:00 |
14-06-2010 15:30:00 |
||||
| 03EEBSNLCDASR20010-11 dated 19.05.2010 | NIT4995.htm | Teder doc Final4995.doc | Day to day maintenance of BSNL buildings and Staff quarters of area under BSNL Civil Sub Division –II Amritsar during the year 2010-11 | 29-05-2010 15:00:00 |
29-05-2010 15:30:00 |
||
| APPLICATION4996.doc | Day to day maintenance of BSNL buildings and Staff quarters of area under BSNL Civil Sub Division –II Amritsar during the year 2010-11 | 29-05-2010 15:00:00 |
29-05-2010 15:30:00 |
||||
| NIT4995.htm | Teder doc Final4995.doc | Day to day maintenance of BSNL buildings and Staff quarters of area under BSNL Civil Sub Division –II Amritsar during the year 2010-11 | 29-05-2010 15:00:00 |
29-05-2010 15:30:00 |
|||
| APPLICATION4996.doc | Day to day maintenance of BSNL buildings and Staff quarters of area under BSNL Civil Sub Division –II Amritsar during the year 2010-11 | 29-05-2010 15:00:00 |
29-05-2010 15:30:00 |
||||
| 02EEBSNLCDASR2010-11 dated 17.05.2010 | NIT4982.htm | Tender doc water4982.doc | Cleaning of water storage tanks during the year of 2010-11(phase-I) for area under BSNL Civil Sub Division-II, Amritsar | 25-05-2010 15:00:00 |
25-05-2010 15:30:00 |
||
| APPLICATION4983.doc | Cleaning of water storage tanks during the year of 2010-11(phase-I) for area under BSNL Civil Sub Division-II, Amritsar | 25-05-2010 15:00:00 |
25-05-2010 15:30:00 |
||||
| NIT4982.htm | Tender doc water4982.doc | Cleaning of water storage tanks during the year of 2010-11(phase-I) for area under BSNL Civil Sub Division-II, Amritsar | 25-05-2010 15:00:00 |
25-05-2010 15:30:00 |
|||
| APPLICATION4983.doc | Cleaning of water storage tanks during the year of 2010-11(phase-I) for area under BSNL Civil Sub Division-II, Amritsar | 25-05-2010 15:00:00 |
25-05-2010 15:30:00 |
||||
| 04/2010-11/EE/BSNL/CD-I/CHD dated 23-4-2010 | 04NIT104890.htm | 04NIT104890.pdf | C/o 100 rooms hostel with dining hall facility, Guest room, Warden office and residence in IMTECH, Chandigarh | 10-05-2010 15:00:00 |
10-05-2010 15:30:00 |
||
| 04NIT104890.htm | 04NIT104890.pdf | C/o 100 rooms hostel with dining hall facility, Guest room, Warden office and residence in IMTECH, Chandigarh | 10-05-2010 15:00:00 |
10-05-2010 15:30:00 |
|||
| 01EEBSNLCDASR2010-11 dated 27.04.2010 | NIT4909.htm | Tender Doc qdn4909.doc | Cleaning of rain water recharging tank and rain water collecting chambers in T.E building Compound at Qadian. | 03-05-2010 15:00:00 |
03-05-2010 15:30:00 |
||
| APPLICATIO14910.doc | Cleaning of rain water recharging tank and rain water collecting chambers in T.E building Compound at Qadian. | 03-05-2010 15:00:00 |
03-05-2010 15:30:00 |
||||
| NIT4909.htm | Tender Doc qdn4909.doc | Cleaning of rain water recharging tank and rain water collecting chambers in T.E building Compound at Qadian. | 03-05-2010 15:00:00 |
03-05-2010 15:30:00 |
|||
| APPLICATIO14910.doc | Cleaning of rain water recharging tank and rain water collecting chambers in T.E building Compound at Qadian. | 03-05-2010 15:00:00 |
03-05-2010 15:30:00 |
||||
| corrigrndum | Corrigendum4904.htm | CORRIGENDUM4904.pdf | “C/o tower foundation for 40m TCS type tower (Based on GR/TWR-12/01) IETE, Sector 30B, Chandigarh.) | 28-04-2010 15:00:00 |
28-04-2010 15:30:00 |
||
| Corrigendum4904.htm | CORRIGENDUM4904.pdf | “C/o tower foundation for 40m TCS type tower (Based on GR/TWR-12/01) IETE, Sector 30B, Chandigarh.) | 28-04-2010 15:00:00 |
28-04-2010 15:30:00 |
|||
| 03/2010-11/EE/BSNL/CD-I/CHD dated 17-4-2010 | 03NIT104867.htm | 03NIT104867.pdf | C/o tower foundation for 401m TCS type tower (Based on GR/TWR-12/01) IETE, Sector 30B, Chandigarh | 26-04-2010 15:00:00 |
26-04-2010 15:30:00 |
||
| 03NIT104867.htm | 03NIT104867.pdf | C/o tower foundation for 401m TCS type tower (Based on GR/TWR-12/01) IETE, Sector 30B, Chandigarh | 26-04-2010 15:00:00 |
26-04-2010 15:30:00 |
|||
| 84EEBSNLCDASR2009 10 dated 30032010 | APPLICATION Horti4816.doc | Horticulture works and Upkeeping of Lawns/ Plants in T.E Building Compound Pathankot and Gurdaspur during the year 2010-11 [April 2010 to September 2010] | 09-04-2010 15:00:00 |
15-04-2010 15:30:00 |
|||
| APPLICATION Horti4816.doc | Horticulture works and Upkeeping of Lawns/ Plants in T.E Building Compound Pathankot and Gurdaspur during the year 2010-11 [April 2010 to September 2010] | 09-04-2010 15:00:00 |
15-04-2010 15:30:00 |
||||
| 01/2010-11/EE/BSNL/CD-I/CHD dated 5-4-2010 | 01NIT104835.htm | 01NIT104835.pdf | Provision of Aluminium Partition at Ist floor TE Bhawan, Sector 27, Chandigarh. | 13-04-2010 15:00:00 |
13-04-2010 15:30:00 |
||
| 02/2010-11/EE/BSNL/CD-I/CHD dated 5-4-2010 | 02NIT104836.htm | 02NIT104836.pdf | Provision of Horticulture works in Telephone Bhawan, Sector-27, Chandigarh. | 13-04-2010 15:00:00 |
13-04-2010 15:30:00 |
||
| 01/2010-11/EE/BSNL/CD-I/CHD dated 5-4-2010 | 01NIT104835.htm | 01NIT104835.pdf | Provision of Aluminium Partition at Ist floor TE Bhawan, Sector 27, Chandigarh. | 13-04-2010 15:00:00 |
13-04-2010 15:30:00 |
||
| 02/2010-11/EE/BSNL/CD-I/CHD dated 5-4-2010 | 02NIT104836.htm | 02NIT104836.pdf | Provision of Horticulture works in Telephone Bhawan, Sector-27, Chandigarh. | 13-04-2010 15:00:00 |
13-04-2010 15:30:00 |
||
| 84EEBSNLCDASR2009 10 dated 30032010 | NIT horti4815.htm | Tender4815.doc | Horticulture works and Upkeeping of Lawns/ Plants in T.E Building Compound Pathankot and Gurdaspur during the year 2010-11 [April 2010 to September 2010] | 09-04-2010 15:00:00 |
09-04-2010 15:30:00 |
||
| 85EEBSNLCDASR2009 10 dated 30032010 | Nit mtc4817.htm | Tender doc Mtc4817.doc | Maintenance & Operational Jobs in O/o the SDE (C), Pathankot during the year 2010-11 [April to September ] | 09-04-2010 15:00:00 |
09-04-2010 15:30:00 |
||
| APPLICATION Mtc4818.doc | Maintenance & Operational Jobs in O/o the SDE (C), Pathankot during the year 2010-11 [April to September ] | 09-04-2010 15:00:00 |
09-04-2010 15:30:00 |
||||
| 84EEBSNLCDASR2009 10 dated 30032010 | New Microsoft Word Document4819.doc | Horticulture works and Upkeeping of Lawns/ Plants in T.E Building Compound Pathankot and Gurdaspur during the year 2010-11 [April 2010 to September 2010] | 09-04-2010 15:30:00 |
||||
| Corrigendum | Corrigendum4820.doc | Horticulture works and Upkeeping of Lawns/ Plants in T.E Building Compound Pathankot and Gurdaspur during the year 2010-11 [April 2010 to September 2010] | 09-04-2010 15:30:00 |
||||
| NIT horti4815.htm | Tender4815.doc | Horticulture works and Upkeeping of Lawns/ Plants in T.E Building Compound Pathankot and Gurdaspur during the year 2010-11 [April 2010 to September 2010] | 09-04-2010 15:00:00 |
09-04-2010 15:30:00 |
|||
| 85EEBSNLCDASR2009 10 dated 30032010 | Nit mtc4817.htm | Tender doc Mtc4817.doc | Maintenance & Operational Jobs in O/o the SDE (C), Pathankot during the year 2010-11 [April to September ] | 09-04-2010 15:00:00 |
09-04-2010 15:30:00 |
||
| APPLICATION Mtc4818.doc | Maintenance & Operational Jobs in O/o the SDE (C), Pathankot during the year 2010-11 [April to September ] | 09-04-2010 15:00:00 |
09-04-2010 15:30:00 |
||||
| 84EEBSNLCDASR2009 10 dated 30032010 | New Microsoft Word Document4819.doc | Horticulture works and Upkeeping of Lawns/ Plants in T.E Building Compound Pathankot and Gurdaspur during the year 2010-11 [April 2010 to September 2010] | 09-04-2010 15:30:00 |
||||
| Corrigendum | Corrigendum4820.doc | Horticulture works and Upkeeping of Lawns/ Plants in T.E Building Compound Pathankot and Gurdaspur during the year 2010-11 [April 2010 to September 2010] | 09-04-2010 15:30:00 |
||||
| 83/EE/BSNL/CD/ASR/2009-10 dated 29.03.2010 | NIT F4806.htm | Tender Doc4806.doc | Petty works and day to day repairs to BSNL buildings and Staff quarters under BSNL Civil Sub Division Pathankot during the year 2010-11 | 07-04-2010 15:00:00 |
07-04-2010 15:30:00 |
||
| APPLICATION4807.doc | Petty works and day to day repairs to BSNL buildings and Staff quarters under BSNL Civil Sub Division Pathankot during the year 2010-11 | 07-04-2010 15:00:00 |
07-04-2010 15:30:00 |
||||
| NIT F4806.htm | Tender Doc4806.doc | Petty works and day to day repairs to BSNL buildings and Staff quarters under BSNL Civil Sub Division Pathankot during the year 2010-11 | 07-04-2010 15:00:00 |
07-04-2010 15:30:00 |
|||
| APPLICATION4807.doc | Petty works and day to day repairs to BSNL buildings and Staff quarters under BSNL Civil Sub Division Pathankot during the year 2010-11 | 07-04-2010 15:00:00 |
07-04-2010 15:30:00 |
||||
| 34/2009-10/EE/BSNL/CD-I/CHD dated 19-3-2010 | 34NIT4777.htm | 34NIT094777.pdf | Day to day maintenance including special repairs to BSNL Staff Quarters at Sector-44, Chandigarh for the period 2010-2011 | 27-03-2010 15:00:00 |
27-03-2010 15:30:00 |
||
| 34NIT09(i)4778.pdf | Day to day maintenance and special repairs to BSNL Adminstrative and Technical building under the jurisdiction of BSNL Civil Sub Division-I,Chandigarh for the period 2010-2011 | 27-03-2010 15:00:00 |
27-03-2010 15:30:00 |
||||
| 34NIT09(ii)4779.pdf | A/R & M/o to Telephone Exchange, Sector-4, Chandigarh. | 27-03-2010 15:00:00 |
27-03-2010 15:30:00 |
||||
| 34NIT4777.htm | 34NIT094777.pdf | Day to day maintenance including special repairs to BSNL Staff Quarters at Sector-44, Chandigarh for the period 2010-2011 | 27-03-2010 15:00:00 |
27-03-2010 15:30:00 |
|||
| 34NIT09(i)4778.pdf | Day to day maintenance and special repairs to BSNL Adminstrative and Technical building under the jurisdiction of BSNL Civil Sub Division-I,Chandigarh for the period 2010-2011 | 27-03-2010 15:00:00 |
27-03-2010 15:30:00 |
||||
| 34NIT09(ii)4779.pdf | A/R & M/o to Telephone Exchange, Sector-4, Chandigarh. | 27-03-2010 15:00:00 |
27-03-2010 15:30:00 |
||||
| 33/2009-10/EE/BSNL/CD-I/CHD dated 11-3-2010 | 33NIT4760.htm | 33NIT094760.pdf | Day to day maintenance and special repairs to BSNL Staff Quarters at Sector-27C, Chandigarh for the period 2010-11 | 19-03-2010 15:00:00 |
19-03-2010 15:30:00 |
||
| 33NIT09(i)4761.pdf | Day to day maintenance and special repairs to BSNL Staff Quarters at Sector-30, Chandigarh for the period 2010-11 | 19-03-2010 15:00:00 |
19-03-2010 15:30:00 |
||||
| 33NIT09(ii)4762.pdf | Day to day maintenance and special repairs to Technical and Administrative building under the jurisdiction of BSNL Civil Sub Division-III, Chandigarh during the period 2010-2011 | 19-03-2010 15:00:00 |
19-03-2010 15:30:00 |
||||
| 33NIT4760.htm | 33NIT094760.pdf | Day to day maintenance and special repairs to BSNL Staff Quarters at Sector-27C, Chandigarh for the period 2010-11 | 19-03-2010 15:00:00 |
19-03-2010 15:30:00 |
|||
| 33NIT09(i)4761.pdf | Day to day maintenance and special repairs to BSNL Staff Quarters at Sector-30, Chandigarh for the period 2010-11 | 19-03-2010 15:00:00 |
19-03-2010 15:30:00 |
||||
| 33NIT09(ii)4762.pdf | Day to day maintenance and special repairs to Technical and Administrative building under the jurisdiction of BSNL Civil Sub Division-III, Chandigarh during the period 2010-2011 | 19-03-2010 15:00:00 |
19-03-2010 15:30:00 |
||||
| 32/2009-10/EE/BSNL/CD-I/CHD dated 5-3-2010 | 32 NIT4731.htm | 32NIT094731.pdf | Provision of wire gauge shutters in toilets of T-IV Staff Quarters at Sector-36B, Chandigarh. | 15-03-2010 15:00:00 |
15-03-2010 15:30:00 |
||
| 81EEBSNLCDASR2009-10 Dated06032010 | NIT Vec4734.htm | vehicle asr4734.doc | Hiring of 01 No. of Non Air Conditioned Light Commercial Vehicle for 1600 Kms. Per month. | 15-03-2010 15:00:00 |
15-03-2010 15:30:00 |
||
| 82EEBSNLCDASR200910 dated 06032010 | NIT4735.htm | Tender Document4735.doc | Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave Boundary Wall) | 15-03-2010 15:00:00 |
15-03-2010 15:30:00 |
||
| APPLICATION4736.doc | Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave Boundary Wall) | 15-03-2010 15:00:00 |
15-03-2010 15:30:00 |
||||
| 32/2009-10/EE/BSNL/CD-I/CHD dated 5-3-2010 | 32 NIT4731.htm | 32NIT094731.pdf | Provision of wire gauge shutters in toilets of T-IV Staff Quarters at Sector-36B, Chandigarh. | 15-03-2010 15:00:00 |
15-03-2010 15:30:00 |
||
| 81EEBSNLCDASR2009-10 Dated06032010 | NIT Vec4734.htm | vehicle asr4734.doc | Hiring of 01 No. of Non Air Conditioned Light Commercial Vehicle for 1600 Kms. Per month. | 15-03-2010 15:00:00 |
15-03-2010 15:30:00 |
||
| 82EEBSNLCDASR200910 dated 06032010 | NIT4735.htm | Tender Document4735.doc | Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave Boundary Wall) | 15-03-2010 15:00:00 |
15-03-2010 15:30:00 |
||
| APPLICATION4736.doc | Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave Boundary Wall) | 15-03-2010 15:00:00 |
15-03-2010 15:30:00 |
||||
| 31/2009-10/EE/BSNL/CD-I/CHD dated 26-2-2010 | Soil investigation4718.htm | 31NIT094718.pdf | Civil/Infrastructure works at NIPER, Mohali (Sh: Soil Investigation for Auditorium) | 06-03-2010 15:00:00 |
06-03-2010 15:30:00 |
||
| Soil investigation4718.htm | 31NIT094718.pdf | Civil/Infrastructure works at NIPER, Mohali (Sh: Soil Investigation for Auditorium) | 06-03-2010 15:00:00 |
06-03-2010 15:30:00 |
|||
| 30/2009-10/EE/BSNL/CD-I/CHD | hiring of vehicle4674.htm | 30NIT094674.pdf | Hiring of vehicles for O/o Chief Engineer(c) and Superintending Engineer(C)-I, BSNL, Chandigarh. | 19-02-2010 15:00:00 |
19-02-2010 15:30:00 |
||
| hiring of vehicle4674.htm | 30NIT094674.pdf | Hiring of vehicles for O/o Chief Engineer(c) and Superintending Engineer(C)-I, BSNL, Chandigarh. | 19-02-2010 15:00:00 |
19-02-2010 15:30:00 |
|||
| 79EEBSNLCDASR2009-10 dated: 08.02.2010 | NIT Raising4661.htm | Tender Raising ASR-II4661.doc | Raising of Cable duct Manholes and Hand Holes under the area of SDO Phones City-II Amritsar | 18-02-2010 15:00:00 |
18-02-2010 15:30:00 |
||
| APPLICATION Raising ASR-II4662.doc | Raising of Cable duct Manholes and Hand Holes under the area of SDO Phones City-II Amritsar | 18-02-2010 15:00:00 |
18-02-2010 15:30:00 |
||||
| 80EEBSNLCDASR2009-10 dated 08.02.2010 | NIT ASR-I4663.htm | Tender Sealing ASR-I4663.doc | Sealing of cable entry points in cable duct Chambers and raisingSealing of cable entry points in cable duct Chambers and raising of Cable duct Manholes at Guru Ravi Das Marg and Ajit Nagar Under DET G | 18-02-2010 15:00:00 |
18-02-2010 15:30:00 |
||
| APPLICATION Sealing ASR-I4664.doc | Sealing of cable entry points in cable duct Chambers and raising of Cable duct Manholes at Guru Ravi Das Marg and Ajit Nagar Under DET Guru Ravidas Telephone Exchange Amritsar | 18-02-2010 15:00:00 |
18-02-2010 15:30:00 |
||||
| 79EEBSNLCDASR2009-10 dated: 08.02.2010 | NIT Raising4661.htm | Tender Raising ASR-II4661.doc | Raising of Cable duct Manholes and Hand Holes under the area of SDO Phones City-II Amritsar | 18-02-2010 15:00:00 |
18-02-2010 15:30:00 |
||
| APPLICATION Raising ASR-II4662.doc | Raising of Cable duct Manholes and Hand Holes under the area of SDO Phones City-II Amritsar | 18-02-2010 15:00:00 |
18-02-2010 15:30:00 |
||||
| 80EEBSNLCDASR2009-10 dated 08.02.2010 | NIT ASR-I4663.htm | Tender Sealing ASR-I4663.doc | Sealing of cable entry points in cable duct Chambers and raisingSealing of cable entry points in cable duct Chambers and raising of Cable duct Manholes at Guru Ravi Das Marg and Ajit Nagar Under DET G | 18-02-2010 15:00:00 |
18-02-2010 15:30:00 |
||
| APPLICATION Sealing ASR-I4664.doc | Sealing of cable entry points in cable duct Chambers and raising of Cable duct Manholes at Guru Ravi Das Marg and Ajit Nagar Under DET Guru Ravidas Telephone Exchange Amritsar | 18-02-2010 15:00:00 |
18-02-2010 15:30:00 |
||||
| 78 EE BSNL CD ASR 2009-10 Dated 5 02 2010 | nit4652.htm | tender 784652.pdf | ARMO to BSNL Buildings and staff Quarters in SSA Pathankot.( SH: Day to day maintenance works in T.E. Building & staff quarters compound at Batala, Jaura Singha and Bhagowal)Phase-II | 16-02-2010 15:00:00 |
16-02-2010 15:30:00 |
||
| APPLICATION 784653.pdf | Application | 16-02-2010 15:00:00 |
16-02-2010 15:30:00 |
||||
| nit4652.htm | tender 784652.pdf | ARMO to BSNL Buildings and staff Quarters in SSA Pathankot.( SH: Day to day maintenance works in T.E. Building & staff quarters compound at Batala, Jaura Singha and Bhagowal)Phase-II | 16-02-2010 15:00:00 |
16-02-2010 15:30:00 |
|||
| APPLICATION 784653.pdf | Application | 16-02-2010 15:00:00 |
16-02-2010 15:30:00 |
||||
| 77 EE BSNL CD ASR 2009 10 Dated 4 02 2010 | nit774650.htm | OP1114650.pdf | A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2009-10 ( SH : Maintenance &Operational jobs in O/O the EE (C) & SDE -I(C) Asr ) PH-111 | 15-02-2010 15:00:00 |
15-02-2010 15:30:00 |
||
| APPLICATION OP1114651.pdf | Application | 15-02-2010 15:00:00 |
15-02-2010 15:30:00 |
||||
| nit774650.htm | OP1114650.pdf | A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2009-10 ( SH : Maintenance &Operational jobs in O/O the EE (C) & SDE -I(C) Asr ) PH-111 | 15-02-2010 15:00:00 |
15-02-2010 15:30:00 |
|||
| APPLICATION OP1114651.pdf | Application | 15-02-2010 15:00:00 |
15-02-2010 15:30:00 |
||||
| 74EEBSNLCDASR200910 dated 01022010 | NIT AM4630.htm | Tender Document AM4630.doc | Annual Maintenance of Automatic Bacteriological Treatment Plant installed in BSNL Compound at Pathankot | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||
| APPLICATION AM4631.doc | Application for Annual Maintenance of Automatic Bacteriological Treatment Plant installed in BSNL Compound at Pathankot | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||||
| 75EEBSNLCDASR2009-10 dated 01.02.2010 | NIT PKT4632.htm | Tender document sealing PKT4632.doc | Sealing of cable entry points in cable duct Chambers on College Road Pathankot | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||
| APPLICATION PKT4633.doc | Sealing of cable entry points in cable duct Chambers on College Road Pathankot | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||||
| 76EEBSNLCDASR2009-10 dated 01.02.2010 | NIT4635.htm | Tender Internal work4635.doc | Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave Internal Work staff quarters | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||
| APPLICATION Internal4636.doc | Application for Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave Internal Work staff quarters | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||||
| 74EEBSNLCDASR200910 dated 01022010 | NIT AM4630.htm | Tender Document AM4630.doc | Annual Maintenance of Automatic Bacteriological Treatment Plant installed in BSNL Compound at Pathankot | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||
| APPLICATION AM4631.doc | Application for Annual Maintenance of Automatic Bacteriological Treatment Plant installed in BSNL Compound at Pathankot | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||||
| 75EEBSNLCDASR2009-10 dated 01.02.2010 | NIT PKT4632.htm | Tender document sealing PKT4632.doc | Sealing of cable entry points in cable duct Chambers on College Road Pathankot | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||
| APPLICATION PKT4633.doc | Sealing of cable entry points in cable duct Chambers on College Road Pathankot | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||||
| 76EEBSNLCDASR2009-10 dated 01.02.2010 | NIT4635.htm | Tender Internal work4635.doc | Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave Internal Work staff quarters | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||
| APPLICATION Internal4636.doc | Application for Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave Internal Work staff quarters | 09-02-2010 15:00:00 |
09-02-2010 15:30:00 |
||||
| Notice Inviting Quotation | NIQ14623.htm | Quotation4623.pdf | Preparation of Structural Design, drawings for the work of Construction of Bridge at NIPER Mohali | 01-02-2010 15:00:00 |
01-02-2010 15:30:00 |
||
| NIQ14623.htm | Quotation4623.pdf | Preparation of Structural Design, drawings for the work of Construction of Bridge at NIPER Mohali | 01-02-2010 15:00:00 |
01-02-2010 15:30:00 |
|||
| 73/EE/BSNL/CD/ASR/2009-10 dated 05.01.2010 | NIT4571.htm | tender ext4571.doc | Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave External Work Staff Quarters) | 18-01-2010 15:00:00 |
18-01-2010 15:30:00 |
||
| APPLICATION Ext4572.doc | Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave External Work Staff Quarters) | 18-01-2010 15:00:00 |
18-01-2010 15:30:00 |
||||
| NIT4571.htm | tender ext4571.doc | Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave External Work Staff Quarters) | 18-01-2010 15:00:00 |
18-01-2010 15:30:00 |
|||
| APPLICATION Ext4572.doc | Special repair work at Bhavishya Nidhi Bhawan(1450 Sqm) and Bhavishya Nidhi Enclave (18285 Sqm) during the year 2009-10 (Sh:- Bhavishya Nidhi Enclave External Work Staff Quarters) | 18-01-2010 15:00:00 |
18-01-2010 15:30:00 |
||||
| 72/EE/BSNL/CD/ASR/2009-10 dated 23.12.2009 | NIT Final4555.htm | Tender Sealing Final4555.doc | Sealing of cable entry points in cable duct Chambers under area SDO(P) City-II Amritsar | 05-01-2010 15:00:00 |
05-01-2010 15:30:00 |
||
| APPLICATION4556.doc | Sealing of cable entry points in cable duct Chambers under area SDO(P) City-II Amritsar | 05-01-2010 15:00:00 |
05-01-2010 15:30:00 |
||||
| NIT Final4555.htm | Tender Sealing Final4555.doc | Sealing of cable entry points in cable duct Chambers under area SDO(P) City-II Amritsar | 05-01-2010 15:00:00 |
05-01-2010 15:30:00 |
|||
| APPLICATION4556.doc | Sealing of cable entry points in cable duct Chambers under area SDO(P) City-II Amritsar | 05-01-2010 15:00:00 |
05-01-2010 15:30:00 |
||||
| 71/EE/BSNL/CD/ASR/2009-10 dated 18.12.09 | NIT4533.htm | tender Focal Point 2nd Call4533.doc | Miscellaneous repairs to SSA store at JHAJELI (Focal Point) Pathankot 2nd Call | 29-12-2009 15:00:00 |
29-12-2009 15:30:00 |
||
| APPLICATION Focal4534.doc | Miscellaneous repairs to SSA store at JHAJELI (Focal Point) Pathankot 2nd Call | 29-12-2009 15:00:00 |
29-12-2009 15:30:00 |
||||
| NIT4533.htm | tender Focal Point 2nd Call4533.doc | Miscellaneous repairs to SSA store at JHAJELI (Focal Point) Pathankot 2nd Call | 29-12-2009 15:00:00 |
29-12-2009 15:30:00 |
|||
| APPLICATION Focal4534.doc | Miscellaneous repairs to SSA store at JHAJELI (Focal Point) Pathankot 2nd Call | 29-12-2009 15:00:00 |
29-12-2009 15:30:00 |
||||
| 69/EE/BSNL/CD/ASR/2009-10 Dated:- 03.12.2009 | NIT ASR4471.htm | Amritsar Tender4471.doc | Construction of foundation & erection of 04 Nos. NBLW type Towers in Amritsar SSA (SH: Erection) | 14-12-2009 15:00:00 |
14-12-2009 15:30:00 |
||
| APPLICATION ASR4472.doc | Construction of foundation & erection of 04 Nos. NBLW type Towers in Amritsar SSA (SH: Erection) | 14-12-2009 15:00:00 |
14-12-2009 15:30:00 |
||||
| 70/EE/BSNL/CD/ASR/2009-10 Dated:- 03.12.2009 | NIT PKT4473.htm | Pathankot Tender4473.doc | Construction of foundation & erection of 03 Nos. NBLW type Towers in Pathankot SSA (SH: Erection) | 14-12-2009 15:00:00 |
14-12-2009 15:30:00 |
||
| APPLICATION Pathankot4474.doc | Construction of foundation & erection of 03 Nos. NBLW type Towers in Pathankot SSA (SH: Erection) | 14-12-2009 15:00:00 |
14-12-2009 15:30:00 |
||||
| 69/EE/BSNL/CD/ASR/2009-10 Dated:- 03.12.2009 | NIT ASR4471.htm | Amritsar Tender4471.doc | Construction of foundation & erection of 04 Nos. NBLW type Towers in Amritsar SSA (SH: Erection) | 14-12-2009 15:00:00 |
14-12-2009 15:30:00 |
||
| APPLICATION ASR4472.doc | Construction of foundation & erection of 04 Nos. NBLW type Towers in Amritsar SSA (SH: Erection) | 14-12-2009 15:00:00 |
14-12-2009 15:30:00 |
||||
| 70/EE/BSNL/CD/ASR/2009-10 Dated:- 03.12.2009 | NIT PKT4473.htm | Pathankot Tender4473.doc | Construction of foundation & erection of 03 Nos. NBLW type Towers in Pathankot SSA (SH: Erection) | 14-12-2009 15:00:00 |
14-12-2009 15:30:00 |
||
| APPLICATION Pathankot4474.doc | Construction of foundation & erection of 03 Nos. NBLW type Towers in Pathankot SSA (SH: Erection) | 14-12-2009 15:00:00 |
14-12-2009 15:30:00 |
||||
| 68/EE/BSNL/CD/ASR/2009-10 dated 27.11.2009 | nit4444.htm | Tender PVC4444.doc | Provision of PVC Tile Flooring in Pursuit Cell Section at Old Trunk Exchange Amritsar. | 11-12-2009 15:00:00 |
11-12-2009 15:30:00 |
||
| APPLICATION Pvc4445.doc | Provision of PVC Tile Flooring in Pursuit Cell Section at Old Trunk Exchange Amritsar. | 11-12-2009 15:00:00 |
11-12-2009 15:30:00 |
||||
| nit4444.htm | Tender PVC4444.doc | Provision of PVC Tile Flooring in Pursuit Cell Section at Old Trunk Exchange Amritsar. | 11-12-2009 15:00:00 |
11-12-2009 15:30:00 |
|||
| APPLICATION Pvc4445.doc | Provision of PVC Tile Flooring in Pursuit Cell Section at Old Trunk Exchange Amritsar. | 11-12-2009 15:00:00 |
11-12-2009 15:30:00 |
||||
| 65/EE/BSNL/CD/ASR/2009-10 dated 25.11.09 | NIT AC4411.htm | tender AC4411.doc | Repair of rooms vacated after dismantling of AC Plant at Ground floor of Telephone Exchange building at Pathankot. | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||
| APPLICATION AC4412.doc | Repair of rooms vacated after dismantling of AC Plant at Ground floor of Telephone Exchange building at Pathankot. | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||||
| 66/EE/BSNL/CD/ASR/2009-10 dated 25.11.09 | NIT Focal point4413.htm | tender Focal Point4413.doc | Miscellaneous repairs to SSA store at JHAJELI (Focal Point) Pathankot | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||
| APPLICATION Focal Point4414.doc | Miscellaneous repairs to SSA store at JHAJELI (Focal Point) Pathankot | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||||
| 67/EE/BSNL/CD/ASR/2009-10 dated 25.11.09 | NIT CCN4415.htm | tender CCN4415.doc | Renovation of CCN Room in Telephone Exchange Building at Dinanagar | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||
| APPLICATION CCN4416.doc | Renovation of CCN Room in Telephone Exchange Building at Dinanagar | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||||
| 65/EE/BSNL/CD/ASR/2009-10 dated 25.11.09 | NIT AC4411.htm | tender AC4411.doc | Repair of rooms vacated after dismantling of AC Plant at Ground floor of Telephone Exchange building at Pathankot. | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||
| APPLICATION AC4412.doc | Repair of rooms vacated after dismantling of AC Plant at Ground floor of Telephone Exchange building at Pathankot. | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||||
| 66/EE/BSNL/CD/ASR/2009-10 dated 25.11.09 | NIT Focal point4413.htm | tender Focal Point4413.doc | Miscellaneous repairs to SSA store at JHAJELI (Focal Point) Pathankot | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||
| APPLICATION Focal Point4414.doc | Miscellaneous repairs to SSA store at JHAJELI (Focal Point) Pathankot | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||||
| 67/EE/BSNL/CD/ASR/2009-10 dated 25.11.09 | NIT CCN4415.htm | tender CCN4415.doc | Renovation of CCN Room in Telephone Exchange Building at Dinanagar | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||
| APPLICATION CCN4416.doc | Renovation of CCN Room in Telephone Exchange Building at Dinanagar | 03-12-2009 15:00:00 |
03-12-2009 15:30:00 |
||||
| 64/EE/BSNL/CD/ASR/2009-10 dated 13.11.2009 | NIT4344.htm | Tender Doc4344.doc | Provision of New water Supply Connection from existing water supply line to under ground tank for fire fighting Purpose. | 23-11-2009 15:00:00 |
23-11-2009 15:30:00 |
||
| APPLICATION4345.doc | Provision of New water Supply Connection from existing water supply line to under ground tank for fire fighting Purpose. | 23-11-2009 15:00:00 |
23-11-2009 15:30:00 |
||||
| NIT4344.htm | Tender Doc4344.doc | Provision of New water Supply Connection from existing water supply line to under ground tank for fire fighting Purpose. | 23-11-2009 15:00:00 |
23-11-2009 15:30:00 |
|||
| APPLICATION4345.doc | Provision of New water Supply Connection from existing water supply line to under ground tank for fire fighting Purpose. | 23-11-2009 15:00:00 |
23-11-2009 15:30:00 |
||||
| 60/EE/BSNL/CD/ASR/2009-10 dated 12.11.2009 | NIT Goal4335.htm | Tender Goal Bagh4335.doc | Maintenance of Horticulture Works in BSNL Compound at P& T colony Goal Bagh Amritsar.. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||
| APPLICATION Goal Bag4336.doc | Maintenance of Horticulture Works in BSNL Compound at P& T colony Goal Bagh Amritsar.. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||||
| 61/EE/BSNL/CD/ASR/2009-10 dated 12.11.2009 | NIT Ranjeet4337.htm | Tender Ranjeet4337.doc | Maintenance of Horticulture Works in BSNL Compound at Ranjit Avenue Amritsar.. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||
| APPLICATION Ranjeet4338.doc | Maintenance of Horticulture Works in BSNL Compound at Ranjit Avenue Amritsar.. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||||
| 62/EE/BSNL/CD/ASR/2009-10 dated 12.11.2009 | NIT Goindwal4339.htm | Tender Goindwal4339.doc | Maintenance of Horticulture Works in BSNL Compound at Goindwal Sahib. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||
| APPLICATION Goindwal4340.doc | Maintenance of Horticulture Works in BSNL Compound at Goindwal Sahib. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||||
| 63/EE/BSNL/CD/ASR/2009-10 dated 12.11.2009 | NIT KSS4341.htm | Tender KSS4341.doc | Maintenance of Horticulture Works in BSNL Compounds at Chheharta & Katra Sher Singh Amritsar. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||
| APPLICATION KSS4342.doc | Maintenance of Horticulture Works in BSNL Compounds at Chheharta & Katra Sher Singh Amritsar. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||||
| 60/EE/BSNL/CD/ASR/2009-10 dated 12.11.2009 | NIT Goal4335.htm | Tender Goal Bagh4335.doc | Maintenance of Horticulture Works in BSNL Compound at P& T colony Goal Bagh Amritsar.. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||
| APPLICATION Goal Bag4336.doc | Maintenance of Horticulture Works in BSNL Compound at P& T colony Goal Bagh Amritsar.. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||||
| 61/EE/BSNL/CD/ASR/2009-10 dated 12.11.2009 | NIT Ranjeet4337.htm | Tender Ranjeet4337.doc | Maintenance of Horticulture Works in BSNL Compound at Ranjit Avenue Amritsar.. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||
| APPLICATION Ranjeet4338.doc | Maintenance of Horticulture Works in BSNL Compound at Ranjit Avenue Amritsar.. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||||
| 62/EE/BSNL/CD/ASR/2009-10 dated 12.11.2009 | NIT Goindwal4339.htm | Tender Goindwal4339.doc | Maintenance of Horticulture Works in BSNL Compound at Goindwal Sahib. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||
| APPLICATION Goindwal4340.doc | Maintenance of Horticulture Works in BSNL Compound at Goindwal Sahib. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||||
| 63/EE/BSNL/CD/ASR/2009-10 dated 12.11.2009 | NIT KSS4341.htm | Tender KSS4341.doc | Maintenance of Horticulture Works in BSNL Compounds at Chheharta & Katra Sher Singh Amritsar. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||
| APPLICATION KSS4342.doc | Maintenance of Horticulture Works in BSNL Compounds at Chheharta & Katra Sher Singh Amritsar. | 20-11-2009 15:00:00 |
20-11-2009 15:30:00 |
||||
| NIT NO:- 57 /EE/BSNL/CD/ASR/2009-10 dated 04/11/2009 | NIT574305.htm | tender hort btl4305.pdf | Maintenance of Horticulture works in B.S.N.L. Compound at Batala, (Distt. Gurdaspur) during the Year 2009-10 ( Phase -II). | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||
| APPLICATION HORT MALL114306.pdf | Application | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||||
| NIT NO:- 58 /EE/BSNL/CD/ASR/2009-10 dated 04/11/2009 | NIT584307.htm | tender hort GRDMl4307.pdf | Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg, Amritsar during theYear 2009-10 ( Phase -II). | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||
| APPLICATION HORT GRDM114308.pdf | Application | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||||
| NIT NO:- 59 /EE/BSNL/CD/ASR/2009-10 dated 04/11/2009 | NIT 594309.htm | hort mall114309.pdf | Maintenance of Horticulture works in B.S.N.L. Compound at Mall Mandi, Amritsar during the Year 2009-10 ( Phase -II). | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||
| APPLICATION HORT MALL114310.pdf | Application | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||||
| NIT NO:- 57 /EE/BSNL/CD/ASR/2009-10 dated 04/11/2009 | NIT574305.htm | tender hort btl4305.pdf | Maintenance of Horticulture works in B.S.N.L. Compound at Batala, (Distt. Gurdaspur) during the Year 2009-10 ( Phase -II). | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||
| APPLICATION HORT MALL114306.pdf | Application | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||||
| NIT NO:- 58 /EE/BSNL/CD/ASR/2009-10 dated 04/11/2009 | NIT584307.htm | tender hort GRDMl4307.pdf | Maintenance of Horticulture works in B.S.N.L. Compound at Guru Ravi Dass Marg, Amritsar during theYear 2009-10 ( Phase -II). | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||
| APPLICATION HORT GRDM114308.pdf | Application | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||||
| NIT NO:- 59 /EE/BSNL/CD/ASR/2009-10 dated 04/11/2009 | NIT 594309.htm | hort mall114309.pdf | Maintenance of Horticulture works in B.S.N.L. Compound at Mall Mandi, Amritsar during the Year 2009-10 ( Phase -II). | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||
| APPLICATION HORT MALL114310.pdf | Application | 16-11-2009 15:00:00 |
16-11-2009 15:30:00 |
||||
| 55/EE/BSNL/CD/ASR/2009-10 Dated:- 20.10.2009 | NIT Pkt 2nd Call4215.htm | tender document PKT 2nd Call4215.doc | Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Erection) 2nd Call | 29-10-2009 15:00:00 |
29-10-2009 15:30:00 |
||
| APPLICATION Pkt 2nd call4216.doc | Application for the work Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Erection) 2nd Call | 29-10-2009 15:00:00 |
29-10-2009 15:30:00 |
||||
| 56/EE/BSNL/CD/ASR/2009-10 Dated:- 21.10.2009 | NIT ASR 2nd Call4223.htm | Tender 2nd call Amritsar4223.doc | Construction of foundation & erection of 05 Nos. TCS type Towers in Amritsar SSA (SH: Erection) 2nd Call | 29-10-2009 15:00:00 |
29-10-2009 15:30:00 |
||
| APPLICATION 2nd call Asr4224.doc | Application for the work Construction of foundation & erection of 05 Nos. TCS type Towers in Amritsar SSA (SH: Erection) 2nd Call | 29-10-2009 15:00:00 |
29-10-2009 15:30:00 |
||||
| 55/EE/BSNL/CD/ASR/2009-10 Dated:- 20.10.2009 | NIT Pkt 2nd Call4215.htm | tender document PKT 2nd Call4215.doc | Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Erection) 2nd Call | 29-10-2009 15:00:00 |
29-10-2009 15:30:00 |
||
| APPLICATION Pkt 2nd call4216.doc | Application for the work Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Erection) 2nd Call | 29-10-2009 15:00:00 |
29-10-2009 15:30:00 |
||||
| 56/EE/BSNL/CD/ASR/2009-10 Dated:- 21.10.2009 | NIT ASR 2nd Call4223.htm | Tender 2nd call Amritsar4223.doc | Construction of foundation & erection of 05 Nos. TCS type Towers in Amritsar SSA (SH: Erection) 2nd Call | 29-10-2009 15:00:00 |
29-10-2009 15:30:00 |
||
| APPLICATION 2nd call Asr4224.doc | Application for the work Construction of foundation & erection of 05 Nos. TCS type Towers in Amritsar SSA (SH: Erection) 2nd Call | 29-10-2009 15:00:00 |
29-10-2009 15:30:00 |
||||
| 51/EE/BSNL/CD/ASR/2009-10 Dated:- 08.10.2009 | NIT ASR4166.htm | tender document ASR4166.doc | Construction of foundation & erection of 05 Nos. TCS type Towers in Amritsar SSA (SH: Erection) | 19-10-2009 15:00:00 |
19-10-2009 15:30:00 |
||
| APPLICATION ASR4167.doc | Application for the workConstruction of foundation & erection of 05 Nos. TCS type Towers in Amritsar SSA (SH: Erection) | 19-10-2009 15:00:00 |
19-10-2009 15:30:00 |
||||
| 52/EE/BSNL/CD/ASR/2009-10 Dated:- 08.10.2009 | NIT PKT4168.htm | tender document PKT4168.doc | Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Erection) | 19-10-2009 15:00:00 |
19-10-2009 15:30:00 |
||
| APPLICATION PKT4169.doc | Application for the workConstruction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Erection) | 19-10-2009 15:00:00 |
19-10-2009 15:30:00 |
||||
| 51/EE/BSNL/CD/ASR/2009-10 Dated:- 08.10.2009 | NIT ASR4166.htm | tender document ASR4166.doc | Construction of foundation & erection of 05 Nos. TCS type Towers in Amritsar SSA (SH: Erection) | 19-10-2009 15:00:00 |
19-10-2009 15:30:00 |
||
| APPLICATION ASR4167.doc | Application for the workConstruction of foundation & erection of 05 Nos. TCS type Towers in Amritsar SSA (SH: Erection) | 19-10-2009 15:00:00 |
19-10-2009 15:30:00 |
||||
| 52/EE/BSNL/CD/ASR/2009-10 Dated:- 08.10.2009 | NIT PKT4168.htm | tender document PKT4168.doc | Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Erection) | 19-10-2009 15:00:00 |
19-10-2009 15:30:00 |
||
| APPLICATION PKT4169.doc | Application for the workConstruction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Erection) | 19-10-2009 15:00:00 |
19-10-2009 15:30:00 |
||||
| 53/EE/BSNL/CD/ASR/2009-10 dated 09.10.2009 | NIT horti4175.htm | Tender Document Horticulture4175.doc | Horticulture works and Upkeeping of Lawns/ Plants in T.E Compound Pathankot and Gurdaspur during the year 2009-10 ( October 2009 to March 2010 ) | 16-10-2009 15:00:00 |
16-10-2009 15:30:00 |
||
| APPLICATION Horti4176.doc | Application for the work of Horticulture works and Upkeeping of Lawns/ Plants in T.E Compound Pathankot and Gurdaspur during the year 2009-10 ( October 2009 to March 2010 ) | 16-10-2009 15:00:00 |
16-10-2009 15:30:00 |
||||
| 54/EE/BSNL/CD/ASR/2009-10 dated 09.10.2009 | NIT Oper4177.htm | Tender Document Operational4177.doc | Maintenance & Operational Jobs in O/o the SDE (C), Pathankot during the year 2009-10 ( October 2009 to March 2010 ) | 16-10-2009 15:00:00 |
16-10-2009 15:30:00 |
||
| APPLICATION Oper4178.doc | Application for the work of Maintenance & Operational Jobs in O/o the SDE (C), Pathankot during the year 2009-10 ( October 2009 to March 2010 ) | 16-10-2009 15:00:00 |
16-10-2009 15:30:00 |
||||
| 53/EE/BSNL/CD/ASR/2009-10 dated 09.10.2009 | NIT horti4175.htm | Tender Document Horticulture4175.doc | Horticulture works and Upkeeping of Lawns/ Plants in T.E Compound Pathankot and Gurdaspur during the year 2009-10 ( October 2009 to March 2010 ) | 16-10-2009 15:00:00 |
16-10-2009 15:30:00 |
||
| APPLICATION Horti4176.doc | Application for the work of Horticulture works and Upkeeping of Lawns/ Plants in T.E Compound Pathankot and Gurdaspur during the year 2009-10 ( October 2009 to March 2010 ) | 16-10-2009 15:00:00 |
16-10-2009 15:30:00 |
||||
| 54/EE/BSNL/CD/ASR/2009-10 dated 09.10.2009 | NIT Oper4177.htm | Tender Document Operational4177.doc | Maintenance & Operational Jobs in O/o the SDE (C), Pathankot during the year 2009-10 ( October 2009 to March 2010 ) | 16-10-2009 15:00:00 |
16-10-2009 15:30:00 |
||
| APPLICATION Oper4178.doc | Application for the work of Maintenance & Operational Jobs in O/o the SDE (C), Pathankot during the year 2009-10 ( October 2009 to March 2010 ) | 16-10-2009 15:00:00 |
16-10-2009 15:30:00 |
||||
| NIT NO:- 49 /EE/BSNL/CD/ASR/2009-10 dated 22/09/2009 | NIT 494125.htm | armo hort jdg4125.pdf | Maintenance of Horticulture works in B.S.N.L. Compound at Jandiala Guru ( Amritsar) during theYear 2009-10 ( Phase -11). | 01-10-2009 15:00:00 |
01-10-2009 15:30:00 |
||
| APPLICATION hort jdg4126.pdf | Maintenance of Horticulture works in B.S.N.L. Compound at Jandiala Guru ( Amritsar) during theYear 2009-10 ( Phase -11). | 01-10-2009 15:00:00 |
01-10-2009 15:30:00 |
||||
| NIT NO:- 50 /EE/BSNL/CD/ASR/2009-10 dated 22/09/2009 | NIT 504127.htm | ARMO JAGDEV KALAN4127.pdf | A/R & M/O to T.E. Building and boundary wall at Jagdev Kalan during the year 2009-10. | 01-10-2009 15:00:00 |
01-10-2009 15:30:00 |
||
| APPLICATION ajn4128.pdf | Application | 01-10-2009 15:00:00 |
01-10-2009 15:30:00 |
||||
| NIT NO:- 49 /EE/BSNL/CD/ASR/2009-10 dated 22/09/2009 | NIT 494125.htm | armo hort jdg4125.pdf | Maintenance of Horticulture works in B.S.N.L. Compound at Jandiala Guru ( Amritsar) during theYear 2009-10 ( Phase -11). | 01-10-2009 15:00:00 |
01-10-2009 15:30:00 |
||
| APPLICATION hort jdg4126.pdf | Maintenance of Horticulture works in B.S.N.L. Compound at Jandiala Guru ( Amritsar) during theYear 2009-10 ( Phase -11). | 01-10-2009 15:00:00 |
01-10-2009 15:30:00 |
||||
| NIT NO:- 50 /EE/BSNL/CD/ASR/2009-10 dated 22/09/2009 | NIT 504127.htm | ARMO JAGDEV KALAN4127.pdf | A/R & M/O to T.E. Building and boundary wall at Jagdev Kalan during the year 2009-10. | 01-10-2009 15:00:00 |
01-10-2009 15:30:00 |
||
| APPLICATION ajn4128.pdf | Application | 01-10-2009 15:00:00 |
01-10-2009 15:30:00 |
||||
| NIT NO:- 46 /EE/BSNL/CD/ASR/2009-10 dated 22/09/2009 | NIT464119.htm | tender OP-II4119.pdf | A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2009-10 ( SH : Maintenance &Operational jobs in O/O the EE (C) & SDE -I(C) Asr ) PH-1I | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||
| APPLICATION OPII4120.pdf | Application | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||||
| NIT NO:- 47 /EE/BSNL/CD/ASR/2009-10 dated 22/09/2009 | NIT474121.htm | armo ajn4121.pdf | ARMO to T.E building and Boundary wall at Ajnala ( Asr) during the year 2009-10 | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||
| APPLICATION ajn4122.pdf | Application | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||||
| NIT NO:- 48 /EE/BSNL/CD/ASR/2009-10 dated 22/09/2009 | NIT484123.htm | MH COVERTENDER4123.pdf | Provision of Manhole covers on the Existing Manholes near rented T.E. Building at Tarntaran road, Amritsar. | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||
| APPLICATION ajn4124.pdf | Provision of Manhole covers on the Existing Manholes near rented T.E. Building at Tarntaran road, Amritsar. | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||||
| NIT NO:- 46 /EE/BSNL/CD/ASR/2009-10 dated 22/09/2009 | NIT464119.htm | tender OP-II4119.pdf | A/R & M/O to BSNL Buildings and staff Quarters at SSA Amritsar during year 2009-10 ( SH : Maintenance &Operational jobs in O/O the EE (C) & SDE -I(C) Asr ) PH-1I | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||
| APPLICATION OPII4120.pdf | Application | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||||
| NIT NO:- 47 /EE/BSNL/CD/ASR/2009-10 dated 22/09/2009 | NIT474121.htm | armo ajn4121.pdf | ARMO to T.E building and Boundary wall at Ajnala ( Asr) during the year 2009-10 | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||
| APPLICATION ajn4122.pdf | Application | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||||
| NIT NO:- 48 /EE/BSNL/CD/ASR/2009-10 dated 22/09/2009 | NIT484123.htm | MH COVERTENDER4123.pdf | Provision of Manhole covers on the Existing Manholes near rented T.E. Building at Tarntaran road, Amritsar. | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||
| APPLICATION ajn4124.pdf | Provision of Manhole covers on the Existing Manholes near rented T.E. Building at Tarntaran road, Amritsar. | 30-09-2009 15:00:00 |
30-09-2009 15:30:00 |
||||
| 45/EE/BSNL/CD/ASR/2009-10 dated 04.09.09 | NIT4067.htm | tender4067.doc | “Special repair work at Bhavishya Nidhi Bhavan (1450 sqm) and Bhavishaya Nidhi Enclave (18285 sqm) during year 2009-10 SH: Bhavishya Nidhi Bhavan & Boundary wall” | 14-09-2009 15:00:00 |
14-09-2009 15:30:00 |
||
| APPLICATION4068.doc | Application for the work “Special repair work at Bhavishya Nidhi Bhavan (1450 sqm) and Bhavishaya Nidhi Enclave (18285 sqm) during year 2009-10 SH: Bhavishya Nidhi Bhavan & Boundary wall” | 14-09-2009 15:00:00 |
14-09-2009 15:30:00 |
||||
| NIT4067.htm | tender4067.doc | “Special repair work at Bhavishya Nidhi Bhavan (1450 sqm) and Bhavishaya Nidhi Enclave (18285 sqm) during year 2009-10 SH: Bhavishya Nidhi Bhavan & Boundary wall” | 14-09-2009 15:00:00 |
14-09-2009 15:30:00 |
|||
| APPLICATION4068.doc | Application for the work “Special repair work at Bhavishya Nidhi Bhavan (1450 sqm) and Bhavishaya Nidhi Enclave (18285 sqm) during year 2009-10 SH: Bhavishya Nidhi Bhavan & Boundary wall” | 14-09-2009 15:00:00 |
14-09-2009 15:30:00 |
||||
| NIT NO-44/EE/BSNL/CD/ASR/2009-10 dated 02.09.2009 | nit4051.htm | tender document4051.pdf | Sealing of cable entry points in cable duct chambers at chowk Rambagh and chowk Lohgarh Amritsar. | 10-09-2009 15:00:00 |
10-09-2009 15:30:00 |
||
| NIT NO-44/EE/BSNL/CD/ASR/2009-10 dated 02.09.2009 | nit4052.htm | tender document4052.pdf | Sealing of cable entry points in cable duct chambers at chowk Rambagh and chowk Lohgarh Amritsar. | 10-09-2009 15:00:00 |
10-09-2009 15:30:00 |
||
| Application4053.pdf | Sealing of cable entry points in cable duct chambers at chowk Rambagh and chowk Lohgarh Amritsar. | 10-09-2009 15:00:00 |
10-09-2009 15:30:00 |
||||
| NIT NO-44/EE/BSNL/CD/ASR/2009-10 dated 02.09.2009 | nit4051.htm | tender document4051.pdf | Sealing of cable entry points in cable duct chambers at chowk Rambagh and chowk Lohgarh Amritsar. | 10-09-2009 15:00:00 |
10-09-2009 15:30:00 |
||
| NIT NO-44/EE/BSNL/CD/ASR/2009-10 dated 02.09.2009 | nit4052.htm | tender document4052.pdf | Sealing of cable entry points in cable duct chambers at chowk Rambagh and chowk Lohgarh Amritsar. | 10-09-2009 15:00:00 |
10-09-2009 15:30:00 |
||
| Application4053.pdf | Sealing of cable entry points in cable duct chambers at chowk Rambagh and chowk Lohgarh Amritsar. | 10-09-2009 15:00:00 |
10-09-2009 15:30:00 |
||||
| NIT NO:- 41 /EE/BSNL/CD/ASR/2009-10 dated 25/08/2009 | nit 414025.htm | tender shed4025.pdf | A/R & M/O to BSNL Buildings & Staff Quarters in the Area under SSA Pathankot ( SH:- Repair to false ceiling of T.E. Building at Bhagowal) . | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||
| APPLICATION shed bhagowal4026.pdf | Application | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||||
| NIT NO:- 42 /EE/BSNL/CD/ASR/2009-10 dated 25/08/2009 | nit 424027.htm | tender jaura singha4027.pdf | A/R & M/O to BSNL Buildings & Staff Quarters in the Area under SSA Pathankot ( SH:- Repair to false ceiling of T.E. Building at Jaura Singha) . | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||
| APPLICATION shed jaura4028.pdf | Application | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||||
| NIT NO:- 43 /EE/BSNL/CD/ASR/2009-10 dated 25/08/2009 | NIT 434029.htm | tender jaura and bhagowal4029.pdf | A/R & M/O to BSNL Buildings & Staff Quarters in the Area under SSA Pathankot( SH:- Minor Repair works in T.E. Compound at Bhagowal,Jaurasingha & Batala. ) . | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||
| APPLICATION shed jand bhag4030.pdf | Application | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||||
| NIT NO:- 41 /EE/BSNL/CD/ASR/2009-10 dated 25/08/2009 | nit 414025.htm | tender shed4025.pdf | A/R & M/O to BSNL Buildings & Staff Quarters in the Area under SSA Pathankot ( SH:- Repair to false ceiling of T.E. Building at Bhagowal) . | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||
| APPLICATION shed bhagowal4026.pdf | Application | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||||
| NIT NO:- 42 /EE/BSNL/CD/ASR/2009-10 dated 25/08/2009 | nit 424027.htm | tender jaura singha4027.pdf | A/R & M/O to BSNL Buildings & Staff Quarters in the Area under SSA Pathankot ( SH:- Repair to false ceiling of T.E. Building at Jaura Singha) . | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||
| APPLICATION shed jaura4028.pdf | Application | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||||
| NIT NO:- 43 /EE/BSNL/CD/ASR/2009-10 dated 25/08/2009 | NIT 434029.htm | tender jaura and bhagowal4029.pdf | A/R & M/O to BSNL Buildings & Staff Quarters in the Area under SSA Pathankot( SH:- Minor Repair works in T.E. Compound at Bhagowal,Jaurasingha & Batala. ) . | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||
| APPLICATION shed jand bhag4030.pdf | Application | 04-09-2009 15:00:00 |
04-09-2009 15:30:00 |
||||
| 39/EE/BSNL/CD/ASR/2009-10 Dated:-21.08.2009 | NIT ASR4000.htm | tender document ASR4000.pdf | “Construction of foundation & erection of 04 Nos NBLW Towers in Amritsar SSA (SH:- Foundation)”. | 31-08-2009 15:00:00 |
31-08-2009 15:30:00 |
||
| Application ASR4001.doc | Application for the work“Construction of foundation & erection of 04 Nos NBLW Towers in Amritsar SSA (SH:- Foundation)”. | 31-08-2009 15:00:00 |
31-08-2009 15:30:00 |
||||
| 40/EE/BSNL/CD/ASR/2009-10 Dated:-21.08.2009 | NIT PKT4002.htm | tender document PKT4002.pdf | Construction of foundation & erection of 03 Nos NBLW Towers in Pathankot SSA (SH:- Foundation) | 31-08-2009 15:00:00 |
31-08-2009 15:30:00 |
||
| Application Pkt4003.doc | Application for the work Construction of foundation & erection of 03 Nos NBLW Towers in Pathankot SSA (SH:- Foundation) | 31-08-2009 15:00:00 |
31-08-2009 15:30:00 |
||||
| 37/EE/BSNL/CD/ASR/2009-10 Dated:- 12.08.2009 | Corrigendum4006.doc | applicatin for Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Foundation)”. | 31-08-2009 15:30:00 |
||||
| 39/EE/BSNL/CD/ASR/2009-10 Dated:-21.08.2009 | NIT ASR4000.htm | tender document ASR4000.pdf | “Construction of foundation & erection of 04 Nos NBLW Towers in Amritsar SSA (SH:- Foundation)”. | 31-08-2009 15:00:00 |
31-08-2009 15:30:00 |
||
| Application ASR4001.doc | Application for the work“Construction of foundation & erection of 04 Nos NBLW Towers in Amritsar SSA (SH:- Foundation)”. | 31-08-2009 15:00:00 |
31-08-2009 15:30:00 |
||||
| 40/EE/BSNL/CD/ASR/2009-10 Dated:-21.08.2009 | NIT PKT4002.htm | tender document PKT4002.pdf | Construction of foundation & erection of 03 Nos NBLW Towers in Pathankot SSA (SH:- Foundation) | 31-08-2009 15:00:00 |
31-08-2009 15:30:00 |
||
| Application Pkt4003.doc | Application for the work Construction of foundation & erection of 03 Nos NBLW Towers in Pathankot SSA (SH:- Foundation) | 31-08-2009 15:00:00 |
31-08-2009 15:30:00 |
||||
| 37/EE/BSNL/CD/ASR/2009-10 Dated:- 12.08.2009 | Corrigendum4006.doc | applicatin for Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Foundation)”. | 31-08-2009 15:30:00 |
||||
| 38/EE/BSNL/CD/ASR/2009-10 dated 18.08.2009 | NIT-ASR3983.htm | Tender Doc Asr-I3983.pdf | “Day To Day Maintenance of BSNL buildings and staff quarters under BSNL civil sub division –I(Except SDCA Batala) Amritsar during the year of 2009-10” | 27-08-2009 15:00:00 |
27-08-2009 15:30:00 |
||
| APPLICATION day to day Asr-I3984.pdf | Application for the work “Day To Day Maintenance of BSNL buildings and staff quarters under BSNL civil sub division –I(Except SDCA Batala) Amritsar during the year of 2009-10” | 27-08-2009 15:00:00 |
27-08-2009 15:30:00 |
||||
| NIT-ASR3983.htm | Tender Doc Asr-I3983.pdf | “Day To Day Maintenance of BSNL buildings and staff quarters under BSNL civil sub division –I(Except SDCA Batala) Amritsar during the year of 2009-10” | 27-08-2009 15:00:00 |
27-08-2009 15:30:00 |
|||
| APPLICATION day to day Asr-I3984.pdf | Application for the work “Day To Day Maintenance of BSNL buildings and staff quarters under BSNL civil sub division –I(Except SDCA Batala) Amritsar during the year of 2009-10” | 27-08-2009 15:00:00 |
27-08-2009 15:30:00 |
||||
| 37/EE/BSNL/CD/ASR/2009-10 Dated:- 12.08.2009 | NIT Pkt3974.htm | tender document PKT3974.pdf | Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Foundation)”. | 24-08-2009 15:00:00 |
24-08-2009 15:30:00 |
||
| 37/EE/BSNL/CD/ASR/2009-10 Dated:- 12.08.2009 | NIT Pkt3975.htm | Application- Pkt3975.doc | applicatin for Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Foundation)”. | 24-08-2009 15:00:00 |
24-08-2009 15:30:00 |
||
| 37/EE/BSNL/CD/ASR/2009-10 Dated:- 12.08.2009 | NIT Pkt3974.htm | tender document PKT3974.pdf | Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Foundation)”. | 24-08-2009 15:00:00 |
24-08-2009 15:30:00 |
||
| 37/EE/BSNL/CD/ASR/2009-10 Dated:- 12.08.2009 | NIT Pkt3975.htm | Application- Pkt3975.doc | applicatin for Construction of foundation & erection of 03 Nos. TCS type Towers in Pathankot SSA (SH: Foundation)”. | 24-08-2009 15:00:00 |
24-08-2009 15:30:00 |
||
| 35/EE/BSNL/CD/ASR/2009-10 dated 07.08.09 | NIT3959.htm | tender document3959.pdf | Construction of foundation & erection of 5 Nos. TCS type Towers in Amritsar SSA (SH: Foundation) Estimated cost Rs. 14,79,394/-. Earnest money Rs. 29,588/- | 20-08-2009 15:00:00 |
20-08-2009 15:30:00 |
||
| Application3960.doc | application for Construction of foundation & erection of 5 Nos. TCS type Towers in Amritsar SSA (SH: Foundation) | 20-08-2009 15:00:00 |
20-08-2009 15:30:00 |
||||
| NIT3959.htm | tender document3959.pdf | Construction of foundation & erection of 5 Nos. TCS type Towers in Amritsar SSA (SH: Foundation) Estimated cost Rs. 14,79,394/-. Earnest money Rs. 29,588/- | 20-08-2009 15:00:00 |
20-08-2009 15:30:00 |
|||
| Application3960.doc | |||||||